RDG603A31- Issue 4
Page 8 of 88
10.
Engine Alignment .......................................................................................................27
11.
Engine Inclination ......................................................................................................28
12.
Electrics .....................................................................................................................29
13.
Electrical Options .......................................................................................................29
14.
Engine Oil ..................................................................................................................30
15.
Fuel ............................................................................................................................30
16.
Coolant ......................................................................................................................31
17.
Control Cables ...........................................................................................................32
18.
Domestic Battery Bank ..............................................................................................32
19.
Control Panel .............................................................................................................33
20.
Exhaust System .........................................................................................................34
21.
Hydraulic Drive Transmissions ..................................................................................35
22.
Centa Coupling CF-M-160 (RDG2779) ......................................................................36
23.
PRM 280DP Gearbox with Power Take Off (Optional Extra) .....................................37
24.
Installation Check List ................................................................................................38
SECTION 6
– Operation .....................................................................................................39
1.
Starting the engine for the first time ...........................................................................39
2.
Starting Procedure .....................................................................................................39
3.
Stopping Procedure ...................................................................................................40
4.
Full Load Running ......................................................................................................40
5.
Refuelling ...................................................................................................................40
6.
Diesel Fuel Additive ...................................................................................................41
7.
Exhaust Back Pressure .............................................................................................41
8.
Hybrid System (For engine with Hybrid System fitted) ...............................................41
9.
Single Shift Control Lever Side Mount Operation - Optional (RDG9210055) .............41
SECTION 7
– Service Procedure ......................................................................................42
1.
Engine Oil and Filter Change .....................................................................................42
2.
Air Filter Check and Change ......................................................................................43
3.
Gearbox Oil Change ..................................................................................................43
4.
Disposal of Oil and Related Items ..............................................................................44