Table of contents
3.3.1
Pin assignment of the connector
17
3.3.2
Cable Cross Sections
17
3.3.3
Check voltage rating and connect
17
3.3.4
Configuration for shutting down the PC
18
3.3.5
PC_ON and Power Status functions
18
3.4
Connecting the Industrial PC
19
3.4.1
Connecting cables
19
3.4.2
Check voltage rating and connect
19
3.4.3
Earthing measures
19
4
Operating Instructions
20
4.1
Switching the Industrial PC on and off
20
4.1.1
Switch on
20
4.1.2
Shutting down and switching off
20
4.1.3
First switching on and driver installation
20
4.2
Servicing and maintenance
21
4.2.1
Cleaning of the Industrial PC
21
4.2.2
Maintenance 21
4.2.3
Replacing the Battery on the Motherboard
21
4.3
Emergency procedures
21
4.4
Shutting down
21
4.4.1
Disposal
21
5
Troubleshooting 22
6
Assembly dimensions
23
7
Technical Data
25
8
Appendix 26
8.1
Beckhoff Support and Service
26
8.1.1
Beckhoff branches and partner companies
26
8.1.2
Beckhoff company headquarters
26
8.2
Approvals for USA and Canada
27
8.3
FCC Approvals for the United States of America
27
8.4
FCC Approval for Canada
27
2
C6030-0060
Содержание C6030-0060
Страница 2: ......