![Bearcat BC-502/CRC Скачать руководство пользователя страница 112](http://html1.mh-extra.com/html/bearcat/bc-502-crc/bc-502-crc_instruction-manual_2717123112.webp)
BC-502/CRC
112
Pump T-4
Meter material from the tank (C valve), thru the pump and out the (D
Valve). Based on FPM (if moving), Spread Rate and Bar width. Pump
circulates thru F with Master Off.
a.
Connect asphalt hose from the external spray bar to the D valve,
and open pertaining valves.
b.
Select “Pump T-4” and press OK.
c.
Select Spread heat and Pump Forward.
d.
Operate as if spreading, Use the Master switch to start the
metering.
Содержание BC-502/CRC
Страница 1: ...INSTRUCTION MANUAL Model BC 502 CRC Asphalt Distributor ...
Страница 42: ...BC 502 CRC 42 ...
Страница 43: ...43 ...
Страница 69: ...69 ...
Страница 87: ...87 Stage 1 ...
Страница 118: ...BC 502 CRC 118 Step 5 Steps 2 through 4 are repeated on the right hand side of the area to produce the pattern shown ...
Страница 149: ...149 Figure 6 BURNER Figure 7 FLUSH TANK Figure 9 REAR ASSEMBLY Figure 8 MECHANICAL LINKAGE ASSEMBLY ...
Страница 150: ...150 Figure 11 TRI VALVE INNER WING ASSEMBLY Figure 10 SPRAYBAR ASSEMBLY Figure 12 REAR CONTROL ASSEMBLY ...
Страница 151: ...151 Figure 13 INNER WING ASSEMBLY Figure 14 HYDRAULIC SYSTEM ...
Страница 152: ...152 Figure 15 REAR PANEL ASSEMBLY ...
Страница 154: ...154 Figure 17 PUMBING AND VALVE ASSEMBLY ...
Страница 156: ...156 Figure 19 PUMP DRIVE ASSEMBLY ...
Страница 157: ...157 Figure 20 PRODUCT PUMP ...
Страница 158: ...158 Figure 21 SIDE CONTROL BOX SCHEMATIC ...
Страница 159: ...159 Figure 22 CAB CONSOLE SCHEMATIC ...
Страница 160: ...160 Figure 23 VALVE BOX SCHEMATIC ...
Страница 161: ...161 Figure 24 REAR CONTROL BOX SCHEMATIC ...
Страница 162: ...162 Figure 25 REAR CONTROL BOX PROPANE SCHEMATIC ...
Страница 163: ...163 Figure 26 HYDRAULIC LAYOUT ...
Страница 164: ...164 Figure 27 HYDRAULIC SCHEMATIC ...