5-2
BE1-50 Testing
Figure 5-1. Test Circuit Connection
Step 3.
Apply sensing current (near zero) and slowly increase the sensed current until the test indicator
changes state.
Result: Current indicated by the ammeter is within two percent of the low end of the sensing
range. If present, the target indicator for the tested phase (or neutral) should be
actuated.
Step 4.
Turn the pickup adjustment fully CW. Reset target indicators if present.
Step 5.
Apply sensing current (near zero) and slowly increase the sensed current until the test indicator
changes state.
Result: Current indicated by the ammeter is within two percent of the high end of the sensing
range. If present, the target indicator for the tested phase (or neutral) should be
actuated.
Step 6.
Repeat Steps 2 through 5 for each phase and neutral as necessary for your style relay. (Neutral
sensing ranges may be different than the phase sensing range.)
Содержание BE1-50
Страница 1: ... 05647 6 10 07 14 056 06 0 175 18 4 744 06 4 Publication 9 1710 00 990 Revision C 11 98 ...
Страница 5: ...iv BE1 50 Introduction CONTENTS Continued SECTION 7 MANUAL CHANGE INFORMATION 7 1 Changes 7 1 ...
Страница 12: ...2 2 BE1 50 Human Machine Interface Figure 2 1 Location of Controls and Indicators ...
Страница 20: ...BE1 50 Installation 4 5 Figure 4 7 S1 Case Single Ended Panel Drilling Diagram Rear View ...
Страница 21: ...4 6 BE1 50 Installation Figure 4 8 S1 Case Double Ended Panel Drilling Diagram Rear View ...
Страница 22: ...BE1 50 Installation 4 7 Figure 4 9 Outline Dimensions Rear View ...
Страница 26: ...BE1 50 Installation 4 11 Figure 4 15 Typical Output Connections Sensing Input Type F and Output E or G ...
Страница 29: ...4 14 BE1 50 Installation Figure 4 18 Typical Internal Connections Single Phase Output E Option 3 5 ...