DC-link load / switch-on frequency of power supply
Instruction handbook
b maXX
BM3000, BM3200, BM3300
Document no. 5.11018.11
Baumüller Nürnberg GmbH
150
8.4
8.3.3
Service interface
The service interface transfers controller parameters from a PC/laptop to the controller
via the parameterization software ProDrive.
h
connect a free USB-port of the PC/laptop with the controller.
The driver for this connection was installed on the PC/laptop with ProDrive. The settings
of the connection (baud rate, etc.) are made in ProDrive. See ProDrive Online help.
8.4
DC-link load / switch-on frequency of power supply
Switch-on frequency accords to the time between two switch-on procedures. This period
cannot be selected freely, as each switch-on procedure is connected with a thermal load
of the precharge resistors.
These precharge resistors limit the starting current, when switching on the power supply
voltage.
NOTE!
Only, the service cable BM5-K-USB-XXX must be used for the X1-service interface.
Also see
on page 182. The maximum transmission rate is
920 kBaud.
NOTE!
If the service cable is not used, keep it in its ESD-packaging.
NOTE!
Between two switch-on procedures, there must be at least 3 minutes. If the time,
which is required to cool down is under this time, thermal overload and destruction of
the precharge resistors can occur.
Содержание b maXX 3000
Страница 67: ...Design and Function Instruction handbook b maXX BM3000 BM3200 BM3300 Document no 5 11018 11 67 of 218 4 ...
Страница 208: ...Instruction handbook b maXX BM3000 BM3200 BM3300 Document no 5 11018 11 Baumüller Nürnberg GmbH 208 of 218 A ...
Страница 209: ...209 of 218 Instruction handbook b maXX BM3000 BM3200 BM3300 Document no 5 11018 11 APPENDIX B DECLARATION OF CONFORMITY ...
Страница 212: ...Instruction handbook b maXX BM3000 BM3200 BM3300 Document no 5 11018 11 Baumüller Nürnberg GmbH 212 of 218 ...
Страница 218: ...Instruction handbook b maXX BM3000 BM3200 BM3300 Document no 5 11018 11 Baumüller Nürnberg GmbH 218 of 218 Notes ...
Страница 219: ......