
Timing diagrams BM50XX
Instruction handbook
b maXX
5000
Document No.: 5.09021.16
Baumüller Nürnberg GmbH
210
8.2
m
Error acknowledge in case of power recovery
Power supply
X1:6 Ready-to-operate
X1:5 Error
150 ms
Using a BM50XX-XXX
1
The power supply was not available more than10 s or
another error was generated,
but is not active anymore.
X300:1 Signal bus ready-to-operate
X300:2 Signal bus phase failure
320 ms
Depending on the loading
state of the DC link
1)
1,4 s bis 3 s
Using a BM5030:
1,4 s < T < 6 50
C
int
C
ext
+
1s
+
Figure 98:
Timing diagram error acknowledge at power recovery BM50XX-XXX1
1)
The length of the time period until the Ready-to-operate signal is available again depends on the loading
state of the DC link. The higher the DC link voltage has been, the shorter the time period until the returning
of the Ready-to-operate signal will be.
Содержание b maXX 5000
Страница 101: ...Design and Operation Instruction handbook b maXX 5000 Document No 5 09021 16 101 of 328 4 ...
Страница 220: ...Fieldbus communication Instruction handbook b maXX 5000 Document No 5 09021 16 Baumüller Nürnberg GmbH 220 of 328 8 4 ...
Страница 240: ...Error handling Instruction handbook b maXX 5000 Document No 5 09021 16 Baumüller Nürnberg GmbH 240 of 328 10 4 ...
Страница 298: ...Instruction handbook b maXX 5000 Document No 5 09021 16 Baumüller Nürnberg GmbH 298 of 328 A ...
Страница 299: ...299 of 328 Operation Manual b maXX 5000 Document no 5 09021 16 APPENDIX B DECLARATION OF CONFORMITY ...
Страница 324: ...Instruction handbook b maXX 5000 Document No 5 09021 16 Baumüller Nürnberg GmbH 324 of 328 Table of Figures ...
Страница 328: ...Instruction handbook b maXX 5000 Document No 5 09021 16 Baumüller Nürnberg GmbH 328 of 328 Notes ...
Страница 329: ......