9.
Inspect the Winding Drum (31) set screws. Set screw at flat portion of the motor shaft must be below the
surface of the drum by approximately
3mm
. Set screw at round portion of the motor shaft must be below
the drum surface by approximately
2mm
.
If either set screw is loose, prepare screw threads with Loctite 425 Assure Sealant (or equivalent metal
adhesive) and tighten screw until it is the proper distance below the surface of the drum.
10.
Inspect the two white teflon Levers (items 5 and 44) to verify both spring back promptly when pressed
down. Verify attached tensions springs (items 7 and 42) are properly installed and are not stretched or
damaged. Note the levers do not require any lubrication and must be kept clean to operate properly.
If necessary, remove levers by loosening a metric M3 x 6 set screw (items 8 or 39). Place a gap of
0.05
mm (0.002 inch)
between the lever and Pin (items 6 or 43) and tighten the set screw.
11.
Inspect the ORG1 sensor to verify the inner portion of the sensor is clean. Re-assemble unit by inserting
into unit and attaching the right shaft
抯
end (item 4) into the hole at the instrument
抯
front wall. Then
re-attach the two screws (32) holding unit to the instrument and reconnect the two electrical cables.
12.
Verify the levers (5 and 44) safely clear the slots in the steel Rack Guide Assembly plate.
13.
Re-attach the Back Plate Frame 20 (see item 2 on page 10.34) by securing six M4 x 12 metric allen
screws (item 1). Re-connect electrical cables CN131, CN132 and CN136.
14.
Replace all covers and run With Tube Run in Service Test Mode (see page 7.4) for 30 minutes to verify
instrument is working properly.
9-11
Содержание Clinitek Atlas
Страница 1: ...Clinitek Atlas Rack Sample Handler Service Manual Cover...
Страница 14: ...CHAPTER FOUR OPERATIONS PROCEDURES SUMMARY Figure 4 1 Main Menu Operation Block Diagram 4 1...
Страница 20: ...Figure 6 2 Cross Feed Assembly 6 3...
Страница 22: ...Figure 6 4 Power Module Figure 6 5 The Interconnect PC Board and R1 Relay 6 5...
Страница 24: ...Figure 6 6 The Card Cage Assembly 6 7...
Страница 26: ...Figure 6 8 The CPU PC Board Figure 6 9 The I O PC Board 6 9...
Страница 37: ...Figure 7 1 Service Mode Block Diagram 7 3...
Страница 39: ...Figure 7 2 Without Tube Run Routine and With Tube Run Routine 7 5...
Страница 41: ...Figure 7 3 Barcode Test 7 7...
Страница 44: ...Figure 7 4 Sensor Monitor Routine Figure 6 12 Locating Instrument Sensors repeated from page 6 12 7 9...
Страница 46: ...Figure 7 5 Output Test Figure 7 6 Display Test 7 11...
Страница 61: ...Figure 8 1 Adjusting the Cross Guide and the Return Parts Guide Figure 8 2 The Power Supply 8 2...
Страница 63: ...Figure 6 12 Locating Instrument Sensors repeated from page 6 12 Figure 8 3 Location of Instrument Sensors 8 4...
Страница 66: ...Figure 8 5 Adjusting Tube Sensor PH4 8 6...
Страница 72: ...CHAPTER NINE REPAIR REPLACEMENT 9 1...
Страница 73: ...Figure 9 1 Removing the Covers Part One Figure 9 2 Removing the Covers Part Two 9 2...
Страница 75: ...Figure 9 3 The Return Feed Assembly 9 4...
Страница 77: ...Figure 9 4 The Rack Feed Assemblies In Feed Out Feed 9 6...
Страница 79: ...Figure 9 4 The Rack Feed Assemblies In Feed Out Feed 9 8...
Страница 81: ...Figure 9 4 The Rack Feed Assemblies In Feed Out Feed 9 10...
Страница 83: ...Figure 9 5 The Main Chassis Assembly 9 12...
Страница 85: ...Setting the Timing Belt Deflection Figure 9 7 The Cross Feed Assembly 9 14...
Страница 87: ...Figure 9 8 Proper Installation of Wire Cables on Winding Drums 9 16...
Страница 89: ...Figure 9 10 Removing and Replacing the Transfer Plate 9 18...
Страница 91: ...CHAPTER TEN PARTS BREAKDOWN ILLUSTRATED ASSEMBLIES 10 1...
Страница 94: ...Figure 10 1 Stat Tube Holder Assembly 10 4...
Страница 96: ...Figure 10 2 Stat Tube Holder Covers 10 6...
Страница 98: ...Figure 10 3 Return Feed Assembly 10 8...
Страница 101: ...Figure 10 4 Rack Feed In Feed Out Feed Assembly 10 10...
Страница 103: ...10 4 32 Cap Screw M4 x 18 4 10 4 33 Spring Washer 4 1 10 4 34 Plain Washer 4 4 10 11 a...
Страница 104: ...Figure 10 4 Rack Feed In Feed Out Feed Assembly 10 12...
Страница 106: ...Figure 10 5 Display Assembly 10 14...
Страница 108: ...Figure 10 6 Power Module Switch Box 10 16...
Страница 118: ...Figure 10 15 Main Chassis Assembly 10 26...
Страница 120: ...Figure 10 16 Cross Feed Assembly 10 28...
Страница 124: ...Figure 10 19 Main Chassis Unit Frames 10 32...
Страница 126: ...Figure 10 20 Frame Assembly 10 34...
Страница 132: ...Figure 10 25 Additional Parts Part 1 10 40...
Страница 134: ...Figure 10 26 Additional Parts Part 2 10 42...
Страница 136: ...Figure 10 27 Additional Parts Part 3 10 44...
Страница 138: ...Figure 10 28 Additional Parts Part 4 10 46...
Страница 140: ...Figure 10 29 Additional Parts Part 5 10 48...
Страница 142: ...Figure 10 30 Covers Part 1 10 50...
Страница 144: ...Figure 10 31 Covers Part 2 10 52...
Страница 154: ...11 6 a...
Страница 157: ...Figure 2 Installing Drill Fixture and Drilling Holes 11 9...
Страница 163: ...11 14 a...
Страница 168: ...Figure 3 Setting the Belt Tension 11 19...
Страница 170: ...Figure 4 Setting the JP1 Jumper on the Power Driver PC Board 11 21...
Страница 172: ...SCHEMATICS 12 2...
Страница 173: ...Figure 1 System Block Diagram 12 3...
Страница 174: ...Figure 2 AC DC Power Circuit 12 5...
Страница 175: ...Figure 3 Cables and Assembly Wiring Number 1 12 7...
Страница 176: ...Figure 4 Cables and Assembly Wiring Number 2 12 9...
Страница 177: ...Figure 5 Cables and Assembly Wiring Number 3 12 11...
Страница 178: ...Figure 6 Cables and Assembly Wiring Number 4 12 13...
Страница 179: ...Figure 7 Atlas Interconnect PC Board 12 15...
Страница 180: ...Figure 8 Cable Assemblies Number 1 12 17...
Страница 181: ...Figure 9 Cable Assemblies Number 2 12 19...
Страница 182: ...Figure 10 Cable Assemblies Number 3 12 21...
Страница 183: ...Figure 11 Driver PC Board 12 23...