INTRODUCTION 

AVC63-2 Voltage Regulators are intended 
for use on 50 Hz or 60 Hz brushless 
generators. The AVC63-2 includes a solid-
state buildup circuit and EMI filtering. 

WARNING! 

To prevent personal injury or equip-
ment damage, only qualified techni-
cians or operators should install, 
operate, or service this device. 

ELECTRICAL SPECIFICATIONS 

DC Output Power 

Maximum Continuous: 2 Adc at 63 Vdc  

One-Minute Forcing: 3.17 Adc at 100 Vdc 
(at 240 Vac input). 

Exciter Field DC Resistance 

31.5 

, minimum.  

AC Power Input 

Single phase, 50/60 Hz 

Operating Range: 171 Vac to 264 Vac 

Burden: 320 VA. 

Sensing Input 

Single phase, 50/60 Hz 

Operating Range: 171-264 Vac 

Burden: 320 VA. 

Regulation Accuracy 

Better than ±1.0%, no-load to full-load. 

EMI Suppression 

Internal, electromagnetic interference (EMI) 
filter  

Voltage Buildup 

Internal provisions for automatic voltage 
buildup from generator residual voltage as 
low as 10 Vac. 

Terminations 

¼ inch quick-connect terminals 

PHYSICAL SPECIFICATIONS 

Temperature 

Operating: –40 to 60

°

C (–40 to 140

°

F) 

Storage: –40 to 85

°

C (–40 to 185

°

F) 

Vibration 

Withstands 1.5 G at 5 to 29 Hz; 0.036" 
double amplitude at 29 to 52 Hz; and 5 G at 
52 to 500 Hz.  

Shock 

Withstands up to 15 G in each of three 
mutually perpendicular axes.  

Weight 

3.7 oz. (105 g) 

FUSES 

It is recommended that fuses with high 
interruption capability be installed per the 
interconnection diagram to protect wiring 
from faults before the regulator. See 
Interconnection Drawings. 

NOTE

 

Fuse must be installed per the inter-
connection diagrams to avoid inter-
rupting the field current. 

OPERATION 

The following system operation procedures 
provide instructions for adjusting the AVC63-
2 voltage regulator. Symptoms resulting 
from a faulty regulator and certain generator 
system problems are included, together with 
suggested remedies. 

Complete the following steps before 
proceeding with the system start-up. 

CAUTION

 

Meggers and high-potential test 
equipment must not be used. 
Incorrect use of such equipment 
could damage the semiconductors 
contained in the regulator. 

PRELIMINARY SETUP 

1. Verify that the voltage regulator 

specifications conform with the generator 
system requirements. 

2. Ensure the voltage regulator is correctly 

connected to the generator system. 

3. Install the fuses as described in Fuses. 

4. Set the regulator VOLT ADJ fully CCW. 

SYSTEM STARTUP 

1. Perform preliminary set-up as described 

in the above paragraphs. 

NOTE

 

All voltage readings are to be taken 
with an average reading voltmeter. 

2. Start prime mover and bring up to rated 

speed. 

RESULT: Voltage should build up. If not, 
perform Field Flashing. 

3. Slowly adjust the regulator VOLT ADJ 

CW until the generator output voltage 
reaches the nominal value. 

RESULT: Voltage should build up to rated 
value. If voltage does not build up to rated 
value, check generator for short or 
excessive load. 

4. Check regulator under normal operating 

and loading conditions. 

OPERATIONAL TEST 

1. Connect the test setup as shown in the 

figure titled 

Operational Test. Do not 

apply power. Ensure that the light bulb is 
rated for 240 V and is less than 100 W. 

 

2. Adjust the regulator VOLT ADJ to 

maximum CW. 

3. Apply 240 V, 50/60 Hz power to the 

regulator. The light bulb should illuminate. 

4. Slowly adjust the regulator VOLT ADJ 

control CCW. At the regulation point, the 
light bulb should extinguish. 

The following notes apply to the 
interconnection diagrams: 

1. Item not supplied by Basler Electric. 

2. Select fuses with high interrupting 

capacity. 

 

Outline Diagram (Top View) 

 

 

Outline Diagram (Side View) 

 

 

Operational Test Connections 

www 