background image

450

Rev. C

position detector system, 34,  47

See also

 detectors.

potassium, unexpected results, 166
power entry module with switch,

illustration, 289
part number, 384
replacing, 340

power loss, recovering from, 256
power module frame, illustration, 289
power module, part number, 384
power supply assembly (405), 

illustration, 288

power supply assembly,

illustrations, 287 – 292

cooling fan, 290
hard drive, 292
patch cord with ferrite filter, 291
power entry with switch, 289
power module frame, 289
power supply assembly 

(405), 288

power supply assembly, 287
power supply, 291
rear interconnect board, 290

parts list, 293

power supply assembly, 

illustration, 287

power supply module,

part number, 384
replacing, 337

preamp cable cover, illustration, 285
preamp module cable, drawing, 135
printed reports,

sample measurement, 

example, 232

sample printer, example, 234
sample sensor, example, 233
sample temperature, example, 233
temperature definitions, 235

printer,

test function, 230
testing the, 233
troubleshooting, 173

printer, mechanical description, 54
printing diagnostic reports, 231
protecting yourself,

from biohazards, 387
from electrical shock hazards, 389

pump housing clips (pack of 4), part 

number, 384

pump housing, illustration, 282
pump housings (pack of 2), part 

number, 384

pump motors, replacing, 349
pump roller cages, replacing, 345
pumps,

flow test, 242
mechanical description, 52
testing, 238

Q

QC Lot Not Defined message, 219
QC Material Expired message, 219
QC setup, selecting, 416
Question Result message, 219

R

Rapidlink system,

connecting to, 401
remote access setup to, 433

Содержание RapidPoint 400 Series

Страница 1: ...Service Manual 105953 Rev C 2003 02...

Страница 2: ...of Hyundai Panellink is a trademark of Silicon Image Inc Sharp is a trademark of Sharp Corporation Sound Blaser is a trademark of Creative Technology Ltd Velcro is a trademark of Velcro Industries B V...

Страница 3: ...Mechanical Descriptions 23 Overview 25 The Base Model 26 Measurement Cartridge 31 Measurement Cartridge Fluidics 33 Sample Entry 33 Sliding Valve 33 Tubing 35 Reagent System 35 Sensor Module 36 KCl Re...

Страница 4: ...53 Touch Screen 53 Printer 54 Display Board 54 Display Support 54 CO oximeter Components 55 CO ox Measurement Components 56 Illumination Housing Assembly 57 Neon Board Assembly 57 Fiber Bundle Assemb...

Страница 5: ...igital Signals 77 Digital Input Signals 77 Digital Output Signals 78 Analog Signals 79 Analog and Other Input Signals 79 Analog and Other Output Signals 80 Circuit Description 80 Microcontroller and P...

Страница 6: ...ata Bus I O Latch CPLD and Communications Circuitry 88 Control Micro stepper Processor and Sample and Wash Pump Driver Circuitry 88 Control Heater DAC Driver Circuitry and Valve Driver Circuitry 89 Po...

Страница 7: ...PC Board 101 Digital Signals 102 Digital Input Signals 102 Digital Output Signals 102 Analog Signals 103 Analog and Other Input Signals 103 Analog and Other Output Signals 104 Circuit Descriptions 10...

Страница 8: ...Signals 111 System Diagrams and Cable Drawings 113 System Diagrams 115 Cable Drawings 130 Calibrations 141 Calibrating the System 143 Calibrating the Touch Screen 145 Emergency Calibration of the Touc...

Страница 9: ...ed 177 AQC Cartridge Not Valid 177 AQC Connector is Open 177 AQC Pending 177 Additional Cal Required 177 Additional Wash Required 178 Analysis is turned off by a remote computer 178 Bubbles in the Sam...

Страница 10: ...5 Electronics Error 1 13 196 D35 Electronics Error 14 196 D38 Temp Error 1 198 D38 Temp Error 2 13 198 D39 Obstruction 200 D40 Wash Not Detected 201 D41 No AQC Material Detected 202 D60 Communications...

Страница 11: ...he error 220 System Error Turn the power switch off Wait 10 seconds then turn the switch on 221 System requires operator attention 221 Temp Not Ready 222 Temp Out of Range 223 Temp Warning 225 The lan...

Страница 12: ...ons for a Printed Temperature Report 235 Testing the Measurement Valve in Diagnostics 235 Testing the AutomaticQC Cartridge Valve in Diagnostics 237 Testing the Pumps 238 Using the Measurement Cartrid...

Страница 13: ...ce Assembly Illustrations 281 Cartridge Interface Assembly Parts List 286 Power Module Assembly Illustrations 287 Power Module Assembly Parts List 293 CO ox Module Components Illustrations 294 Replaci...

Страница 14: ...iskette Drive Assembly 323 Replacing the Display Printer Assembly 326 Replacing the Paper Cover 330 Replacing the Door Lock Module 333 Replacing the Hard Drive 334 Replacing the Power Supply Module 33...

Страница 15: ...e Illumination Housing Assembly 360 Replacing the Polychromator Module 362 Replacing the Sample Chamber Interface Assembly 365 Replacing the Main Board 367 Replacing the UIP Board 370 Replacing the Ma...

Страница 16: ...ng the Rapidpoint 400 Series System 391 Installing the System 391 Installing the AutomaticQC Cartridge 394 Relocating the System 396 Shipping or Storing the System 397 Connecting to a Computer System...

Страница 17: ...plete in the Rapidlink Database 416 Setting Up RapidQC Hct in the Rapidlink System 417 Finishing the Rapidpoint Setup 417 Rapidpoint 400 Series Cartridge Usage 419 Overview 419 Verifying Modes of Oper...

Страница 18: ...ible Calibrations 429 Cartridge Initialization Init 430 Initialization Calibration Timeline 431 Remote Access Setup to the Rapidlink System 433 Installing and Configuring Remote Access Setup RAS 434 C...

Страница 19: ...ndicatesabuttononthescreen Forexample iftheword setup appears as Setup it refers to the button labeled Setup Buttons that youusefrequently arerepresentedon thescreenwith a symbol instead of text In th...

Страница 20: ...symbol reminds you to push the measurement cartridge firmly to lock it in place This symbol identifies the area on the wash waste cartridge where you push to install the cartridge correctly This symbo...

Страница 21: ...system is approved by UL as meeting U S requirements for safety This symbol indicates that the system meets the requirements of the European Union This symbol indicates that the system is approved by...

Страница 22: ...he result is below the reporting range the system has an atypical response when measuring this parameter The system does not report results for other parametersthatusetheaffectedparameter Forexample i...

Страница 23: ...33 Sample Entry 33 Sliding Valve 33 Tubing 35 Reagent System 35 Sensor Module 36 KCl Reservoir 40 Wash Waste Cartridge 41 Cartridge Interface Module 43 AutomaticQC Cartridge 46 AutomaticQC Cartridge F...

Страница 24: ...Display Board 54 Display Support 54 CO oximeter Components 55 CO ox Measurement Components 56 Illumination Housing Assembly 57 Neon Board Assembly 57 Fiber Bundle Assembly 58 Sample Chamber Interface...

Страница 25: ...onents of the Rapidpoint 400 seriessystems Eachcomponentcontainsindividualmodulesthatperform a series of related functions The Rapidpoint 400 series systems consists of the following components Measur...

Страница 26: ...el Rapidpoint 400 Series System door open 1 Measurement cartridge 7 Paper advance knob 2 Door 8 Ampule breaker 3 Door latch 9 Air filter carrier 4 Cartridge handle 10 Sample port 5 Display 11 Support...

Страница 27: ...mbly Delivers and collects light from the CO ox sample chamber 2 Drive Wheel Opens and closes the CO ox sample chamber 3 Pumps Move samples and reagents through the measurement and wash waste cartridg...

Страница 28: ...28 Rev C Rapidpoint 400 Series System with AutomaticQC Cartridge Installed Rapidpoint 400 Series System with Bar Code Scanner Holder 1 AutomaticQC cartridge 2 Cartridge connector...

Страница 29: ...Rev C Mechanical Descriptions 29 Rapidpoint 400 Series System left side 1 Diskette drive...

Страница 30: ...mentsystem 3 Screen Latch Allows you to adjust the viewing angle of the screen 4 Handle Helps you to move the system 5 Co ox Lamp Appears only in Rapidpoint 405 systems 6 Power Switch 7 Fuse Compartme...

Страница 31: ...ristaltic pumps the sensor module with the electronic components the wash waste cartridge the thermal control The external area of the cartridge consists of the platen area which contains the pump tub...

Страница 32: ...tridge can be installed and still have 28 days of use before expiration If a cartridge is installed after the Install by date it is stable for the number of days remaining before expiration that is 28...

Страница 33: ...nges capillaries or aspiration adapters during sample aspiration connects to the wash and waste ports for automatic cleaning The sample entry components consist of a luer and capillary seal The capill...

Страница 34: ...the probe tip into the syringe creating the fluid path for sample aspiration Vent AQC controls the aspiration of an external QC sample using the front hole of the probe Zero Reagent Load aspirates th...

Страница 35: ...s Each bag contains a fitting When the measurement cartridge is installed and locked into place pierce pins which are part of the interface assembly puncture each bag creating a fluid path The pierce...

Страница 36: ...bing and to the preheater The sample then passes over the sensors for analysis The sensor module provides measurements for pH pO2 pCO2 sodium potassium ionized calcium chloride glucose Hct total hemog...

Страница 37: ...he blood chloride Cl chloride ion concentration metabolites glucose Glu glucose concentration oxygenation hematocrit Hct thevolumeoccupiedbyredbloodcells in a given volume of blood value is determined...

Страница 38: ...contained in the sample pO2 FIO2 theratioofarterialpO2 tothefractionof inspired oxygen calcium adjusted for pH 7 4 Ca 7 4 the ionized calcium concentration of blood normalized to pH 7 4 anion gap AnG...

Страница 39: ...ectors to monitor and control the movement and the positioning of fluids during the system sequences CO oximetry Parameters total hemoglobin tHb the total of all measured hemoglobin fractions oxyhemog...

Страница 40: ...oblems The IDEE Rom Identifies the following analyzer software version date installed on the analyzer date removed fro analyzer if removed normally analyzer serial number KCl Reservoir The KCl reservo...

Страница 41: ...open or closed The cartridge contains the wash fluid which cleans the sample path after analysis and calibration The cartridge also contains the waste bag which stores liquid waste The wash waste car...

Страница 42: ...e probe seals inside the fitting in the bag Two bag clamps one at the top of each bag hold the bags in position Two hangers one at the top of the cartridge and one at the bottom of the cartridge hold...

Страница 43: ...f the system and holds all devicesandpartsnecessarytointerfacethesystemwiththemeasurement cartridge The location pins position the measurement cartridge on the cartridge interfaceframe Threebagpiercep...

Страница 44: ...interface module and protects and guides the connector block The cam shaft used in conjunction with the cartridge handle raises and lowers the connector block The connector block provides the electric...

Страница 45: ...oard takes the signals from the contact board and simultaneously transmits them into one signal that travels back to the system A programmable gain amplifier on the multiplexer board provides the gain...

Страница 46: ...m where a support bracket secures it in place The ampule breaker and an access panel must be removed before the cartridge is installed Four standoffsattach the cartridge to the system where the ampule...

Страница 47: ...Thevalvehasfivepositions each of whichenablesoneofthe five QC reagents to be pumped through the stainless steel probe in the center of the valve The probe remains stationary while the valve travels v...

Страница 48: ...artridge AutomaticQC Cartridge Indicating Lever Closed Position 1 Bracket to secure the cartridge to the side of the system 2 Standoffs 4 3 EEPROM 4 Cartridge connector 5 Cartridge Lever 1 Cartridge c...

Страница 49: ...stem the cartridge connector located on the front of AutomaticQC cartridge connects the AutomaticQC cartridge to the measurement cartridge Fluidic connectivity between the two cartridges is provided b...

Страница 50: ...s the stepper motor to move the sliding metal latch plate and release the standoffs If power is lost the AutomaticQC cartridge can also be disengaged from the system by moving a release tab located be...

Страница 51: ...allation of the cartridge the connector is moved horizontally and connects with the measurement cartridge It provides the sample path from the AutomaticQC cartridge to the measurement cartridge The ca...

Страница 52: ...tor shaft The pump that services the measurement cartridge generates flow by compressing the tubing against the fixed platen of the cartridge As the individual rollers rotate through the platen area a...

Страница 53: ...lay support In addition the display module contains the roll of printer paper and the paper cover Liquid Crystal Display The LCD is a 265 mm 10 4 inch diagonal display with active matrix color LCD tha...

Страница 54: ...rd The printer cable carries the signals for the data the motor control the paper empty sensor and the printhead up sensor The display board communicates with the main board Display Board The display...

Страница 55: ...Hb FMetHb FCOH in whole blood samples Measurement occurs as the sample flows through the sample chamber Light is transmitted through a fiber bundle to the optics head As the sample flows through the s...

Страница 56: ...mponents consist of the following illumination housing assembly neon board assembly fiber bundle assembly sample chamber interface sample chamber polychromator module photo feedback sensor The CO ox c...

Страница 57: ...housing assembly to a photo feedback sensor located on the main PB board This sensor continuously monitors lamp output and generates a signal that regulates power to the lamp Illumination Housing Asse...

Страница 58: ...is focused onto the sample chamber transmits a small portion light from the illumination module to the photo feedback sensor which controls the halogen lamp output transmits light from the neon refer...

Страница 59: ...nnected from the optical head to the polychromator relays the light for measurement The spring link holds and locates the optical head The detector module uses a thermistor to ensure that the CO ox sa...

Страница 60: ...surementpositionwhenthemotormoves the shunt into the closed position When the shunt returns to the open position the measurement cartridge reagent system cleans the sample chamber A heater chip ensure...

Страница 61: ...r The first mirror collimates light from the slit so that nearly parallel light falls on the diffraction grating The diffraction grating disperses the light coming from the collimating mirror into its...

Страница 62: ...62 Rev C...

Страница 63: ...ls 72 Circuit Description 74 Amperometric Circuits 74 Potentiometric Circuits 75 Hematocrit Fluid Detector Circuits 75 Display PC Board 77 Digital Signals 77 Digital Input Signals 77 Digital Output Si...

Страница 64: ...ory Communications Circuitry 86 UIP Main Interconnect Board ISA Interface Circuitry 87 UIP Display Module COM1 COM2 LPT1 and Utility Circuitry 87 UIP COM3 Circuitry 87 UIP ISA Address Bus Decoder Data...

Страница 65: ...7 Digital Output Signals 97 Multiplexer Board Interface 98 Digital Input Signals 98 Digital Output Signals 98 Analog and Other Output Signals 99 Main Interconnect PC Board 100 ISA Connectors 100 Multi...

Страница 66: ...rd Controller 108 Battery 108 Miscellaneous Function Connector 108 Peripheral Interfaces 109 Serial Ports 109 Parallel Port 109 Floppy Disk Controller 109 Co oximeter OMZ Heater PC Board 110 Analog Si...

Страница 67: ...s for each printed circuit board are included in Replacing Parts The electronic system directs the operation of all Rapidpoint 400 series systems components including the fluidic system the measuremen...

Страница 68: ...Rev C Electronic System The Rapidpoint 400 series systems electronic system consists of the following PC boards Contact Display Dualopto Main Main Interconnect Multiplexer UIP User Interface Processo...

Страница 69: ...7 C connections to an EEPROM device located within the sensor module for storing calibration and configuration information specific to the measurement cartridge Digital Signals Digital Input Signals D...

Страница 70: ...turn for the glucose circuit 5_VDC_LAC Isolated positive power supply for the lactate circuit Voltage is 3 5 0 5 V at 250 A For future use 5_VDC_LAC Isolated negative power supply for the lactate circ...

Страница 71: ...sensor CA_VO Voltage output signal for the Ca sensor MG_CL_VO Voltage output of the Cl sensor NA_VO Voltage output signal of the Na sensor BUN_VO For future use HCO3_VO Voltage output signal of the H...

Страница 72: ...terminal of the preheater thermistor THM_PRE_LO The other terminal of the preheater thermistor THM_SMP_HI One terminal of the sample thermistor THM_SMP_LO The other terminal of the sample thermistor...

Страница 73: ...pass through signal connected to the other end of the sample thermistor PO2_RF The voltage sensed internal to the pO2 sensor PO2_CN The voltage control electrode for the pO2 sensor GLU_RF The voltage...

Страница 74: ...le limits the diffusion rate so thatthe outputcurrentis proportional to the glucoseconcentrationin the sample Another current output GLU_WA is from the inactive electrode of the sensor This current co...

Страница 75: ...or Circuits The Contact board has two hematocrit fluid detector circuits These circuits are conductometric that is they measure the electrical conductance resistance of the fluid appearing between the...

Страница 76: ...tial amplifier with a gain of 51 The HCT_SIG signal is the peak to peak voltage at HCT_HS minus the peak to peak voltage at HCT_LS multiplied by a gain of 51 Hematocrit circuit 2 is identical to the c...

Страница 77: ...neration of the voltage necessary to turn the LCD backlight on and off Digital Signals Digital Input Signals Input Signal Description LCD_ENAB Enables operation of the LCD LCD_DIM Turns inverter provi...

Страница 78: ...Y Handshake signal This signal indicates that the printer is currently busy and cannot accept any new data at this time LPT1ACK Handshake signal This signal asserts when LPT1BUSY is becoming de assert...

Страница 79: ...f paper It is the open collector output of an optocoupler and requires a 100K ohms resistor pullup to the VCC line to operate A paper out condition is indicated by a voltage of greater than 2 5 V on t...

Страница 80: ...motor This signal conforms to the requirements outlined in the Digital Inputs Signals section above VCC Electronics 5 V power supply This signal conforms to the requirements outlined in the Digital I...

Страница 81: ...C This additional memory is intended for the downloadable font feature U14 a 128K x 8 flash EEPROM device is for program memory U10 is a power logic octal D type latch Touch Screen Switches Transisto...

Страница 82: ...main board through a 4 pin male IDC connector J1 The two LEDs inside the interrupters U1 and U2 connect in series and can be checked at test points TP3 and TP4 for a voltage of approximately 2 5V The...

Страница 83: ...bus for all other devices on the Main board The microprocessor uses a frequencysynthesizer Y1 for generating both its internal and external system clock U55 is a power supervisor and watchdog The out...

Страница 84: ...e complex programmable logic device CPLD U37 The majority of this IC takes the address bus signals A1 to A15 chip select signals CS9 to CS10 and other 68332 control signals such as R W and forms vario...

Страница 85: ...ontains the interface to the Multiplexer board located in the measurement block module This module receives parallel data bits from the U38 latches U38 returns the properly conditioned sensor analog s...

Страница 86: ...detector signals are monitored The fluid detector signals are sent to a pair of comparators located in U17 The non inverting input pins of thesecomparators connect to a dual 12 bit DAC U24 The DAC all...

Страница 87: ...the LIS communications port on the Rear Interconnect board assembly Connector J19 also contains the LPT1 parallel port signals These signals originate on the UIP Processor board and exit the Main boar...

Страница 88: ...TheLAB BofICU20takesthedatabussignals USD0toUSD3 inandout as well as inputs for the FIFO status flags and door and waste switch signals The LAB C decodes chip selects for the Controller IC and serial...

Страница 89: ...als from RTP CPLD U38 and forms the proper sequencing signals to drive the luer position motor located in the equipment wall module These driver signals exit the Main board through J3 Power System Sta...

Страница 90: ...also splits to drive heaters through power transistor Power Supply Voltage Description 12_VDC supply Overvoltage protected by transient protector U42 and is current limited from shorts by R174 12_VDC...

Страница 91: ...Overview 91 Signal HEAT24V_EN controls power to the heaters and is enabled by a latched bit on IC U38 on the RTP data bus LEDs CR10 to CR13 indicate which of the four power supply voltages VCC 12 V 1...

Страница 92: ...s I OCS16 I O 16 bit chip select IRQ3 IRQ7 IRQ9 IRQ12 IRQ 14 IRQ15 Interrupt request lines These lines signal the microprocessor when an I O device requires attention An interrupt request is generated...

Страница 93: ...memory decode is within the low 1 MB of the memory space SMEMW originates from MEMW and the decode of the low 1 MB memory This signal is active low T C Terminal count This signal provides a high pulse...

Страница 94: ...OM1RX Transmit signal for the touch screen serial port to the UIP Processor board from the Main board COM1CTS Clear to send signal for the touch screen serial port from the UIP Processor board to the...

Страница 95: ...R Printer error Possible error sources are print head temperature out of range print head voltage out of range print head in the up position or printer out of paper LPT1PE Printer is out of paper LPT1...

Страница 96: ...gnals LCD_YD VSYNC LCD frame start signal LCD_ HSYNC LCD line start signal LCD_XCK CK LCD clock signal ENAVEE LCD negative supply control signal ENAVDD LCD positive supply control signal Input Signal...

Страница 97: ...put Signal Description LCD_ENAB Enables operation of the LCD LCD_DIM Turns the LCD backlight inverter on and off LCD_DU0 7 Upper byte of LCD data signals LCD_DL0 7 Lower byte of LCD data signals LCD_Y...

Страница 98: ...side of the bridge Typical voltage is 595 9 mV THM_PRE_LO High terminal of the preheater thermistor HCT1_SIG Outputof thefirst hematocritcircuit This signaloriginates on the Contact board and passes t...

Страница 99: ...itry DAC_LO Signal return line for the DAC signal VREF 5 V measurement system voltage reference from the DAS circuitry 12_VDC 12 VDC from the filtered supply 12_VDC 12 VDC from the filtered supply 12_...

Страница 100: ...board to the Main board ISA Connectors All the ISA bus signals are sent from the UIP Processor board through a 98 pin female edge connector J1 This connector routes all signals to the Main board thro...

Страница 101: ...Multiplexer board provides the following four galvanically isolated dual channel amperometric circuits with precision bias voltage a precision reference bridge and amplifier for the sample temperatur...

Страница 102: ...ge transfer process in the hematocrit circuits DRIVE Signal provides the AC excitation voltage for the hematocrit sensors Output Signal Description PREMUX0 7 8 bit bus driven by the DAS circuitry and...

Страница 103: ...M 5 VDC ground return from the DAS circuitry See the Digital Signals section for details HCT1_SIG Output of the first hematocrit circuit This signal originates on the Contact board and passes through...

Страница 104: ...the oxygen circuit 5_VDC_PO2 Isolated negative power supply for the oxygen circuit 5_RTN_PO2 Isolated power supply return for the oxygen circuit 5_VDC_GLU Isolated positive power supply for the gluco...

Страница 105: ...for the EEPROM PREMUX_SIG_HI Multiplexed sensor signal offset adjusted and properly amplified output of the Multiplexer board PREMUX_SIG_LO Signal low sense return for PREMUX_SIG THM_BLK_HI Signal con...

Страница 106: ...tanceis convertedinto avoltagemeasured by the DAS circuitry on the Main board Additionally it is necessary to monitor the temperature of the connector block and the sample preheater This monitoring is...

Страница 107: ...or IDE controller with primary channel routed to 2 5 inch hard drive interface Primary channel supports Master Slave IDE devices Interrupt controller Timer counters DMA controller Real time clock RTC...

Страница 108: ...only input power requirement onboard 1 8 to 2 5 volt power supply for the CPU core onboard 2 5 volt power supply for the CPU I O onboard 3 3 volt power supply for the chip set memory and PCI devices M...

Страница 109: ...COM2 is through a standard header connector on the board that is shared with the parallel port Both COM ports are 16C550 compatible and contain FIFOs Parallel Port The parallel port is in a user defi...

Страница 110: ...nctions interfaces the slide cell position detectors located on the OMZ Interface board in the optics head with the Main board amplifes and powers the Co ox heater OMZ Heater PC Board Block Diagram Mu...

Страница 111: ...ound signal to a LED from the MUX board 5 VOLTS Power supply input signal from the MUX board GROUND Power supply return signal from the MUX board assembly HEATER_IN Heater control signal from the MUX...

Страница 112: ...112 Rev C...

Страница 113: ...09 130 D C Power Harness Assembly 113836 131 Diskette Drive Cable Assembly 570255 132 Diskette Power Harness 570254 132 Hard Drive Cable Assembly 570257 133 Inboard 1 Harness 113770 133 Inboard 2 Harn...

Страница 114: ...114 Rev C...

Страница 115: ...map illustrates system navigation The fluidic diagrams illustrate the various valve positions with the associated fluid path The system block text diagram illustrates the major Rapidpoint 400 series...

Страница 116: ...116 Rev C Rapidpoint 400 Series Systems Menu Map...

Страница 117: ...Rev C System Diagrams and Cable Drawings 117 Fluidic Diagrams...

Страница 118: ...118 Rev C...

Страница 119: ...Rev C System Diagrams and Cable Drawings 119...

Страница 120: ...120 Rev C...

Страница 121: ...Rev C System Diagrams and Cable Drawings 121...

Страница 122: ...122 Rev C...

Страница 123: ...Rev C System Diagrams and Cable Drawings 123...

Страница 124: ...124 Rev C...

Страница 125: ...Rev C System Diagrams and Cable Drawings 125...

Страница 126: ...126 Rev C...

Страница 127: ...Rev C System Diagrams and Cable Drawings 127...

Страница 128: ...128 Rev C Rapidpoint 400 Series Systems Electronic Block Text Diagram...

Страница 129: ...Rev C System Diagrams and Cable Drawings 129 Rapidpoint 400 Series Systems Cable Interconnect Diagram...

Страница 130: ...130 Rev C Cable Drawings A C Power Harness Assembly 570250 Cable Harness Outboard Assembly 113509...

Страница 131: ...Rev C System Diagrams and Cable Drawings 131 D C Power Harness Assembly 113836...

Страница 132: ...132 Rev C Diskette Drive Cable Assembly 570255 Diskette Power Harness 570254...

Страница 133: ...Rev C System Diagrams and Cable Drawings 133 Hard Drive Cable Assembly 570257 Inboard 1 Harness 113770...

Страница 134: ...134 Rev C Inboard 2 Harness 113523 LCD Backlight Cable Assembly 108771...

Страница 135: ...Rev C System Diagrams and Cable Drawings 135 Preamp Module Cable Assembly 570269...

Страница 136: ...136 Rev C UIP Display Cable Assembly 570263 UIP LPT1 COM2 Cable Assembly 570267...

Страница 137: ...Rev C System Diagrams and Cable Drawings 137 UIP Utility Cable Assembly 570268 UIP COM1 Inboard Cable Assembly 570272...

Страница 138: ...138 Rev C Flex Circuit Display 570516 100 Pin Cable Assembly 111326 Patch Cord Cable 122254...

Страница 139: ...Rev C System Diagrams and Cable Drawings 139 Fiber Bundle Assembly 1315271...

Страница 140: ...140 Rev C...

Страница 141: ...Rev C Calibrations 141 Calibrations Calibrating the System 143 Calibrating the Touch Screen 145 Emergency Calibration of the Touch Screen 147...

Страница 142: ...142 Rev C...

Страница 143: ...he day 2 At the Analysis screen touch the Status button 3 Touch Calibrate NOTE You cannot perform calibrations for at least 3 hours after installing a new measurement cartridge During this period the...

Страница 144: ...e 4 1 Calibration Message If a parameter fails the calibration the calibration repeats When the calibration is finished the Analysis screen appears 1 Shows time remaining until the calibration finishe...

Страница 145: ...button 3 Touch Setup 4 Touch Secured Options 5 Touch Screen Calibration The Calibration screen appears with the Target button in the upper left corner of the screen If you do not want to calibrate the...

Страница 146: ...6 Rev C 7 Touch the button again when it appears on the screen The system returns to the Setup menu when the touch screen is calibrated 8 Touch the Continue button twice to return to the Analysis scre...

Страница 147: ...screen with the Bayer logo appears touch the screen within 4 seconds Wait for the system to complete startup and the Calibration screen appears 3 Touch the button that appears on the screen The butto...

Страница 148: ...148 Rev C...

Страница 149: ...Technique 172 Bar Code Quality 172 Resetting the Bar Code Scanner 172 Printer 173 Touch Screen 174 Communication 175 Viewing the Events Log 176 System Messages 177 AQC Cartridge Expired 177 AQC Cartr...

Страница 150: ...186 D4 Offset Error Glu pO2 186 D21 Processing Error 188 D23 Reagent Error 1 8 or 10 13 189 D23 Reagent Error 9 190 D24 AQC Material Error 192 D33 Valve Error 1 193 D33 Valve Error 2 194 D35 Electroni...

Страница 151: ...ridge 217 No M Cartridge 217 No Paper in Printer 218 No W Cartridge 219 Out of Reporting Range 219 QC Lot Not Defined 219 QC Material Expired 219 Question Result 219 Required QC Due 220 Sensors Unavai...

Страница 152: ...System Error Call your service representative for assistance 228 Unsuccessful Connection Review the setup values Ensure that the cables are connected and that the network is operating 229 W Cartridge...

Страница 153: ...53 Testing the IDEE ROM and Cartridge Connector Switch 251 Lamp Calibration Test 252 Wavelength Calibration Test 253 Lamp On Off Test 254 Sample Chamber Test 255 Shutting Down the System 256 Recoverin...

Страница 154: ...154 Rev C...

Страница 155: ...nual The QC button on the Analysis screen is not available Probable Cause Corrective Action The lot is expired for the control that is currently scheduled or no lot is entered for the control 1 Define...

Страница 156: ...automatic calibration 2 If the parameter fails the 2 point calibrations the problem is with the measurement cartridge Replace the measurement cartridge Refer to Replacing the Measurement and Wash Wast...

Страница 157: ...y fail Required QC or AutomaticQC analysis more frequently Refer to Viewing and Editing Target Ranges for Quality Control in Section 6 in the Rapidpoint 400 Series Operator s Manual if you need to adj...

Страница 158: ...ause Corrective Action The parameter failed calibration 1 View the Events Log to determine the event causing the parameter to fail and follow the appropriate solutions for that event 2 Subsequent cali...

Страница 159: ...idpoint 400seriessystemhasturnedanalysis functions off for the Rapidpoint 400 series system Perform other tasks such as recalling results and accessing the Setup options if necessary Contact your syst...

Страница 160: ...shows the number of samples or amountoftime 00 34minutesinthis example remaining until the wash waste cartridge is depleted or expired No action is necessary at this time You can monitor thenumberofsa...

Страница 161: ...amp has burned out 1 Shut down the system as described in Shutting DowntheSystem page 256 wait10 seconds and then turn the system on If thelamp stilldoesnotwork the D75 LampFailure message appears in...

Страница 162: ...Section 1 in the Rapidpoint 400 Series Operator s Manual 3 Analyzethesampleagainensuringthatthesample has no bubbles Checking for bubbles is especially important for samples introduced from capillary...

Страница 163: ...t result Analyze the sample againoranalyzea QCsample to verify the result The system did not correct the hematocrit result for sodium Na or potassium K because the sodium or potassium sensor is out of...

Страница 164: ...off at the Analysis screen Analyze the sample again ensuring that the parameteristurned on at the Analysis screen as described in Analyzing Patient Samples in Section 1 in the Rapidpoint 400 Series O...

Страница 165: ...aphics are turned on in Setup as described in Selecting Parameters and Units of Measure and Selecting Patient and Sample Demographics in Section 6 in the Rapidpoint 400 Series Operator s Manual You se...

Страница 166: ...sample was analyzed using a different sample type button than the mixed venous button or the sample was analyzed without the interference correction which caused results to be unreliable because of th...

Страница 167: ...You have installed an expired measurement cartridge a used measurement cartridge or you installed the measurement cartridge without using the prompted method 1 Touch Cancel View the events log on the...

Страница 168: ...installing a new cartridge and closing the connector a message appears indicating that the cartridge was not installed correctly The AutomaticQC cartridge was not pushed in firmly enough to lock it i...

Страница 169: ...e accession number the bar code appears in the wrong field on the screen The wrong field was selected when you scanned the bar code Touch the button for the appropriate field or touch the field and th...

Страница 170: ...abel as described in Bar Code Quality on page 172 3 Ensurethatthebarcodescanneriscorrectly connected to the Rapidpoint 400 series system 4 Ensure that the bar code scanner is turned on and that the co...

Страница 171: ...4 Ensure that the bar code scanner is turned on and that the correct symbology and format for patient bar codes are selected as described in Selecting Bar Code Options in Section 6 in the Rapidpoint...

Страница 172: ...round with black print provides the highest contrast Label quality can interfere with correct scanning Avoid using labels with a highly laminated surface or with poorly printed bar codes such as those...

Страница 173: ...Section 3 in the Rapidpoint 400 Series Operator s Manual 3 Ensure that the paper is not jammed Clear the jam if one exists 4 If you are unable to clear the paper jam call for technical assistance 5 En...

Страница 174: ...uches For example you must touch to the right or the left of an item to select it The touch screen requires calibration Refer to Calibrating the Touch Screen in Calibrations When relocating the system...

Страница 175: ...dpoint 400 series system is correctly configured to communicate with the Rapidlink system or the LIS and that the connection is turned on Refer to Connecting to a Computer System for more information...

Страница 176: ...s the list of messages about current system conditions such as a message for a sensor that is out of calibration Refer to System Messages on page 177 for more information about each message 3 Touch th...

Страница 177: ...ridge AQC Cartridge Not Valid The system detects that the AQC cartridge just installed has exceeded its Installbydate thata usedcartridgewas reinstalled or that the cartridge was installed without usi...

Страница 178: ...r the system Replace the sample port when prompted The system cannot analyze the current patient or QC sample because it detects bubbles in the sample This can occur if the sample contained bubbles wh...

Страница 179: ...form calibrations when the wash waste cartridge is expired during diagnostic tests and during the procedure for removing obstructions When this condition occurs the Wait screen appears while the syste...

Страница 180: ...nd of sample analysis This message usually appears if you analyze a sample before the CO ox sample chamber reaches its normal operating temperature The system does not report the sample results Analyz...

Страница 181: ...only after all other corrective actions have been completed If cartridge replacement does not solve the problem 1 Use the measurement cartridge simulator to perform the sensor test 2 Replace the conne...

Страница 182: ...bration limits 1 Perform a full calibration 2 If the parameter remains out of calibration replace the cartridges to make the parameter available for analysis Refer to Replacing the Measurement and Was...

Страница 183: ...nd limit checked for both calibration points Inherent noise or instability is determined during the measurement A special case exists for pCO2 which reports a D2 error when a drift error occurs for pH...

Страница 184: ...tions Perform service solutions only after all other corrective actions have been completed If cartridge replacement does not solve the problem 1 Use the measurement cartridge simulator to perform the...

Страница 185: ...tHb Thesystem turned the tHb parameter off because the CO ox module exceeded calibration limits 1 Perform a full calibration 2 If the parameter remains out of calibration replace thecartridgestomaket...

Страница 186: ...the measurement cartridge simulator to perform the sensor test 2 Replace the connector block 3 Replace the cartridge interface module D4 Offset Error Glu pO2 The system turned the parameter identifie...

Страница 187: ...is not reported with D3 for the same sensor and same calibration point D4 for pO2 occurs only during a 2 point calibration operation D4 for Glu occurs during a 2 point calibration operation and a was...

Страница 188: ...tem error occurred 1 When prompted shut down the system as described in Shutting Down the System on page 256 wait 10 seconds and then turn the system on 2 If the message appears again record the messa...

Страница 189: ...message If you need to replace only the wash waste cartridge refer to Replacing the Wash Waste Cartridge in Section 3 in the Rapidpoint 400 Series Operator s Manual If you need to replace both cartri...

Страница 190: ...ace the sample port as described in Replacing the Sample Port in Replacing Components 2 If prompted replace the cartridges as described in Replacing the Measurement and Wash Waste Cartridges in Sectio...

Страница 191: ...agent loads aspreag_seq Qualifier 4 occurs during 2 point and FULL 2 point calibration reagent loads aspreag1_seq Qualifier 5 occurs during FULL 2 point calibration reagent loads aspreag1_seq Qualifie...

Страница 192: ...ive Action D24 AQC Material Error Thesystemdetectsthattheflowofoneormorequalitycontrol materials is inadequate or incorrect The system automatically repeats the QC sample If the system cannot correct...

Страница 193: ...ective Action D33 Valve Error 1 Qualifiers 1 Measurement cartridge The system detects a problem with the valve inside the measurement cartridge 1 When prompted shut down the system as described in Shu...

Страница 194: ...assistance If the problem occurs during AutomaticQC analysis 1 Shut down the system as described in Shutting Down the System on page 256 wait 10 seconds and then turn the system on 2 If the message a...

Страница 195: ...tain position due to a drive valve failure or a latch failure When the AQC cartridge does not eject the D33 is detected after closing the cartridge connector when replacing the cartridge when the cart...

Страница 196: ...qualifier and call for technical assistance Service Solutions Perform service solutions only after all other corrective actions have been completed 1 Perform the test to measure the 5 volt supply Ref...

Страница 197: ...tion when the system fails any tests that check the DAS functionality of the Main board Qualifier 13 occurs during washes and pump MITs Qualifier 14 occurs if the door opens without the door lock bein...

Страница 198: ...er all other corrective actions have been completed 1 Check that the filter is not blocked or that nothing is blocking air to the main board 2 Check cables and connections to the fan 3 Check that the...

Страница 199: ...lacement procedure will preempt the temperature handling All D38 types except D38 1 are detected by the temperature control system software which runs once per second D38 1 is detected on startup duri...

Страница 200: ...to replace the sample port If the system is unable to clear the obstruction it prompts you to replace the cartridges 1 When prompted replace the sample port as described in Replacing the Sample Port...

Страница 201: ...ies Operator s Manual 2 If the message appears again record the message and call for technical assistance Service Solutions Performservicesolutionsonlyafterallothercorrectiveactionshave been completed...

Страница 202: ...prompts you to replace the AutomaticQC cartridge 1 When prompted replace the cartridge as indicated in the message Refer to Replacing the AutomaticQC Cartridge on page 168 2 If prompted to replace the...

Страница 203: ...in the fluidic path of the measurement or AutomaticQC cartridge A D41 is detected during the priming of an AutomaticQC cartridge D41 is cleared by a successful AutomaticQC cartridge replacement turnin...

Страница 204: ...Ensure that the cable is not damaged and that it is the correct cable for connecting the systems 3 EnsurethattheRapidlinkdatamanagementsystemortheLIS is correctly configured to communicate with the R...

Страница 205: ...ord the message and call for technical assistance Service Solutions Performservicesolutionsonlyafterallothercorrectiveactions have been completed 1 Repeat 2 point calibrations 2 Replace the measuremen...

Страница 206: ...bon cable and reattach Power up the system 4 If the error persists replace the polychromator module For Error 11 1 Repeat 2 point calibrations 2 Perform the Wavelength Calibration test without the car...

Страница 207: ...rcorrectiveactions have been completed For Error 9 1 Repeat 2 point calibrations 2 Check that the screws are tight on the polychromator to ensure it is properly grounded 3 Remove the polychromatorribb...

Страница 208: ...ach zero full calibration and CO ox sample measurement when excessive noise occurs for the tHb analytical detector during a dark noise BIT 7 detection occurs during PUI and for each zero full calibrat...

Страница 209: ...alyzed 1 When prompted shut down the system as described in Shutting Down the System page 256 wait 10 seconds and then turn the system on 2 If the message appears again replace the cartridges Refer to...

Страница 210: ...ed in Shutting Down the System page 256 wait 10 seconds and then turn the system on 2 If the message appears again replace the lamp as described in Replacing the CO ox Lamp in Replacing Components Ser...

Страница 211: ...ed in the CO ox electronic components NOTE The system can measure samples and report results for parameters that are still available 1 Shut down the system as described in Shutting Down the System pag...

Страница 212: ...IT Message Probable Cause and Corrective Action D77 Coox Temperature Error An error has occurred in the CO ox temperature control components This error can occur if a temperature control component has...

Страница 213: ...o 37 25 C and is still out of range 15 minutes after the temperature operational exception is detected CO ox results are not reported all other parameters in calibration report results CO ox sample re...

Страница 214: ...le port canalso causethis problem Thesharpedges of capillary tubes can damage the sample port affecting sample aspiration 1 Toavoidbubbles inpatientsamples ensurethatyouusethe recommended collection s...

Страница 215: ...eplacing the Measurement and Wash Waste Cartridges in Section 3 to install a new cartridge 2 If the cartridge does not match the software use a different cartridge or install the correct version of so...

Страница 216: ...ent Samples in Section 1 in the Rapidpoint 400 Series Operator s Manual to identify the minimum sample volume for the sample device that you are using Service Solutions Performservicesolutionsonlyafte...

Страница 217: ...g the AutomaticQC Cartridge on page 168 Service Solutions Performservicesolutionsonlyafterallothercorrectiveactions have been completed If cartridge replacement does not solve the problem 1 Examine th...

Страница 218: ...fore leaving the customer site 1 Use the measurement cartridge simulator to perform the measurement test 2 Check cables and connections to cartridge interface assembly 3 Replace the connector block 4...

Страница 219: ...are currently scheduled for Required QC analysis but no lot information is entered for a control that is currently scheduled Define a new lot of the control as described in Defining New Lots of Contro...

Страница 220: ...duled for the next level of QC analysis are not available for example because they are out of calibration Determine why parameters are not available and correct the problem Refer to Button and Paramet...

Страница 221: ...ons occurs Required QC analysis is currently scheduled The cartridges are nearly expired or depleted One or more parameters are turned off because they failed Required QC or AutomaticQC analysis Requi...

Страница 222: ...minutes or more Message Probable Cause and Corrective Action Temp Not Ready Thesystemdetectsthatthetemperatureofthesensormodule is outside the acceptable measurement range This message can occur when...

Страница 223: ...g Message Probable Cause and Corrective Action Temp Out of Range The system detects that the temperature of the sample is beyond the acceptable measurement range at the end of sample analysis This mes...

Страница 224: ...Not in Retro Calibration Mode At the end of measurement the measurement module temperature was found to be outside the range 37 0 2 C for all patient sample types For QC sample types the range will be...

Страница 225: ...o long If necessary you can analyze samples while this message is displayed 1 If possible wait until the system removes the message from the Status screen indicating the temperature is now within rang...

Страница 226: ...efer to the related exceptions Temp Not Ready and Temp Out of Range If during a non fatal temperature error no measurement cartridge is installed then the measurement cartridge replacement procedure w...

Страница 227: ...turer The system did not detect a sample Remove the sample device if present and touch Continue Replace the sample port when prompted The system cannot report results for the patient or QC sample beca...

Страница 228: ...potassium sensor is out of calibration The system uses a default value of 140 mmol L for sodium or a value of 4 mmol L for potassium to correct the Hct result On the screen and the report the letter...

Страница 229: ...Rapidlink data management system or the LIS is correctly configured to communicate with the Rapidpoint 400 series system 5 Ensure that the cable is not damaged and that it is the correct cable for co...

Страница 230: ...are performed Once a measurement cartridge is removed if reinstalled it is likely to fail within a few days To verify repairs you may reinstall the measurement cartridge while remaining in Diagnostics...

Страница 231: ...ay The Diagnostics screen appears temperature prints the temperature for various system components lamp cal tests and calibrates the halogen lamp wavelength cal tests neon lamp operation and alignment...

Страница 232: ...ints the report Sample Measurement Report If you want to print the Then touch Using the following cartridge measurement report Measurement simulator sensor report Sensor real printer report Printer re...

Страница 233: ...ng the Printer Use this procedure to check that the printer character set is functioning correctly 1 Touch the Recall button 2 Touch Sample Totals 3 Touch Diagnostics CAUTION The system cannot perform...

Страница 234: ...appears NOTE Ensure that printer paper is inserted into the printer 5 Touch Printer The paper advances and the printer begins to print 6 Discard the printout then touch Printer again 7 Verify the pri...

Страница 235: ...ence is running or has run in the last 60 seconds 3 Steady State Count Time in seconds that the heater has been at the steady state Uses this signal for error checking and block set point changes 4 Bl...

Страница 236: ...test moves the valve to three positions numbered 1 through 3 The number of the current position appears on the screen when you touch Change The test is complete when position 3 appears on the screen...

Страница 237: ...ves the valve to all 14 positions The number of the current position appears on the screen when you touch Change The test is complete when position 14 appears on the screen 9 Touch Stop to stop the te...

Страница 238: ...en working with biohazardous materials CAUTION The system cannot perform routine fluidic activities while you are at the Diagnostics screen or while you are performing diagnostic tests When you exit f...

Страница 239: ...on the screen 11 Touch Stop to stop the test 12 Repeat this procedure from step 6 if you want to test the other pump 13 Touch the Continue button three times to return to the Analysis screen If you w...

Страница 240: ...ple Totals 3 Touch Diagnostics 4 Enter the service password or use the password of the day 5 Touch the Continue button 6 Remove the measurement and the wash waste cartridges a Open the door BIOHAZARD...

Страница 241: ...1145 to 1662 4 GLU_A 50 to 50 340 to 460 3000 to 3700 5 GLU_B 50 to 50 340 to 460 3000 to 3700 6 LAC_A N A N A N A 7 LAC_B N A N A N A 8 K 1229 to 809 246 to 214 732 to 1232 9 Na 787 to 349 39 to 511...

Страница 242: ...n b If the test fails again replace the connector block For more information refer to Illustrated Parts Lists are within the ranges provided in the measurement channels table remove the cartridge simu...

Страница 243: ...e cartridge simulator NOTE Perform steps 4 through 14 to test the pump flow for either the sample or the wash pump 4 Place the inlet tubes into a beaker of reagent water 5 Place the outlet tubes into...

Страница 244: ...ts of the valve position 2 measurement in the system Diagnostic Tests Tools Required Verification Gauge NOTE Prior to use check that the valve alignment gauge is correctly set to zero If adjustment is...

Страница 245: ...eads within 0 0 5 If the result Then is not within the acceptable range loosen the set nut on the gauge and adjust the gauge to zero When adjustment is complete tighten the set nut Go to step 2 is wit...

Страница 246: ...tinue button 8 Touch M Valve 9 Touch Start The valve moves to position 1 on the screen 10 Touch Change The valve moves to position 2 on the screen 11 With the valve in position 2 verify that the gauge...

Страница 247: ...otals 5 Touch Diagnostics 6 Enter the service password or use the password of the day The Diagnostics screen appears 7 Touch AQC Valve 8 Touch Start The position number on the display is at 1 The AQC...

Страница 248: ...o the following figure which shows how the AQC valve appears when the position number on the display is 2 The AQC valve is at fluid position 1 and is in alignment with the probe hole AQC Valve at Flui...

Страница 249: ...E The AQC valve positions are tested twice during the alignment test Once with the measurement cartridge valve in the wash position and again with the valve in the ventAQC position For positions 1 7 a...

Страница 250: ...lay AQC Valve Alignment minimum acceptability NOTE The criteria for a pass on each of the valve positions is determined by the ability to see any edge of the probe hole Position Indicated on Display F...

Страница 251: ...tch is moved back to the ON position the message disappears 19 Return to the Diagnostics screen 20 When the test is complete put the AQC cartridge simulator switch in the OFF position If you want to T...

Страница 252: ...ration During the test the lamp is turned on using the most recent lamp calibration settings and a full lamp calibration and diagnostic test is performed NOTE Perform this test whenever the lamp is ch...

Страница 253: ...ecall button 3 Touch Sample Totals 4 Touch Diagnostics 5 Enter the service password or use the password of the day The Diagnostics screen appears 6 Touch the Wavelength Cal button Allkeysaredisabled t...

Страница 254: ...y This test may be used to directly turn the lamp on and off using the most recent lamp calibration settings to control the intensity of the lamp while diagnosing problems with the illumination system...

Страница 255: ...hamber An error flag indicating a sample chamber position error is detected if the sample chamber fails to move to the targeted position during testing NOTE A measurement cartridge or a measurement ca...

Страница 256: ...ering from a Power Loss Cartridges installed in the system remain stable for 60 minutes without power If power is removed from the system for less than 60 minutes you can resume operating the system w...

Страница 257: ...splays the Rapidpoint 400 series system title screen 2 If prompted replace the cartridges Refer to Replacing the Measurement and Wash Waste Cartridges in Section 3 in the Rapidpoint 400 Series Operato...

Страница 258: ...258 Rev C...

Страница 259: ...ssembly Illustrations 261 Main Assembly Parts List 278 Cartridge Interface Assembly Illustrations 281 Cartridge Interface Assembly Parts List 286 Power Module Assembly Illustrations 287 Power Module A...

Страница 260: ...260 Rev C...

Страница 261: ...Illustrated Parts Lists 261 Main Assembly Illustrations System Frame rear view 1 Paper cover 2 Handle 3 Display printer assembly 4 Display support 5 Spring pawl shown in the forward position 6 Display...

Страница 262: ...262 Rev C Handle Pawl...

Страница 263: ...Rev C Illustrated Parts Lists 263 Wash Waste Switch Rubber Feet...

Страница 264: ...264 Rev C Display Display Bracket...

Страница 265: ...Rev C Illustrated Parts Lists 265 Front View of the System Rapidpoint 400 System 1 Cartridge interface assembly 2 Door hook 3 Pre amp cable 4 EDS Ground strap 5 Outboard cable harness 6 Door switch...

Страница 266: ...266 Rev C Front View of the System Rapidpoint 405 System 1 CO ox sample chamber interface assembly 2 Fiber bundles 3 5 pin connector...

Страница 267: ...Rev C Illustrated Parts Lists 267 Front Door Door Hook...

Страница 268: ...268 Rev C Cartridge Interface Assembly Front Door Switch...

Страница 269: ...Rev C Illustrated Parts Lists 269 ESD Ground Strap Polychromator Module 1 CO ox polychromator module...

Страница 270: ...270 Rev C Diskette Drive Diskette Drive Side 1 Diskette drive cable 2 Diskette drive fascia 3 Diskette drive...

Страница 271: ...Rev C Illustrated Parts Lists 271 Diskette Drive Diskette Drive Cable Shield...

Страница 272: ...the rear interconnect cable 2 Connector for the power harness 3 UIP board 4 UIP utility cable 5 UIP display cable 6 Main board 7 UIP LPD Com 2 cable 8 Connector tor the patch cable 9 UIP Com Inboard c...

Страница 273: ...Rev C Illustrated Parts Lists 273 Connector UIP PCB UIP PCB with Cables...

Страница 274: ...274 Rev C Main PCB Main PCB Attached to Frame...

Страница 275: ...Rev C Illustrated Parts Lists 275 AQC Frame Assembly AQC Frame Assembly 1 AQC frame assembly 2 Main Interconnect board...

Страница 276: ...276 Rev C AQC Latch Assembly Front View AQC Latch Assembly Rear View 1 AQC latch assembly...

Страница 277: ...Rev C Illustrated Parts Lists 277 Cover...

Страница 278: ...10 Wash Waste Switch 570312 126864 kit 11 Screw Phillips Pan head C12a SEMS 106144 126864 kit 12 Boot Switch Lever 108686 126864 kit 13 Screw Shoulder 4 40 0 125 X 25 109232 14 Panel Access AQC 12092...

Страница 279: ...8 46 Cable Assembly UIP COM1 Inboard 570272 48 Drive Disk DSDD 3 5 inch 122199 122530 49 Bracket Disk Drive 100369 50 Screw Metric Pan head 823705002 51 Washer Lock 4 823342003 52 Fascia Diskette Driv...

Страница 280: ...ut KEP 6 32 SCP 823737005 82 Strap ESD Ground 110507 122566 84 Tape Conductive 825025001 85 Door Lock Assembly 116315 122561 86 Screw Thread forming 3 24 117671 87 Door Hook 126788 89 Harness Inboard...

Страница 281: ...sts 281 Cartridge Interface Assembly Illustrations Cartridge Interface Assembly 1 Outboard cable harness 2 Spring plate 3 Connector block 4 Thermal cover 5 Cartridge handle 6 Cartridge interface frame...

Страница 282: ...282 Rev C Pump Housing Peri pump Motor and Mount...

Страница 283: ...Rev C Illustrated Parts Lists 283 Peri pumps Spring Plate...

Страница 284: ...284 Rev C Connector Block Cartridge Handle...

Страница 285: ...Rev C Illustrated Parts Lists 285 Preamp Cable Cover...

Страница 286: ...ri pump 570223 122549 kit 13 Roller Cage 100552 122554 14 Mount Motor 570546 122549 kit 15 Plate Spring 570547 16 Housing Pump 100146 122546 17 Spring Peri pump 570320 122567 20 Probe Motor 109678 21...

Страница 287: ...r Module Assembly Illustrations Power Module Assembly Rapidpoint 400 System 1 Power supply 2 Power entry with switch 3 Rear interconnect board 4 Patch cord 5 Hard drive cable 6 Hard drive 7 Fan 8 DC p...

Страница 288: ...288 Rev C Power Module Assembly Rapidpoint 405 System 1 Neon board assembly 2 Fiber bundle assembly 3 Illumination housing assembly 4 Fiber bundle assembly...

Страница 289: ...Rev C Illustrated Parts Lists 289 Power Module Frame Power Entry with Switch...

Страница 290: ...290 Rev C Rear Interconnect Board Fan...

Страница 291: ...Rev C Illustrated Parts Lists 291 Power Supply Patch Cord with Ferrite Filter...

Страница 292: ...292 Rev C Hard Drive...

Страница 293: ...odule Power Entry with Switch 100376 122547 11 Fan Cooling 100053 122533 12 Screw Phillips Pan head 6 32 X 1 4 823810205 13 Nut KEP 6 32 SCP 823737005 14 Strip Contact 101802 17 Fuse 5 X 20 MM 105836...

Страница 294: ...294 Rev C CO ox Module Components Illustrations Sample Chamber Interface Assembly RSL Part 131530...

Страница 295: ...Rev C Illustrated Parts Lists 295 Polychromator Module Assembly Part Number 130594 Illumination Housing Assembly Part Number 131529...

Страница 296: ...296 Rev C Neon Board Assembly Part Number 131526...

Страница 297: ...dle Assembly Part Number 130527 A Terminal A connects to the sample chamber interface B Terminal B connects to the illumination housing assembly C Terminal C connects to the neon board assembly D Term...

Страница 298: ...298 Rev C...

Страница 299: ...rface Assembly 309 Replacing the Connector Block Assembly 313 Removing the AutomaticQC Cartridge 318 Replacing the AutomaticQC Frame Assembly 320 Replacing the Diskette Drive Assembly 323 Replacing th...

Страница 300: ...Cages 345 Replacing the Pump Motors 349 Replacing the Wash Waste Switch 354 Replacing the Fiber Bundle Assembly 356 Replacing the Neon Board Assembly 358 Replacing the Illumination Housing Assembly 36...

Страница 301: ...Replacing Components 301 Replacing the Main Interconnect Board 372 Removing the Rear Cover and Power Module Assembly 375 Installing the Rear Cover Cartridge Interface Assembly and Power Module Assembl...

Страница 302: ...302 Rev C...

Страница 303: ...following procedure 1 At the Analysis screen touch the Status button 2 At the Status screen touch Replace Port 3 When prompted replace the sample port Refer to Figure 4 1 NOTE Touch the Video button t...

Страница 304: ...stem 1 Touch to view the video 2 Squeeze the tabs firmly 3 Remove the sample port from the system 4 Squeeze the tabs on the new sample port and install the sample port in the system 5 Touch the Contin...

Страница 305: ...edure from step 3 the system returns to the Analysis screen resume operating tasks the system displays the Status screen and prompts you to replace the cartridges replace the measurement and wash wast...

Страница 306: ...shown 1 Turn off the power switch and disconnect the power cord from the electrical outlet 2 Disconnect the power cord from the rear panel of the system 3 Locate the fuse holder on the rear panel of t...

Страница 307: ...fuses 6 Slide the fuse holder into the fuse compartment 7 Reconnect the power cord to the system 8 Reconnect the power cord to the electrical outlet and turn the power switch on After the Rapidpoint...

Страница 308: ...er to the following figure Replacing the CO ox Lamp 4 Remove the old lamp and discard it 5 Install a new one 6 Reconnect the power cord to the system 7 Reconnect the power cord to the electrical outle...

Страница 309: ...ove the rear cover Refer to Removing the Rear Cover and Power Module Assembly on page 375 3 Open the door a Slide the front of the system to the edge of the work surface b Usingasmallflat bladescrewdr...

Страница 310: ...remove the two flat head screws in the front of the cartridge interface assembly b Remove the two screws from the front of the cartridge interface assembly securing the sample chamber interface assemb...

Страница 311: ...n the cartridge interface wall f Disconnect the harness OMZ 5 pin from J2 on the OMZ PCB on the sample chamber interface assembly This harness is also connected to the connector block assembly g Pull...

Страница 312: ...ter is not present k Remove the AQC cable P40 from the cable clamp and disconnect the AQC connector l Remove the cartridge interface assembly from the system 5 Install the new cartridge interface asse...

Страница 313: ...ernal cables from the back of the system 2 Remove the rear cover Refer to Removing the Rear Cover and Power Module Assembly on page 375 3 Remove the cartridge interface assembly Refer to Replacing the...

Страница 314: ...ge interface assembly have in line connectors and do not require using the pin extractor 7 Using the pin extractor twist and remove wires 18 19 20 and 21 from the outboard cable harness connector 8 Re...

Страница 315: ...k connector wires which run along the rear of the cartridge interface frame 10 Remove the cam shaft a Using the flat blade screwdriver remove the pinion gear from the end of the cam shaft b Using eith...

Страница 316: ...ame b Slide the springs onto the alignment pins Mount the connector block by sliding the block alignment pins through the holes in the cartridge interface frame c Reinstall the camshaft NOTE The posit...

Страница 317: ...18 and 19 and the two black wires to positions 20 and 21 in the outboard cable harness connector and secure with a cable tie 15 Reinstall the cartridge interface assembly Refer to Installing the Rear...

Страница 318: ...screws one screw on each side and two screws on the rear of the cover NOTE Position the instrument handle in the up position Using a flat head screwdriverpry thecoverandtheside withoutthe AutomaticQC...

Страница 319: ...en the cartridge and the side of the system and lift the tab to release the cartridge NOTE If the cartridge does notrelease from the system pushthecartridge into the system to fully engage the anchors...

Страница 320: ...o Removing the AutomaticQC Cartridge on page 318 2 Turn the system off and disconnect all the external cables from the back of the system 3 Remove the rear cover Refer to Removing the Rear Cover and P...

Страница 321: ...r AutomaticQC clip from between the AutomaticQC frame assembly and the base wall c Disconnect the cable J43 from the AutomaticQC frame assembly While pulling the AutomaticQC latch assembly from the sy...

Страница 322: ...away from the wall interface and lift it out of the system c Disconnect the cable from the AutomaticQC frame assembly to the outboard cable harness 7 Reinstall the AutomaticQC frame assembly and the...

Страница 323: ...over and Power Module Assembly on page 375 3 Disconnect the following cables 4 Remove the diskette drive from the interface wall NOTE Ifrequired removethe spring clipon thebottom ofthediskette drive b...

Страница 324: ...two Phillips head screws at the top and bottom of the diskette drive connector clamp d Remove diskette drive cable form its cable clamp 1 Diskette drive cable 2 Screw at top of diskette drive connecto...

Страница 325: ...ystem and adjust the screws as necessary 6 Reassemble in the reverse order Refer to Installing the Rear Cover Cartridge Interface Assembly and Power Module Assembly on page 378 CAUTION Wheninsertingth...

Страница 326: ...m off and disconnect all the external cables from the back of the system 2 Remove the ampule breaker or Automatic QC cartridge and open the front door 3 Remove the rear cover and power module assembly...

Страница 327: ...ng screws to 6 inch lb 6 Remove the diskette drive Refer to Replacing the Diskette Drive Assembly on page 323 7 Using the tilt display handle pull the display forward 8 Disconnect the display cable fr...

Страница 328: ...13 Install the new display module NOTE Leave some slack in the display cable between the display and the interface wall to allow for movement of the display a Reinsert the display cable through the sl...

Страница 329: ...tooth at a time until correctly seated d Tilt the display module back completely Locate the hinge brackets at the base of the display and pull the hinge brackets forward Tighten the two screws located...

Страница 330: ...Power Module Assembly on page 375 3 Remove the ampule breaker or AutomaticQC cartridge and open the front door 4 Using the tilt display handle pull the display forward 5 Using a flat blade screwdrive...

Страница 331: ...ot until it locks into place NOTE If the spring pawl jams position a screwdriverbehind the spring pall and push it forward while sliding the display support forward one tooth at a time until correctly...

Страница 332: ...332 Rev C 10 Replace the rear cover Refer to Installing the Rear Cover Cartridge Interface Assembly and Power Module Assembly on page 378...

Страница 333: ...bladescrewdriver accessthedoor locksolenoid through the middle hole of the three access holes in the bottom front right corner of the system and push the solenoid toward the back of the system until t...

Страница 334: ...nal cables from the back of the system 2 Remove the rear cover and power module assembly Refer to Removing the Rear Cover and Power Module Assembly on page 375 NOTE Retain grommets and nylon spacers a...

Страница 335: ...the longer screws 4 Install the new hard drive a Before connecting the hard drive cable align the cable with the four pins b Install the hard drive 5 Ensure that the hard drive cable is correctly rec...

Страница 336: ...of the touch screen during start up Refer to Emergency Calibration of the Touch Screen in Calibrations b Enter the data on the Service Data screen c Restore the setup data d Enter the IP addresses if...

Страница 337: ...odule assembly Refer to Removing the Rear Cover and Power Module on page 375 3 Remove the power supply module a Cut the cable tie securing the DC power harness to the frame b Disconnect the cables fro...

Страница 338: ...J2 and J3 6 Ensure that all cables are not crimped or pinched 7 Reassemble in the reverse order Refer to Installing the Rear Cover Cartridge Interface Assembly and Power Module Assembly on page 378 1...

Страница 339: ...the power module and disconnect the cable 4 Pass the rear interconnect cable and the DC power harness from the Main board NOTE Installthenew fan with the air flow arrow pointingtoward the system inter...

Страница 340: ...ternal cables from the back of the system 2 Remove the rear cover and power module assembly Refer to Removing the Rear Cover and Power Module Assembly on page 375 3 Disconnect the power entry module f...

Страница 341: ...module 7 With a screw driver push down on the spring locks on the top and bottomofthepowerentrymoduleandpushthepowerentrymoduleout of the frame 8 Install the new power entry module a Pass the power en...

Страница 342: ...342 Rev C c Attach conductive tape to each side d Reconnect the power entry module to the power supply e Reconnect the grounding tag 9 Install the rear interconnect board...

Страница 343: ...1 Turn the system off and disconnect all the external cables from the back of the system 2 Remove the rear cover and power module assembly Refer to Removing the Rear Cover and Power Module Assembly on...

Страница 344: ...terconnect cable is soldered to the board a Remove the four hex standoffs from the frame b Remove the screw holding the clip at the top of the board 5 Remove the in line coupler from the board 6 Insta...

Страница 345: ...bles power LIS and bar code reader from the back of the system 2 Remove the rear cover Refer to Removing the Rear Cover and Power Module Assembly on page 375 3 Remove the cartridge interface assembly...

Страница 346: ...346 Rev C 4 Remove the pump motor on the right hand side as viewed from the front opposite side to the cartridge release lever a Remove the four thread forming screws from the motor mount...

Страница 347: ...of the motor shaft 5 Install the new pump roller cages a Slide the roller cageontothe shaftofthemotor housingwith the flat of the cage towards the flat of the housing b Push the roller cage until the...

Страница 348: ...cking tabs on the pump housing or the spring plate can pop off and interfere with system operation 7 Reassemble in the reverse order Refer to Replacing the Cartridge Interface Assembly on page 309 and...

Страница 349: ...e system 2 Remove the rear cover Refer to Removing the Rear Cover and Power Module Assembly on page 375 3 Remove the cartridge interface assembly Refer to Replacing the Cartridge Interface Assembly on...

Страница 350: ...ing the pin extractor disconnect the motor wires from the outboard cable harness D connector 5 Remove the motor Do not reverse the motors when removing orreplacing them or the new system will not func...

Страница 351: ...Rev C Replacing Components 351 a Remove the four thread forming screws from the motor mount...

Страница 352: ...all the new motor a Position the roller cage in the housing with the flat of the roller facing the flat of the housing b Replace the motor by pressing it until the cage and motor are fully seated CAUT...

Страница 353: ...the pins are seated securely in the outboard cable harness NOTE Whenreinstallingthecartridgeinterfaceassembly donotbumpthe spring plate and locking tabs on the pump housing or the spring plate can po...

Страница 354: ...embly on page 375 3 Remove the ampule breaker and AQC frame assembly cover or the AutomaticQC cartridge 4 Remove the AQC frame assembly Refer to Replacing the AutomaticQC Frame Assembly on page 320 5...

Страница 355: ...l the new wash waste switch assembly a Place the switch assembly on the interface wall shelf orientation will be at an angle b Pull the switch up so that the shelf is positioned between the bracket an...

Страница 356: ...e assembly a Disconnect the four sections of the fiber bundle assembly b Carefully remove the fiber bundle from the two cable clamps BIOHAZARD Refer to Biohazards and Warnings CAUTION Do notbend twist...

Страница 357: ...result in erroneous optics readings 5 Reconnect the new fiber bundle assembly 6 Check that the fiber bundle is not bunched or crimped 7 Reassemble in the reverse order Refer to Installing the Rear Co...

Страница 358: ...age 375 3 Remove the neon board assembly a Disconnect the neon power cable P6 b Pull up on the spring clip securing the fiber bundle to the neon board assembly then grasp the ferrule and remove the fi...

Страница 359: ...rews 5 Reconnect the fiber bundle to the neon board assembly and secure with the spring clip 6 Reconnect the neon power cable P6 Ensure that the wires are dressed correctly 7 Check that the fiber bund...

Страница 360: ...umination housing assembly a Disconnect the fiber bundle from the illumination housing assembly b Using a Phillips screwdriver remove the two Phillips screws located at the rear of the frame securing...

Страница 361: ...assembly 6 Check that the fiber bundle is not bunched or crimped 7 Reassemble in the reverse order Refer to Installing the Rear Cover Cartridge Interface Assembly and Power Module Assembly on page 37...

Страница 362: ...ver and power module assembly Refer to Removing the Rear Cover and Power Module Assembly on page 375 3 Remove the cartridge interface assembly Refer to Replacing the Cartridge Interface Assembly on pa...

Страница 363: ...the Main board and lock the connector note the orientation key b Place the bottom of the polychromator on the 1 inch standoff and insert the two long screws to the standoffs at the top located on the...

Страница 364: ...r fiber bundle to the sample chamber interface assembly 6 Check that the fiber bundle is not bunched or crimped 7 Reassemble in the reverse order Refer to Installing the Rear Cover Cartridge Interface...

Страница 365: ...on page 309 3 Remove the rear cover and power module assembly Refer to Removing the Rear Cover and Power Module Assembly on page 375 4 Disconnect both the polychromator fiber bundle and the fiber bund...

Страница 366: ...alling the Rear Cover Cartridge Interface Assembly and Power Module Assembly on page 378 9 After reassembly ensure that the optics head pivots springs and moves easily from side to side 10 Perform all...

Страница 367: ...retain a Loosen the screw do not remove on the bottom of the polychromator located on the 1 inch standoff b Disconnect the ribbon cable from the Main board c Remove the polychromator and set to the si...

Страница 368: ...the following cables from the Main Board UIP display cable UIP utility cable UIP LTPT1 comm cable UIP comm1 inboard cable 11 Removethethreescrewsandthecopper groundingclipsfromtherear of the Main boa...

Страница 369: ...er bundle terminal D at U3 on the Main board f Reinstall the two screws to the standoffs on the Main Interconnect board g Reconnect all the cables 16 Reinstall the polychromator a Reconnect the ribbon...

Страница 370: ...all the external cables from the back of the system 2 Remove the rear cover and power module assembly Refer to Removing the Rear Cover and Power Module Assembly on page 375 3 Disconnect following cabl...

Страница 371: ...P board to the standoffs 5 Remove the UIP board from the Main Interconnect board 6 Install the new UIP board 7 Reconnect all the cables 8 Reassemble in the reverse order Refer to Installing the Rear C...

Страница 372: ...moving the Rear Cover and Power Module Assembly on page 375 3 Remove the polychromator a Using a Phillips screwdriver remove the two screws from the standoffs located on the bracket of the Main Interc...

Страница 373: ...cable UIP utility cable Diskette drive UIP LPT1 comm cable UIP comm1 inboard cable 5 Remove the three screws securing the UIP board to the standoffs 6 Remove the UIP board from the Main Interconnect...

Страница 374: ...ibbon cable to at J7 on the Main board and lock the connector note the orientation key b Place the bottom of the polychromator on the 1 inch standoff and insert the two long screws to the standoffs at...

Страница 375: ...isconnect all the external cables from the back of the system 2 Remove the halogen lamp 3 Remove the rear cover a Using the Phillips screwdriver remove four screws one screw on each side and two screw...

Страница 376: ...he frame b Slightly spread the sides at the bottom of the power module frame while slowly pulling the frame straight back to expose the cables c Disconnect the hard drive cable from the UIP board d Re...

Страница 377: ...using assembly 5 Remove the power module assembly 6 If removing the cartridge interface assembly refer to Replacing the Cartridge Interface Assembly on page 309 7 Refer to Installing the Rear Cover Ca...

Страница 378: ...ver and power module assembly Go to step 2 cartridge interface assembly a Reconnect the door latch assembly harness P60 Ensure that the harness is positioned to the right hand side b Reconnect the was...

Страница 379: ...e through the access hole and reconnect j Reinstall the pre amp cable cover NOTE Pull the fiber bundle cables through the thermal baffle as you install the cartridge interface assembly CAUTION Do not...

Страница 380: ...380 Rev C...

Страница 381: ...Rev C Spare Parts 381 Spare Parts Spare Parts Listing 383...

Страница 382: ...382 Rev C...

Страница 383: ...ble DC Power Harness N 126789 09637530 Cable Hard Disk Drive I F N 126793 06753890 Cable Patch Cord Assembly N 122523 07814311 Cartridge Handle Assembly N 122567 06465852 Cartridge Housing Peri Pump S...

Страница 384: ...tor N 122547 05840439 Power Entry Module with Switch N 122560 07748025 Power Module Assembly R 122552 05773995 Power Supply Assembly Module R 126791 00181984 Pump Housing Clips pack of 4 N 122546 0793...

Страница 385: ...31527 01908624 CO ox Fiber Bundle Assembly N 131744 09250113 Verification Gauge N 131745 07295535 Measurement Cartridge Simulator 400 405 R 131609 04729860 Pawl Flipper Kit N N non repairable part R r...

Страница 386: ...386 Rev C...

Страница 387: ...ty and Health Administration s Bloodborne Pathogens Standard 1 3 Use this summary for general information only It is not intended to replace or supplement your laboratory or hospital biohazard control...

Страница 388: ...area disinfected Disinfect tools and other items that have been near any part of the instrument sample path or waste area with 10 v v bleach Do not eat drink smoke or apply cosmetics or contact lenses...

Страница 389: ...ds Do not operate electrical equipment after liquid has been spilled on it Turn off and disconnect the electrical equipment immediately and dry it thoroughly Do not operate electrical equipment in an...

Страница 390: ...us disease transmitted by blood body fluids and tissue approved guideline NCCLS Documentation M29 A Wayne PA NCCLS 1997 Dec 90p 3 Federal Occupational Safety and Health Administration Bloodborne Patho...

Страница 391: ...rature to successfully completetheinstallation Iftheambienttemperatureisnearthelimitsofthe recommended operating temperature 15 to 32 C the touch screen can become out of calibration Calibrate the scr...

Страница 392: ...per advance knob clockwise to move 2 to 3 inches of the paper through the top of the printer NOTE When you close the printer compartment ensure that the edge of the printer paper extends beyond the to...

Страница 393: ...e cartridges Refer to Replacing the Measurement and Wash Waste Cartridges in Section 3 in the Rapidpoint 400 Series Operator s Manual if required a Open the door b Lift up the measurement cartridge la...

Страница 394: ...itution squality control protocol before analyzing patient samples Installing the AutomaticQC Cartridge Use this procedure to install an AutomaticQC cartridge on your Rapidpoint 400 series system for...

Страница 395: ...Panel 4 View the video before you begin Observe the steps for replacing the cartridge 5 Remove the access panel 6 Install the AutomaticQC cartridge Refer to Replacing the AutomaticQC Cartridge in Sec...

Страница 396: ...installed cartridges by leaving the system without power for more than 60 minutes NOTE When relocating the system a change in ambient temperature of greater than 5 C may cause the screen to become out...

Страница 397: ...system as described in this procedure 1 Disinfect the exterior surfaces of the system Refer to Cleaning and Disinfecting the Exterior Surfaces in Section 3 in the Rapidpoint 400 Series Operator s Manu...

Страница 398: ...Options c Touch Unscheduled QC d Touch the Continue button twice The Status screen appears NOTE Clean and disinfect any areas that may be contaminated from spills around the measurement and wash wast...

Страница 399: ...the door opens again i Close the door again j Touch Cancel on the message The Status screen appears 6 Shut down the system a Touch the Status button b Touch Shutdown A message appears asking if you r...

Страница 400: ...400 Rev C...

Страница 401: ...ink systems You can connect the Rapidpoint 400 series system to a Rapidlink data management system using either of the following methods If your Rapidlink system is part of an Ethernet network that us...

Страница 402: ...ou want to assign the Rapidpoint 400 series system IP address for the default router port assigned to the network segment on which the Rapidpoint system is located Network mask for the institution s n...

Страница 403: ...ccessful o When prompted that the connection was unsuccessful touch the Continue button to display the Communications screen 4 Connect the network cable to the RJ 45 connector on the rear panel of the...

Страница 404: ...e DHCP k Touch the Continue button l At the Communications screen touch the Continue button m The Wait screen appears while the system tests the connection between the Rapidpoint 400 series system and...

Страница 405: ...ect the interface cable to the Rapidpoint 400 series system and to the Rapidlink workstation a Connect the 9 pin connector on the cable to the serial RS 232 port located on the rear panel of the Rapid...

Страница 406: ...t this time the connection is unsuccessful 9 Whenpromptedthattheconnectionwasunsuccessful touchContinue to display the Communications screen 10 At the Rapidlink workstation enter the communication set...

Страница 407: ...off and disconnect the power cord from the electrical outlet 5 Connect the interface cable to the Rapidpoint 400 series system and to the LIS a Connect the 9 pin connector on the cable to the serial R...

Страница 408: ...8 At the Communications screen touch the Continue button The Wait screen appears while the system tests the connection between the Rapidpoint 400 series system and the LIS If an error message appears...

Страница 409: ...ode scanner connector is located on the rear panel of the system and is labeled with a bar code symbol 3 Tighten the hold down screws on the connector 4 Attach the holder for the bar code scanner to t...

Страница 410: ...ser beam lights when the bar code scanner is working 7 RefertoSelectingBarCodeOptionsinSection6intheRapidpoint 400 Series Operator s Manual to define the bar code scanner settings for the Rapidpoint 4...

Страница 411: ...12345 b Touch the Status button c Touch Setup d Enter the default password 12345 and then touch the Continue button e Touch Secured Options f Touch the down arrow button and then touch Save Setup g Wh...

Страница 412: ...e f Touch the Continue button as needed to access the Setup or Status screen 3 If required record the System Name a Touch System Options b Touch Other Options c Write down the required information 4 I...

Страница 413: ...mpted remove the diskette form the drive and touch the Continue button f Touch Copy Sensor Data g Select today s date and touch Copy h Insert another blank preformatted diskette into the diskette driv...

Страница 414: ...from theoutside ofthe Rapidpoint 400 series system 4 Install a new roll of paper in the printer 5 Connect the following to the back of the Rapidpoint 400 series system bar code scanner power cord NOT...

Страница 415: ...from the drive and touch the Continue button 8 Touch System Options 9 Touch Date and Time 10 Change the date and time and then touch the Continue button 11 Leave the Rapidpoint 400 series system on t...

Страница 416: ...pear Setting Up RapidQC Complete in the Rapidlink Database 1 Select the Quality Control tab 2 Select QC Setup 3 Select Add Control 4 Choose the Rapidpoint 400 name for the new Rapidpoint 400 series sy...

Страница 417: ...the Rapidpoint 400 system name 9 Select Setup Active Levels 10 Select a Level enter the lot number the expiration date and start date and package insert ranges for each level of Hct QC 11 Repeat step...

Страница 418: ...Finishing the Rapidpoint Setup and continue with the procedure 5 If required enter the FTP Server name or IP address a Touch the Recall button b Touch Sample Totals c Touch Service Data d Enter the s...

Страница 419: ...ic messages Attempting to install the wrong cartridge type in the wrong mode can invalidate an otherwise good measurement cartridge Measurement cartridges last 28 days or 400 750 samples or whichever...

Страница 420: ...d in the FOR DEMONSTRATION ONLY mode DONOTinstallademonstrationcartridgewhileinUSERmode except just before you remove power to enter FOR DEMONSTRATION ONLY mode DO NOT change measurement cartridges fr...

Страница 421: ...ng with real cartridges or no cartridge 2 Touch Replace on the Cartridge Status screen and install a demonstration measurement cartridge a demonstration wash waste cartridge and a demonstration Automa...

Страница 422: ...R DEMONSTRATION ONLY mode to practice with setup options and cartridge replacement 9 When the demonstration is complete touch Continue 10 Touch Replace on the Cartridge Status screen The door opens 11...

Страница 423: ...e USER mode software loads This takes a few minutes If Then the message FOR DEMONSTRATION ONLY is not displayed 1 Touch Replace on the Cartridge Status screen 2 Open the door and verify that the cartr...

Страница 424: ...rebooted with a valid real measurement cartridge in place NOTE When replacing an AutomaticQC cartridge if you eject the old cartridge and do not have the replacement cartridge available the Return bu...

Страница 425: ...Diagnostics If Then a yellow dialog box appears and indicates that the measurement cartridge is not valid install a previously used measurement cartridge or demonstration cartridge 1 Touch Continue 2...

Страница 426: ...426 Rev C...

Страница 427: ...unknown sample patient or QC is used in conjunction with the slope and the offset to calculate analyte concentration Calibration Types There are three types of calibrations run on the Rapidpoint 400 s...

Страница 428: ...and 50 seconds 5 50 to complete Every third full 2 point calibration includes a blood fiber removal sequence preceding the calibration Retrospective Calibration Retrocal A patient sample run during t...

Страница 429: ...etecyclefromsampleloadinguntil the wash is complete takes 2 minutes Calibration Schedule After the initialization init period calibrations are scheduled as follows 1 point every 30 minutes 2 point eve...

Страница 430: ...ors thecartridgemustgo through a 22 minute initialization init When a new cartridge is placed correctly on the Rapidpoint 400 series system the system performs an electronic check initializes the luer...

Страница 431: ...the two scheduled calibrations When the initialization and respective calibration retrocal are complete the scheduled calibration timeline of 1 point calibrations every 30 minutes 2 point calibration...

Страница 432: ...432 Rev C...

Страница 433: ...system The 2 1 version of the Rapidpoint 400 series system uses Windows NT as an operating system This configuration does not require or use an FTP server All new Rapidlink configurations provided by...

Страница 434: ...ose this window 8 At the Windows NT Setup dialog box select Continue 9 At the Add RAS Device dialog box ensure that the correct modem is selected and then select OK 10 At the Remote Access Setup dialo...

Страница 435: ...otocol and then select Disable 24 Remove the Windows NT Workstation or NT Server CD from the CD ROM drive 25 Close the Network applet and restart the system when prompted Configuring RAS To Start Auto...

Страница 436: ...irectories The Rapidlink system must have two directories for the Rapidpoint 400 series system to use The Upload directory is used by the Rapidpoint 400 series system to copy files to The Download dir...

Страница 437: ...tab and then select Shared As c Ensure that the Share Name is Upload or Download and then select Apply d Select the Security tab and then select Permissions NOTE Some systems may not have a Security...

Страница 438: ...438 Rev C...

Страница 439: ...ed message 177 AQC Cartridge Not Valid message 177 AQC Connector is Open message 177 AQC cover part number 383 AQC frame assembly illustrations 275 part number 383 AQC latch assembly illustrations 276...

Страница 440: ...ess outboard 130 inboard 1 harness 133 inboard 2 harness 134 LCD backlight 134 patch cord 138 preamp module 135 UIP COM1 inboard 137 UIP display 136 UIP utility 137 cable harness outboard drawing 130...

Страница 441: ...110 data acquisition system DAS 85 display board 77 dualopto board 82 main board 83 main interconnect board 100 multiplexer board interface 98 multiplexer board 101 real time processor RTP 83 UIP mai...

Страница 442: ...dle 297 illumination housing 295 neon board assembly 296 polychromator 295 sample chamber interface 294 CO ox neon board assembly mechanical description 57 part number 384 CO ox OMZ heater board circu...

Страница 443: ...Glu pO2 message 186 pCO2 pH Na K Ca Cl Hct message 186 D40 Wash Not Detected message 201 D41 No AQC Material Detected message 202 D60 Communications Error message 204 D70 Optics Error 2 message 205 3...

Страница 444: ...message 214 door hook location 267 part number 383 door lock module replacing 333 door switch assembly part number 383 door switch location 268 download directories adding 436 dualopto board circuit...

Страница 445: ...d drive location 292 replacing 334 hazards See warnings I IDEE ROM explanation of system detecting 420 in the demonstration measurement cartridge 421 illimination housing illustration 295 illumination...

Страница 446: ...off test 254 LCD backlight cable drawing 134 liquid crystal display mechanical description 53 LIS See laboratory information system connection M M Cartridge Expired message 216 M Cartridge Not Valid m...

Страница 447: ...ting 235 mechanical descriptions 23 61 AutomaticQC cartridge 46 base model 26 54 cartridge interface module 43 CO ox fiber bundle assembly 58 illumination housing assembly 57 measurement components 56...

Страница 448: ...part numbers air filter 383 ampule breaker 383 AQC cover 383 AQC frame assembly 383 AQC latch assembly 383 AQC simulator 383 cartridge handle assembly 383 cartridge housing peri pump spring kit 383 c...

Страница 449: ...286 main assembly 278 power supply assembly 293 password entering 411 patch cord cable drawing 138 patch cord with ferrite filter location 291 patient samples result symbols 22 Pawl filpper kit part...

Страница 450: ...384 replacing 337 preamp cable cover illustration 285 preamp module cable drawing 135 printed reports sample measurement example 232 sample printer example 234 sample sensor example 233 sample tempera...

Страница 451: ...00 system 396 remote access service selecting 434 remote access setup to Rapidlink system 433 removing AutomaticQC cartridge 318 demonstration cartridges using the shutdown button 422 replaceable halo...

Страница 452: ...connection 405 rubber feet pack of 4 part number 384 rubber feet location 263 S sample chamber interface illustration 294 sample chamber test 255 sample devices 33 sample entry mechanical description...

Страница 453: ...ng valve mechanical description 33 sodium and potassium unexpected results 166 spare parts listing 383 spare parts 381 385 spares kit See Rapidpoint 400 spares kit spring plate location 283 status scr...

Страница 454: ...6 D38 Temp Error 1 198 D38 Temp Error 2 to 13 198 D39 Obstruction 200 D4 Offset Error Glu pO2 186 pCO2 pH Na K Ca Cl Hct 186 D40 Wash Not Detected 201 D41 No AQC Material Detected 202 D60 Communicatio...

Страница 455: ...calibrations overview 427 detecting IDEE ROM explanation 420 installing a new Rapidpoint 400 414 installing the Rapidpoint 400 391 relocating the Rapidpoint 400 396 shutting down the 256 swapping out...

Страница 456: ...ter status 155 communications 175 the printer 173 the touch screen 174 tubing mechanical description 35 types of calibrations 427 U u symbol 163 UIP board with cables location 273 UIP board replacing...

Страница 457: ...s of operation 420 viewing the events log 176 W W Cartridge Expired message 229 wand See bar code scanner warnings biohazards 387 electrical 389 wash pump test 230 wash waste cartridge depleted 160 ex...

Страница 458: ...458 Rev C...

Отзывы: