25
6-847718-00 Rev. B00
Pipeline Connection
Sensor Module
1. Braze copper extension tubes from
sensor rough-in to appropriate
pressure/vacuum piping system drops
(Figure 19). Braze connections per
procedures required by NFPA 99 or
CAN/CSA-Z305.1. Use appropriate
measures to prevent overheating and
damage to internal components of
sensor rough-in assemblies.
2. Perform standing pressure tests and
cross connection tests as required by
NFPA and CSA.
Inst
allation
Procedures
Rough-In
Figure 19: Sensor Pipeline Connection
Connection
should be made
on top of pipe
Horizont
al run
of pipeline
Horizont
al run
of pipeline
Connection
should be made
on top of pipe
REMOTE SENSOR
LOCAL SENSOR
Содержание TotalAlert 2
Страница 1: ...Installation Operation and Maintenance Instructions 6 847718 00 Rev B00...
Страница 2: ......
Страница 22: ...20 6 847718 00 Rev B00...
Страница 97: ...95 6 847718 00 Rev B00 Figure 86 Clear Network Accepted Operation...
Страница 99: ...97 6 847718 00 Rev B00 Operation Figure 89 Event Log Cleared...
Страница 101: ...99 6 847718 00 Rev B00 Operation Figure 91 Transfer Setup Figure 92 Transfer Setup Complete...
Страница 129: ...127 6 847718 00 Rev B00 Troubleshooting Guide Troubleshooting...
Страница 130: ...128 6 847718 00 Rev B00...
Страница 139: ...137 6 847718 00 Rev B00 Replacement Parts Notes...
Страница 143: ......
Страница 144: ...2007 BeaconMed s All rights reserved 6 847718 00 Rev B00...