This chapter describes the process of starting up the assembled and installed (see
from page 45 onward) b maXX safe PLC module for the ini-
tial operation. The process of commissioning ensures that the b maXX safe PLC module
functions properly.
Before beginning the commissioning process, make sure that the following prerequisites
have been fulfilled:
1
The module is assembled correctly.
2
The module is installed correctly.
3
All safety devices are in operation.
4
The b maXX system is ready for use.
If the internal watchdog is triggered during the commissioning of the PLC, it is possible
that the cycle time of the safe application has been exceeded. In this case, the distribution
of resources between the standard and safe process will have to be adjusted.
WARNING!
Danger of injury from electric current!
The
Commissioning and validation checklist
from page 106 onward reproduced
in the Appendix should be used during the commissioning phase.
Therefore:
m
Make sure that the system is commissioned exclusively by qualified personnel.
m
Make sure that there are no people in the danger zone during the initial commis-
sioning. Always anticipate that a machine, system or safety device may not behave
as it is intended to.
m
Never leave the system unsupervised during commissioning with manually set
variables in debug mode (forcing). The important safety functions may not be ac-
tive in this form of operation. Make sure that no one enters the danger zone.
m
If changes or expansions are conducted during the commissioning process, the ef-
fects on the behavior of the system will have to be inspected. To do this, it will be
necessary to process the checklists for the planning and installation phase again.
Содержание b maXX BMC-M-SAF-02
Страница 8: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 8 of 118 ...
Страница 16: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 16 of 118 ...
Страница 58: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 58 of 118 ...
Страница 82: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 82 of 118 ...
Страница 90: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 90 of 118 ...
Страница 92: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 92 of 118 ...
Страница 100: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 100 of 118 A ...
Страница 119: ......