![BD FACSymphony A3 Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/bd/facsymphony-a3/facsymphony-a3_user-manual_2714976068.webp)
User’s Guide
68
Running a performance check
Introduction
This topic describes how to run a performance check as part of
quality control.
Overview
The CS&T application is designed to monitor performance on a
daily basis and to optimize laser delay.
Running a performance check on a regular basis provides a
standard for monitoring changes in performance due to
degradation of laser power, aging of PMTs, and other potential
cytometer service issues. Performance results are also affected by
fluidics performance. We strongly recommend following the
fluidics maintenance procedures as described in
Considerations
Some BP filters might not be normalized to CS&T settings. In this
case, CS&T will generate Qr and Br numbers that are not
comparable from instrument to instrument. They are however, still
trackable on one cytometer. Part of the process for optimizing
cytometer settings includes verifying PMT voltages set by CS&T
for all parameters. Carefully examine any channel with a non-
CS&T normalized filter.
Before you begin
Define the performance baseline for any configuration before
running a performance check. See
.
Содержание FACSymphony A3
Страница 4: ......
Страница 8: ...User s Guide 8...
Страница 14: ...This page intentionally left blank...
Страница 46: ...This page intentionally left blank...
Страница 86: ...This page intentionally left blank...
Страница 97: ...Chapter 6 Recording and analyzing data 97 e Click OK 12 Print the analysis...
Страница 98: ...User s Guide 98 Your global worksheet analysis objects should look like the following...
Страница 120: ...User s Guide 120 14 Adjust the red laser area scaling factor until the APC A signal matches the APC H signal if needed...