background image

U

User Guide

en

United Kingdom

Please keep these instructions in a safe place.

If you move house, please hand them over to the next occupier.

Gas Fired Wall Mounted Condensing System Boiler

EcoBlue System

12 - 15 - 18 - 24 - 28 - 32

Содержание EcoBlue System 12

Страница 1: ...de en United Kingdom Please keep these instructions in a safe place If you move house please hand them over to the next occupier Gas Fired Wall Mounted Condensing System Boiler EcoBlue System 12 15 18...

Страница 2: ...retrieval system of any nature including in any database in each case whether electronic mechanical recording or otherwise without the prior written permission of the copyright owner except for permit...

Страница 3: ...Description 4 2 Operating Principle 4 2 1 In Operation 4 3 Control Panel Description 4 4 Standard Delivery 4 5 Accessories Options 4 5 1 Optional Extras 5 Operation 5 1 Shutdown 5 2 Frost Protection 5...

Страница 4: ...Procedure 10 Disposal 10 1 Disposal Recycling 11 Environmental 11 1 Energy Saving 12 Warranty 12 1 General 12 2 Terms of Warranty 12 2 1 Standard Warranty Terms and Conditions 13 Appendix 13 1 ErP In...

Страница 5: ...t the owner s risk If the appliance is used for purposes other than or in excess of these specifications the manufacturer will not accept any liability for resulting loss damage or injury The manufact...

Страница 6: ...r faulty or inadequate maintenance of the appliance Failure to abide by the instructions on installing the appliance This company declares that no substances harmful to health are contained in the app...

Страница 7: ...instructed on how to operate the appliance correctly Do not allow children to operate or play with the appliance 1 5 2 Installer s Responsibility The installer is responsible for the installation and...

Страница 8: ...e gas supply at the meter 2 Open windows and doors in the hazardous area 3 Do not operate light switches 4 Do not operate any electrical equipment 5 Do not use a telephone in the hazardous area 6 Exti...

Страница 9: ...ed with the product and that you have signed it to say that you have received a full and clear explanation of its operation The installer is legally required to complete a commissioning checklist as a...

Страница 10: ...upply External Fuse Rating 3A NOTE All data in this section are nominal values and subject to normal production tolerances 150mm Min 700mm 390mm 175mm Min 300mm Min if using 80 125mm flueing system 5m...

Страница 11: ...xternal Fuse Rating 3A NOTE All data in this section are nominal values and subject to normal production tolerances Electrical Protection IPX5D without integral timer IPX20 with integral timer 5mm Min...

Страница 12: ...32 model 32 kW 33 8 kW Pnc Condensing 3 The boiler is factory set for use only on Natural Gas G20 4 The boiler model serial number and Gas Council number are also shown on the information label behin...

Страница 13: ...utton When is displayed Boiler On the boiler will respond to timed Heating or Hot Water demand N B If only is displayed the boiler will not operate THESE BUTTONS INACTIVE except when an outdoor sensor...

Страница 14: ...n Single Channel Timer Wired Two Channel Timer Wired RF Digital Programmable Room Unit Wireless RF Mechanical Programmable Room Unit Wireless Condensate Discharge Pump and Pipe Trace Heating Flue Acce...

Страница 15: ...n the boiler will operate until the water temperature has been raised 3 Further protection may be required for the system Consult your installer for details 5 2 Frost Protection 5 Operation 1 If it is...

Страница 16: ...ral Heating ON see any instructions supplied with timer NO YES YES NO 15 10 5 20 2 5 15 10 5 20 2 5 Turn Room Thermostat to maximum setting typical example shown CH ON CH OFF bar 0 1 2 3 4 Is the Cent...

Страница 17: ...the Spanner symbol illuminated or flashing YES Spanner Symbol Error Code Flame Failure OR If you don t know what you need to do to get the boiler to light or need help with the system and controls co...

Страница 18: ...1 to set the required temperature Boiler Flow Temperature Adjustment On Off Selector Button If and are pressed together P02 will be displayed Pressing either button again will scroll through the displ...

Страница 19: ...the water must be topped up If necessary top up the CH installation recommended water pressure between 1 and 1 5 bar when system is cold Check radiators for leaks and especially in damp areas for rust...

Страница 20: ...ing should the filling pipe be connected between the two taps Ensure that the nuts on the pipe ends are tightened onto the taps and the system is cold 7 Fully open one of the taps first and then while...

Страница 21: ...e warm 4 Switch off the boiler 5 Vent the radiators Work from the lowest radiator in the property 6 Open the bleed vent with the key keeping a cloth pressed against the vent 7 Wait until water comes o...

Страница 22: ...ators are cold 4 Connect a drain hose to the lowest draining point Place the end of the hose in a drain or at a place where drained water will not cause any damage 5 Open the CH system drain valve Dra...

Страница 23: ...ressing the button and holding for two seconds Error Codes 117 and 118 can be reset by restoring the correct system pressure as described in 7 4 R P R R Table Of Error Codes WARNING If an error code d...

Страница 24: ...crease the value with the CH temperature button or if a room thermostat is connected increase the temperature on the room thermostat Activate the heating mode Open the valves of all radiators connecte...

Страница 25: ...d Switch off the boiler Switch off the boiler s electrical connection Close the boiler gas valve Drain the CH system See section 7 6 Draining the Installation CAUTION Only qualified professionals are...

Страница 26: ...losses Insulate the pipes in rooms that are not heated cellars and lofts Install loft insulation double glazing Use draught excluders where necessary Upgrade any older boiler external controls Turn do...

Страница 27: ...Benchmark Checklist The Benchmark Checklist will be completed by your installer and records that the boiler has been installed and commissioned correctly It can be found at the back of the installati...

Страница 28: ...ange for one of our nationwide team of Gas Safe registered engineers to visit If your product is in warranty everything is free of charge subject to our warranty terms and conditions If it is out of w...

Страница 29: ...t Prated or Psup Seasonal space heating energy efficiency Annual energy consumption Sound power level LWA indoors See For specific precautions about assembling installing and maintaining consult the r...

Страница 30: ...o B e g a k c a p f o s s a l c y c n e i c f e y g r e n e g n i t a e h e c a p s l a n o s a e S e g a k c a p f o y c n e i c f e y g r e n e g n i t a e h e c a p s l a n o s a e S R O n i y c n...

Страница 31: ...expression 115 11 Prated whereby Prated is related to the preferential space heater Weighting of boilers 0 0 0 0 1 0 3 0 37 0 2 0 55 0 70 0 3 0 75 0 85 0 4 0 85 0 94 0 5 0 95 0 98 0 6 0 98 1 00 0 7 1...

Страница 32: ...l terms and conditions visit www baxi co uk terms Failure to adhere to terms and conditions will void your manufacturer s warranty Baxi Brooks House Coventry Road Warwick CV34 4LL Please ensure the bo...

Отзывы: