From inside the unit, use
a screwdriver to adjust the
hanging position.
a:
To lift or lower the unit adjust
the screw shown.
b:
To move the unit closer or
further from the wall adjust the
screw shown.
Note: The unit
may need to be removed and
the ‘hanging hooks’ adjusted.
When correctly aligned, fix up
through the lower bracket into
the unit using the small screws.
Note: If door requires
adjustment, follow the hinge
adjustment section on page 3.
Decide on the opening side of the door,
rotate the whole unit to change the
opening side.
Drill Ø 5mm holes, ins
ert the wall plugs and fix using the 6 large screws.
a:
Ensure it is vertical and mark
top corner positions onto the wall.
b & c:
Remove the unit, mark
the fixing hole positions onto
the wall. Drill Ø 5mm holes,
insert the wall plugs and the
wall brackets.
d:
Positions onto the wall,
insert screws.
Step 1
Step 2
Step 3
208
mm
62
mm
770
mm
60
mm
Back
208
mm
150
mm
60
mm
770
mm
of unit
a
b
a
b
d
c
Plan unit position
We suggest positioning the
tower unit so it is level with
any other unit that has been
installed.
Unit height
dependent on
basin height