Installation and operation
20 / 35
104523
EN
Drain pump alarm (optionally)
blinks 1x
blinks 1x
Time extension between two production
cycles alarm
blinks 2x
ON 3"
Storage container probe damage alarm
blinks 3x
ON 3"
Upload/download HACCP data
—
software update
blinks 3x
blinks 3x
Condenser probe damage alarm
blinks 4x
ON 3"
Evaporator probe damage alarm
blinks 5x
ON 3"
Inverted deposit
–evaporator probe
alarm
blinks 5x
blinks 2x
Condenser cleaning alarm
blinks 7x
ON 3"
Start phase
OFF
2 Hz lamp
Ice cube production
OFF
ON
Ice dumping
OFF
ON
Storage container full
OFF
blinks 10 s
Standby phase
OFF
blinks 30 s
Cleaning cycle alarm
OFF
ON 3"
Ozone cycle alarm (optionally)
OFF
ON 1"
Power supply malfunction alarm or no
electric supply
OFF x 1"
ON 5"
Condenser high temperature alarm
ON
OFF
Содержание 104523
Страница 1: ...B 28 Plus B 38 Plus B 46 Plus B 70 Plus B 86 Plus 104523 104538 104548 104583 104593 ...
Страница 3: ...Beschr eibung ...
Страница 4: ......
Страница 6: ......