Installation and operation
190160
17 / 40
EN
5.2
Operation
Before Use
1. Following installation, clean the appliance according to instructions in section
'Cleaning'.
2. Check if all connections are established correctly.
Switching-On
Fig. 5
1. Switch the appliance on with the disconnector.
2. Open the external water supply of the appliance.
The appliance is featured with automatic water supply to the boiler.
Additionally, it is
equipped with a safety mechanism, protecting against sudden water supply interruption:
– In such a case, the heating element, water supply solenoid valve and
motor pump are switched off automatically.
– The error is displayed in the display:
The error is displayed in the display:
Alarm Time-out
Fill the Boiler
3. Press the beverage button in the control panel of each brewing group and wait
until water flows continuously out of each brewing group.
This way the heat exchangers in the appliance will be filled correctly.