Transportation, Unpacking
Mono Power Unit BUM 62, 63, 64
15
Baumüller Nürnberg GmbH
5.94005.12
3
T
RANSPORTATION
, U
NPACKING
The units are packed at the factory in accordance with the order.
You should avoid jarring packages in transit or jolting them, e.g. when setting them down on the ground.
After unpacking the package(s) and checking that the shipment is complete, you can start assembly.
Fibre board, cartridge paper and/or wood are used as packaging materials and they can be disposed of
in accordance with local regulations.
Report any damage in transit without delay.
DANGER
If the unit has been damaged in transit, do not connect it to the mains until appropriate high-voltage
testing has been carried out.
Ignoring this information can result in death, severe personal injury, or considerable damage to prop-
erty
Содержание BUM 62
Страница 1: ...E 5 94005 12 Manual Mono Power Unit BUM 62 63 64 ...
Страница 8: ...Safety Notes 8 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 10: ...Technical Data 10 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 2 1 2 Block diagram BUM 62 ...
Страница 14: ...Technical Data 14 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 2 3 Type code ...
Страница 16: ...Transportation Unpacking 16 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 28: ...Installation 28 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 40: ...Installation 40 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 5 5 2 Terminal diagram BUM 63 ...
Страница 41: ...Installation Mono Power Unit BUM 62 63 64 41 Baumüller Nürnberg GmbH 5 94005 12 5 5 3 Terminal diagram BUM 64 ...
Страница 62: ...Commissioning 62 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 66: ...Maintenance 66 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 73: ......