Figure 16 – Adjusting Plate Initial Setting, Typical

Table 4A – CF1400 Initial Indicator Adjustment Plate 
Settings

CF1400

Tube

Head Position

Damper Position

Approximate
Head Setting

Firing Rate

(gph)

Approximate

Air Damper 

Setting

Firing 

Rate (gph)

A

0

4.00

0

--

1

4.50

10

--

2

5.00

20

4.00

3

6.00

30

5.00

4

7.00

40

7.00

5

7.50

50

8.00

6

8.00

60

10.00

7 9.00

70

11.00

8

9.50

80

--

9

10.00

90

--

10

11.00

100

--

--

--

110

--

--

--

120

--

B

0

7.00

0

--

1

7.50

10

--

2

8.00

20

--

3

9.00

30

--

4

10.00

40

7.00

5

10.50

50

8.00

6

11.00

60

10.00

7 12.00

70

11.00

8

13.00

80

12.00

9

13.25

90

12.50

10

13.60

100

13.00

--

--

110

13.25

--

--

120

13.60

Table 4B – CF2300 Initial Indicator Adjustment Plate 
Settings

CF2300

Tube

Head Position

Damper Position

Approximate 
Head Setting

Firing Rate 

(gph)

Approximate 

Air Damper 

Setting

Firing 

Rate (gph)

A

0

11.0

0

--

1

12.0

10

7.0

2

13.0

20

10.0

3

14.0

30

13.0

4

15.0

40

14.0

5

16.0

50

15.0

6

17.0

60

16.0

7

18.0

70

17.0

8

19.0

80

18.0

9

20.0

90

19.0

--

--

100

20.0

B

0

12.5

0

--

1

13.0

10

10.0

2

14.0

20

13.0

3

15.0

30

14.0

4

16.0

40

15.0

5

17.0

50

16.0

6

18.0

60

17.0

7

18.5

70

18.0

8

19.0

80

18.5

9

20.0

90

19.0

--

--

100

20.0

Legend

b Spline nut for securing nozzle line

c Bottom acorn nut (for head adjustments)

d Top acorn nut (for setting dim. Z only - do not loosen 

after setting Z)

e Indicator adjusting plate

f Secondary adjusting plate

g Primary adjusting plate
h Copper oil line from oil valve to nozzle line

Initial Head Position

The indicator plate assembly (item 

e

) markings 

correspond to head position settings (

Figure 16

).

Slide the secondary adjusting plate (item 

f

) toward 

the rear of the burner until the number on the 
indicator plate corresponds to the initial head setting 
given in 

Tables 4a 

and 

4b

 for the desired 

fi

 ring rate 

and burner (high-

fi

 re).

Figure 16

 shows a typical example, with a head 

setting of 

6

.

When the head position has been set, tighten the 
bottom acorn nut (item 

c

) and the spline nut (item 

b

).

Section: Prepare the Burner for Start-up

Содержание CF1400

Страница 1: ...tion start up or service work Save this manual for future reference y y y Incorrect installation adjustment or misuse of this burner could result in death severe personal injury or substantial propert...

Страница 2: ...which your burner ap pliance is installed Make sure Air ventilation openings are clean and unob structed Nothing is blocking burner inlet air openings No combustible materials are stored near the heat...

Страница 3: ...e read all instructions before proceeding Follow all instructions completely This equipment must be installed adjusted and started by a qualified service agency that is licensed and experienced with a...

Страница 4: ...ed in an isolated room provided with outside combustion air Clearances With the burner installed in the appliance there must be adequate space in front of and on the sides of the burner to allow acces...

Страница 5: ...he appliance dimensions are smaller than recommended reduce the firing rate accordingly Table 1 Nozzle Capacities Rated gph 100 psig Pressure Pounds per square inch 125 140 150 175 200 250 275 300 3 0...

Страница 6: ...ing rate required On the CF2300 there are two tube arrangements available Tube A 7 0 to 19 9 GPH per Figure 3 Tube B 10 0 to 19 9 GPH per Figure 3 The CF2300 maximum firing capacity depends on the fir...

Страница 7: ...loss of burner operation resulting in no heat an unplanned process interruption work stoppage and the potential for frozen plumbing or other cold weather property damage Protect Against Dust and Mois...

Страница 8: ...he end of the nozzle line leaving the nut loosely placed so the plates can be moved Connect the high voltage leads from the ignition transformer to the electrodes Check and adjust if necessary the cri...

Страница 9: ...s than dimension D in Figure 8 Thread the pipe into the flange Secure the burner to the appliance by tightening the nuts on the burner flange mounting studs 1 2 3 4 5 6 Figure 7 Adjusting Plate Assy F...

Страница 10: ...ump k Return line to oil tank m One pipe by pass loop 3 8 p Air bleed valve Figure 9 One pipe Oil Flow with B Pump SK9940 Figure 10 Two pipe Oil Flow with B Pump SK9939 Use continuous lengths of heavy...

Страница 11: ...s energized A flame should be established within the factory set trial for ignition time lockout time Lockout The control has shut down for one of the following safety reasons The trial for ignition l...

Страница 12: ...equence The control will continue to Recycle each time the flame is lost until it reaches a pre set time allotment The control will then go into Hard Lockout instead of recycle This feature prevents e...

Страница 13: ...13 CF1400 CF2300 Burner Manual Figure 13 Typical Wiring 7505P Section Wire the Burner...

Страница 14: ...de The burner starts at Low goes to High after the flame stabilization 1 2 3 4 5 6 a period Flame is extinguished when the load is satisfied or a limit opens and the burner is sent to Motor Off Delay...

Страница 15: ...tart up Professional Installation and Service Required Incorrect installation and mishandling of start up could lead to equipment malfunction and result in asphyxiation explosion or fire This burner m...

Страница 16: ...0 6 17 0 60 16 0 7 18 0 70 17 0 8 19 0 80 18 0 9 20 0 90 19 0 100 20 0 B 0 12 5 0 1 13 0 10 10 0 2 14 0 20 13 0 3 15 0 30 14 0 4 16 0 40 15 0 5 17 0 50 16 0 6 18 0 60 17 0 7 18 5 70 18 0 8 19 0 80 18...

Страница 17: ...to its low fire setting This initial setting should be adequate for starting the burner at low fire Once the burner is in operation the air setting will be adjusted for best performance as discussed l...

Страница 18: ...stment Vapor Filled Appliance Allow the unit to cool off and all vapors to dissipate before attempting another start Oil Flooded Appliance Shut off the electrical power and the oil supply to the burne...

Страница 19: ...Burner Move the low fire hold switch to the low fire hold position to hold burner in low fire when started Verify that the air adjusting cam Figure 17 item d has been set to the initial low fire air...

Страница 20: ...3 12 44 DIA 51498 13 92 DIA 51630 16 00 DIA Flange A Flange B Flange C Check the pump pressure and cutoff function Check primary control safety lockout timing Check ignition system for proper operatio...

Страница 21: ...21 CF1400 CF2300 Burner Manual SK9930 3 2 4 5 6 1 SK9931 8 9 7 Section Replacement Parts Figure 19a Burner Replacement Parts...

Страница 22: ...5994U 5201301U 51204U 5201302U 14 Sight glass All models 31346 31346 15 Head assembly 5978 51203 16 Electrode assembly All models 51212 51212 17 Ignition leads 8 1 4 long 11 3 4 long 15 1 4 long 19 1...

Страница 23: ...23 CF1400 CF2300 Burner Manual Figure 19b Burner Replacement Parts Continued SK9936 SK9932 SK9930 14 13 12 10 20 11 21 22 23 15 16 17 18 19...

Страница 24: ...copy of warranty form 61545 please choose one of the following options Visit our website at www beckettcorp com warranty Email your request to rwb customer service beckettcorp com Write to R W Beckett...

Отзывы: