Содержание 7505A 0000
Страница 1: ......
Страница 3: ...UP Begin by plugging in the Contractors Tool COM port 1 Next slide ...
Страница 4: ...STANDBY 8 15 50 KOHM 115 V PRESS THE NEXT KEY Next slide ...
Страница 5: ...VIEW HISTORY PRESS AND HOLD THE NEXT KEY FOR 3 SECONDS OR UNTIL THE SCREEN CHANGES Next slide ...
Страница 6: ...PRE TIME 0 00 SEL to change PRESS THE SEL YES KEY Next slide ...
Страница 7: ...VALVE INSTALLED No Yes PRESS YES IF AN OIL VALVE OR CLEANCUT PUMP IS INSTALLED Next slide ...
Страница 8: ...PRE TIME 0 00 No Yes PRESS THE NEXT KEY TO SET THE PRE PURGE TIMING Next slide ...
Страница 9: ...PRESS THE SEL YES KEY PRE TIME 0 15 No Yes Next slide ...
Страница 10: ...ACCEPT 0 15 No Yes ACCEPT BY PRESSING THE YES KEY AGAIN Next slide ...
Страница 11: ...PRE TIME IS NOW SET PRESS NEXT TO SET THE POST PURGE PRE TIME 0 15 SEL to change Next slide ...
Страница 12: ...POST TIME 0 00 SEL to change PRESS THE SEL YES KEY Next slide ...
Страница 13: ...VALVE INSTALLED No Yes PRESS YES IF AN OIL VALVE OR CLEANCUT PUMP IS INSTALLED Next slide ...
Страница 14: ...POST TIME 0 00 No Yes PRESS THE NEXT KEY TO SET THE POST PURGE TIMING Next slide ...
Страница 15: ...POST TIME 2 00 No Yes PRESS THE SEL YES KEY Next slide ...
Страница 16: ...ACCEPT 2 00 No Yes Next slide ACCEPT BY PRESSING THE YES KEY AGAIN ...
Страница 17: ...POST TIME 2 00 SEL to change POST TIME IS NOW SET PRESS THE BACK KEY TO EXIT ...