background image

FOUR

 

POST

 

LIFT

 

30-4140A 

30-4140AE

30-4140A

30-4140AE

Содержание 30-4140A

Страница 1: ...FOUR POST LIFT 30 4140A 30 4140AE 30 4140A 30 4140AE...

Страница 2: ...NTENTS Product Features and Specifications 1 Installation Requirement 2 Steps of Installation 4 Exploded View 23 Test Run 32 Operation Instruction 33 Maintenance 33 Trouble Shooting 34 Lift Disposal 3...

Страница 3: ...Optional Jack With hand pump Air operated hydraulic pump Controlled by power unit Optional Turnplate only for 30 4140A 30 4140AE MODEL SPECIFICATIONS Model Lifting Capacity Lifting Height Lifting Time...

Страница 4: ...LS REQUIRED Rotary Hammer Drill 19 Carpenter s Chalk Hammer Screw Sets Level Bar Tape Measure 7 5m English Spanner 12 Pliers Wrench Set Lock Wrench 10 12 13 14 17 19 24 30 Ratchet Spanner With Socket...

Страница 5: ...Concrete must be thickness 7 7 8 mm minimum and without reinforcing steel bars and must be dried completely before the installation 2 Concrete must be in good condition and must be of test strength 3...

Страница 6: ...e for lift installation B Check the Parts Before Assembly 1 The equipment should be unload and transfer by forklift See Fig 6 2 Packaged lift and Hydraulic Power Unit See Fig 6 3 Open the outer packin...

Страница 7: ...rews of the upper package stand take off the offside platform take out the parts inside the power side platform than remove the package stand 6 Move aside the parts and check the parts according to th...

Страница 8: ...6 6 2 PRO 14A PRO 14AE 7 Open the carton of parts and check the parts according to the parts box list See Fig 11 Fig 11 Fig 10...

Страница 9: ...7 8 Check the parts of the parts bag according to the parts bag list See Fig 13 Fig 13 Parts bag 2 Parts bag 1 for PRO 14A PRO 14AE Parts bag 1 for PRO 14 PRO 14E...

Страница 10: ...sure the size is right and base is flat see Fig 14 Note Reserve space front and behind the installation site Model A B C 30 4140S 30 4140A 216 1 2 130 7 8 253 30 4140SE 30 4140AE 245 130 7 8 277 7 8...

Страница 11: ...9 D Install Cross Beams See Fig 15 Fig 16 Fig 16 2 Hole towards inside 1 3 3 Fig 15...

Страница 12: ...he pulley safety cover and unscrew the four upper nuts of the Safety Ladders and then adjust the four lower nuts to be at the same position Withdraw the Slack cable safety lock of the Cross beam to in...

Страница 13: ...the hole of the top plate then tighten the two nuts 7 This height should be the same for four safety ladders 6 Fig 21 Lifting Both Cross Beams to the same height it is recommended to about 1 meter he...

Страница 14: ...into the cross beam See Fig 22 Install the power side platform and screw up the bolts See Fig 23 8 15 16 17 Pulley installation Fig 22 Offset the cross beam lean outward when putting the power side p...

Страница 15: ...level bar adjusting with the shims if the columns are not vertical and then tighten the anchor bolts See Fig 24 Note The tightening torque for the anchor bolt is 150N m 8 18 Install the slider block 3...

Страница 16: ...latform to the columns according to the number of the cables No Cable 1 2 3 4 Length 30 4140A inc connecting fitting 162 3 4 438 1 2 230 1 2 371 Length 30 4140AE inc connecting fitting 191 3 8 495 5 8...

Страница 17: ...to top plate of columns and be screwed with cable nuts See Fig 26 Cable pass through between the big pulley and tension pulley 83 Cable pass through top plate and be screwed with cable nuts Fig 26 Ins...

Страница 18: ...16 3 Illustration for platform cables See Fig 27 Limit slider Fig 27 Hex Bolt M10 150 cable cable 19 cable cable cable cable cable cable cable cable cable cable cable cable Limit block...

Страница 19: ...of Manual Control Valve 1 26 10420161 Self locking nut 2 27 10420162 Manual Control Air Valve 1 28 10420163 Straight Fitting for Air Line 1 29 10420148 Washer 4 30 10420164 Cup Head Bolt 2 31 071102...

Страница 20: ...ylinder inlet port must swing upward to avoid the oil hose and oil return pipe scratched by cable Oil hose and air line pass through the retainer 76 70 69 Protective ring cylinder fitting swing upward...

Страница 21: ...connect the air line with T fitting See Fig 31 3 Connecting the solenoid valve using 6 4 black air line the actual length of air line can be cut by user See Fig 32 Rear Cross Beam Front Cross Beam Pow...

Страница 22: ...of Oil water separator to 0 8MPa See Fig 34 Fig 34 Clockwise to increase the air pressure Counter clockwise to reduce the air pressure Adjusting the air pressure to 0 8MPa Connecting air inlet Connec...

Страница 23: ...hase motor See Fig 35 1 Connecting the two power supply lines fire wire L and zero wire N to terminals of AC contactor marked L1 L2 respectively 2 Connecting the two motor wires to terminals of AC con...

Страница 24: ...22 P Install Drive in ramp Tire stop plate Platform locking plates Steel ball set See Fig 37 Install Drive in ramp Install Tire stop plate 44 Fig 37 41 42 35 38 37 36...

Страница 25: ...23 IV EXPLODED VIEW Model 30 4140S 30 4140SE 1 2 3 8 18 44 203 32 12 54 55 56 57 45 Fig 38 4...

Страница 26: ...24 74 79 78 1 2 3 8 18 44 203 49 50 51 32 12 54 55 56 57 45 52 Model 30 4140A 30 4140AE Fig 39 4 80 When installing the turntable both sides are required a 35mm high turntable block...

Страница 27: ...Washer 8 8 8 8 17 10209128 Washer 8 8 8 8 18 11460055 Offside Platform 1 0 0 0 11460026 0 1 0 0 11460026 0 0 1 0 11460055 0 0 0 1 19 10476015 Hex Bolt 4 4 4 4 20 10420145 Oil water Separator 1 1 1 1...

Страница 28: ...622 Cable connecting plate 1 1 1 1 57 10420014 Hex Nut 1 1 1 1 58 10420016B Protective hose 1 1 1 1 59 10420158 Turn plate 0 2 0 2 60 10460066 No Cable 1 1 0 0 10460087 0 0 1 1 61 10460069 No Cable 1...

Страница 29: ...lley 8 8 8 8 83 10476014 Hex nut 8 8 8 8 4 1 CROSS BEAM EXPLODED VIEW 10460063 Parts list For Cross Beam Item Part Description Qty Note 3 1 11460064 Front Cross Beam 2 3 2 10460043 Pulley Safety Cover...

Страница 30: ...4 3 22 10420035 Tension Pulley 4 3 23 11420174 Spacer 4 3 24 11476026 Pulley Pin 4 3 25 11460076 Pulley shaft sleeve 4 4 2 CYLINDERS EXPLODED VIEW 10460030 Parts list For Cylinder Item Part Descriptio...

Страница 31: ...29 4 3 POWER UNIT EXPLODED VIEW 071102 Fig 42 220V 60Hz Single Phase...

Страница 32: ...15 81400365 O ring 1 16 10209152 Ties 1 17 85090167 Magnet 1 18 81400290 Filter 1 19 81400413 Steel Motor 1 20 10420070 Push button 1 21 41030055 AC connector 1 22 81400287 Motor terminal box cover 1...

Страница 33: ...31 Illustration of hydraulic valve for power unit Fig 43 Check valve Oil outlet Oil return port Release valve Handle for relief valve Relief valve Throttle valve...

Страница 34: ...for several times meanwhile do the synchronous adjustment till the four Safety Devices can lock and release at the same time 5 Adjust the clearance between the post and the plastic slider of Cross be...

Страница 35: ...d press the handle of release valve by the other hand then the lift starts being lowered automatically 3 Drive away the vehicle when the lift is lowered to the lowest position 4 Turn off the power VII...

Страница 36: ...on 2 Release valve in damage 3 Gear pump in damage 4 Relief valve or check valve in damage 5 Low oil level 1 Reverse two power wire 2 Repair or replace 3 Repair or replace 4 Repair or replace 5 Fill t...

Страница 37: ...The Cartek Group 6950 East N Avenue Kalamazoo MI USA 49048 ph 866 550 1134 email customerservice cartek com www bear cartek com...

Отзывы: