Installation 

 

3.4  Fitting the power supply cable 

Fit the cables for the power supply of the Industrial PC, the connection of the battery pack as well as the 
connection of the power-switch in accordance with the wiring diagram, using the included material for 
assembling the connectors: 

Material for assembling the connectors 

Plug connector 8-pole,  Strain relief housing with lacing cord

 

 

Conductive cross-section 

 

Note 

The connector is specified for 16 A and can lift conductive cross-sections until 1.5 mm

2

.

 

So the connector is fitted to the cable: 

1.  Strip insulation from the cable ends (Length of stripped conductor is 8 – 9 mm). 

2.  Screw together the cable ends in the 8-pole plug connector in accordance with wiring diagram. 

 

Applying the strain relief 

Thread the lacing cord into that lower part of the strain relief 
housing. 

 

Putting in the plug connector 

Put the plug connector into that lower part of the strain relief 
housing. 

Tighten the lacing cord and pinch off the plastic strap. 

 

 

Fixing the upper part of the strain relief housing 

Fix the upper part of the strain relief housing by snapping it onto 
the lower part. 

 

 

CP27xx 

17 

Содержание CP27 Series

Страница 1: ...Installation and Operating instructions for CP27xx Fanless multi touch built in Panel PC Version 1 1 Date 2018 11 23...

Страница 2: ......

Страница 3: ...Appropriate Use 9 2 3 Access to the connectors 9 2 4 Interfaces 10 2 4 1 DVI I out Digital Visual Interface X103 10 2 4 2 USB output X104 X107 10 2 4 3 Network connection LAN1 LAN2 X 108 X109 10 2 4 4...

Страница 4: ...uctions 21 4 1 Switching the Panel PC on and off 21 4 1 1 Switching on 21 4 1 2 Shutting down and switching off 21 4 1 3 First switching on and driver installation 21 4 2 Operation 21 4 3 Servicing an...

Страница 5: ...Table of contents 9 3 FCC Approvals for the United States of America 28 9 4 FCC Approval for Canada 28 CP27xx 3...

Страница 6: ...C and XTS are registered trademarks of and licensed by Beckhoff Automation GmbH Other designations used in this publication may be trademarks whose use by third parties for their own purposes could vi...

Страница 7: ...duals Risk of injury WARNING If you do not adhere the safety advise adjoining this symbol there is danger to life and health of individuals Hazard to individuals CAUTION If you do not adhere the safet...

Страница 8: ...all parts of the equipment must first be switched off after which the Panel PC is to be disconnected from the equipment Disconnect the device by unplugging the connectors on the rear side of the Panel...

Страница 9: ...t Do not open the housing of the Panel PC Note For technical support contact Beckhoff Service 1 4 1 National regulations Depending on the type of machine and plant in which the Panel PC is used nation...

Страница 10: ...ion With their highly integrated 3 inch motherboards the CP27xx built in Industrial PCs represent a high performance platform for machine construction and plant engineering applications The multi touc...

Страница 11: ...ering A multi touch display is accommodated in an aluminium housing The Panel PC is installed in the front of control cabinets Risk of explosion Danger The Panel PC must not be used where there is a r...

Страница 12: ...d 2 4 3 Network connection LAN1 LAN2 X 108 X109 The RJ 45 connectors X108 X109 allow the PC to be connected to a 10 100 1000BASE T Local Area Network LAN 2 4 4 Power Supply X110 The power supply for t...

Страница 13: ...type recommended by the manufacturer Notice correct polarity 2 6 Extension for PCIe plug in cards When ordered with the corresponding option the Panel PC can be extended by one additional plug in card...

Страница 14: ...ture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur a delay time of approximately 12 hour...

Страница 15: ...n the Panel PC in such a way that reflections on the screen are avoided as far as possible Use the position of the screen as a guide for the correct installation height it should be optimally visible...

Страница 16: ...ping levers For the cutout dimension of the Panel PC see chapter Technical Data the wall thickness is between 1 mm and 5 mm 1 Insert the Panel PC into the cutout 2 Release the clamping levers with a 3...

Страница 17: ...the Industrial PC is provided with a power supply unit with integrated UPS order option you can realize an uninterruptible power supply UPS using the battery pack C9900 U330 Danger of Explosion WARNIN...

Страница 18: ...hat indicates that the process is complete and that the main voltage can be switched off This can be done manually via a signal lamp connection or via a contactor With this solution the main switch ge...

Страница 19: ...ft conductive cross sections until 1 5 mm2 So the connector is fitted to the cable 1 Strip insulation from the cable ends Length of stripped conductor is 8 9 mm 2 Screw together the cable ends in the...

Страница 20: ...nal 24 V power supply Use same type of rechargeable battery Attention If a 24 V UPS is installed the same type of rechargeable battery must be used 3 5 3 Configuration for shutting down the PC The con...

Страница 21: ...n after a power failure The maximum load is 1 4 A Once the PC has been de energized via the UPS software the UPS output is switched to 0 V Any connected panel is thus switched off and total discharge...

Страница 22: ...rom the power supply Connect all cables at the Panel PC and at the devices to be connected Ensure that all screw connections between connectors and sockets are tight Reconnect all devices to the power...

Страница 23: ...4 1 3 First switching on and driver installation When you switch on the Industrial PC for the first time the pre installed operating system optional will be started In this case all the required drive...

Страница 24: ...ttery only with the identical type or an alternative type recommended by the manufacturer Notice correct polarity The used battery must be disposed of in accordance with national electronics scrap reg...

Страница 25: ...vers can be installed from the driver CD provided To install the UPS driver software execute file Beckhoff_UPS_vx xx xx exe from the subdirectory of UPS from the CD provided on the Industrial PC Drive...

Страница 26: ...ff Service Panel PC boots software starts but control does not operate correctly Cause of the fault is either in the software or in parts of the plant outside the Panel PC Call the manufacturer of the...

Страница 27: ...e Panels PC please visit our homepage Here you will find the actual drawings using the link http www beckhoff de german download technical_drawings htm Notice mounting orientation Warning The assembly...

Страница 28: ...with 15 display approx 54 W with 21 5 display approx 41 W with 15 6 display approx 64 W with 24 display UL compliance in progress Interfaces 2 Ethernet adapter 10 100 1000BASE T with RJ 45 connection...

Страница 29: ...Co KG Huelshorstweg 20 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 E mail info beckhoff de Web http www beckhoff de Beckhoff Support Support offers you comprehensive technical assis...

Страница 30: ...nerates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equ...

Отзывы: