background image

WZ-CrnrOverhead

Note:

Note:

Determine if cabinet to be installed is

to be right-hand or left. This instruction
covers right, though left-hand cabinet
installation is similar, it will have a different
set of overhead stanchions.

WorkZone Corner Desk must be fully

installed prior to installing the overhead unit.

1. Begin by removing grommet covers at
the rear corner, and side location where the

overhead cabinet will be installed (Figure 1).

2. At the rear corner, from underneath the

corner worksurface, install a corner
overhead mounting tube using two #12 x

1-3/4” screws (Figure 1).

3. Position the corner stanchion (left-hand)
as illustrated through the corner grommet

hole, aligning the mounting holes in the

bracket of the stanchion with the mounting
holes of the corner overhead mounting tube.

Secure bracket to tube using two #10-32 x

1/2” screws (Figure1).

4. Position the right-hand stanchion with the
bracket through the grommet hole, aligning
the mounting holes in the bracket of the

stanchion with the mounting holes in the top
of the right-hand leg. Secure bracket to leg
using two #10-32 x 1/2” screws (Figure1).

5. Carefully set the Balance Overhead

Cabinet onto the two installed stanchions.
Align the three sets of mounting holes on
each side of cabinet/stanchion and secure
using three #10 x 3/4” screws each side

(Figure 1).

6. Remove the knock-outs from the

grommet covers removed in step 1, and
snap them back into place in the grommet
holes at the stanchions (Figure 2).

WorkZone Corner Desk with Balance Overhead Cabinet

grommet

covers

grommet

knock-out

grommet

knock-out

Venus

overhead cabinet

corner

stanchion

corner overhead

mounting tube

#12 x 1 / ”

screw

3

4

right-hand

stanchion

#10-32 x ½”

screw

#10 x / ”

screw

3

4

#10-32 x 1”

screw

Figure1

Note: 

Determine if cabinet to be 

installed is to be right-hand or left. 

This instruction covers right, though 

left-hand cabinet installation is similar, 

it will have a different set of overhead 

stanchions.

Note: 

FlexStation Corner Desk must be 

fully assembled prior to installing the 

overhead unit.

1.  Begin by removing grommet covers 

at the rear corner, and side location 

where the overhead cabinet will be 

installed (Figure 1).

2.  At the rear corner, from underneath 

the corner worksurface, install a 

corner overhead mounting tube 

using two #12 x 1

3

/

4

” screws 

(Figure 1).

3.  Position the corner stanchion (left-

hand) as illustrated through the 

corner grommet hole, aligning the 

mounting holes in the bracket of the 

stanchion with the mounting holes 

of the corner overhead mounting 

tube. Secure bracket to tube using 

two #10-32 x 

1

/

2

” screws (Figure 1).

4.  Position the right-hand stanchion 

with the bracket through the 

grommet hole, aligning the 

mounting holes in the bracket of 

the stanchion with the mounting 

holes in the top of the right-hand 

leg. Secure bracket to leg using two 

#10-32 x 

1

/

2

” screws (Figure 1).

5.  Carefully set the Venus Overhead 

Cabinet onto the two installed 

stanchions. Align the three sets of 

mounting holes on each side of 

cabinet/stanchion and secure using 

three #10 x 

3

/

4

” screws each side 

(Figure 1).

6.  Remove the knock-outs from 

the grommet covers removed in 

step 1, and snap them back into 

place in the grommet holes at the 

stanchions (Figure 2).

Assembly Instructions

FlexStation Corner Desk Overhead Cabinet

Venus Overhead

  OE-60931/PDF0314

Assemble units as described herein only. To do otherwise 
may result in instability. All screws, nuts and bolts must be  
tightened securely and must be checked periodically after  
assembly. Failure to assemble properly, or to secure parts 
may result in assembly failure and personal injury.

Отзывы: