From inside the unit, use 

a screwdriver to adjust the 

hanging position.

a:

 To lift or lower the unit adjust 

the screw shown.

b:

 To move the unit closer or 

further from the wall adjust the 

screw shown. 

Note: The unit 

may need to be removed and 

the ‘hanging hooks’ adjusted.

When correctly aligned, fix up 

through the lower bracket into 

the unit using the small screws.

Note: If door requires   

adjustment, follow the hinge 

adjustment section on page 3.

Decide on the opening side of the door, 

rotate the whole unit to change the 

opening side.

Drill Ø 5mm holes, ins

ert the wall plugs and fix using the 6 large screws.

a: 

Ensure it is vertical and mark

top corner positions onto the wall. 

b & c: 

Remove the unit, mark 

the fixing hole positions onto 

the wall. Drill Ø 5mm holes, 

insert the wall plugs and the 

wall brackets. 

 

d: 

Positions onto the wall, 

insert screws.

 

Step 1

Step 2

Step 3

208  

mm

62

 

mm

770

mm

60

mm

Back 

208

mm

150

mm

60

mm

770

mm

 

of unit

a

b

a

b

d

c

Plan unit position 

We suggest positioning the 

tower unit so it is level with 

any other unit that has been 

installed.

Unit height 

dependent on 

basin height