Error handling and diagnostics
CXxxxx-M930/B930
37
Version: 1.1
6
Error handling and diagnostics
6.1
Diagnostic LEDs
Table 1: PN diagnostic LED, description of the flashing behavior.
Display
LED
PROFINET status
Meaning
green
red
FB1
PWR
TC
FB2
HDD
Cxxxx0
PN
DIAG
PN
off
flashing 200ms
Power on, startup phase
200 ms flashing
off
no PROFINET name
1 sec off, 200 ms
on
off
No IP address
on
off
Run
Table 2: DIAG diagnostic LED, description of the flashing behavior.
Display
LED
PROFINET diagnosis
Meaning
green
red
FB1
PWR
TC
FB2
HDD
Cxxxx0
PN
DIAG
DIAG
500 ms flashing
500 ms flashing
PN controller identification.
The PN controller is
transmitting an identification
signal.
off
200 ms flashing
The establishment of a
connection with the
controller has not been
completed.
1 s off 200, ms on off
Problem when establishing
a connection, or the actual
and target configurations
are different.
200 ms
off
The device is in data
exchange but the PLC is in
Stop mode.
on
off
The device is in data
exchange.
If a virtual PROFINET slave was configured, this is also covered by the LEDs in the event of an error. The
physical device always has higher priority. The status of the virtual slave is only displayed once everything is
OK with the physical device.
Содержание CX-B930 Series
Страница 2: ......
Страница 4: ...Table of contents CXxxxx M930 B930 4 Version 1 1...
Страница 47: ......