RDG603A62
– Issue 2
Page 14 of 19
NOTICE:
REFER TO THE YANMAR MANUAL PRIOR TO STARTING THE ENGINE.
1. Starting the engine for the first time
•
Remove ignition key.
•
Ensure all oil and coolant levels are checked.
•
Ensure both the engine and domestic batteries are connected. All battery master
switches must be turned on. Failure to do so may damage the domestic alternator.
•
Ensure that the raw water seacock is turned on.
2. Starting Procedure
•
Ensure there is no one in the engine compartment.
•
Ensure the engine compartment door is closed.
•
Ensure the gearshift control level is set to neutral and that all persons are clear of any
moving parts.
•
Insert ignition key.
•
Turn key to on position.
•
Press the heat start button for 10 seconds, the glow plug light will illuminate.
•
Observe warning lights (and gauges on deluxe panel). Note: The engine water
temperature overheat warning light will only come on for a brief period of time when
the ignition is first turned on as a bulb check. It will then only illuminate in the case of
the engine coolant temperature exceeding the maximum safety level.
•
Turn key to start and hold to crank.
•
Crank the engine for no more than 15 seconds.
•
Upon engine start, immediately release the key.
•
Key will return to on position.
•
The warning buzzer will stop and on the deluxe panel, the oil pressure gauge will show
an oil pressure of 3.5 - 4.5 bar (51
– 61 psi).
•
Should any warning light not go out, or if there is no reading on the oil pressure gauge,
the buzzer will continue sounding. In this case, stop the engine immediately and check
the relevant system (Note: If the charge light does not go out, briefly increase the
engine speed).
•
Once started check that water is coming out of the water cooled exhaust outlet in the
hull of the boat.
•
Stop engine if any abnormal noises are detected.
•
Visually check the engine for oil, fuel and coolant leaks, after initial start-up and at
Содержание SHIRE 15 YM DB BARNES
Страница 13: ...RDG603A62 Issue 2 Page 13 of 19 Figure 1 Standard Control Panel Dimensions SECTION 3 Operation...
Страница 17: ...RDG603A62 Issue 2 Page 17 of 19 SECTION 5 Wiring Diagrams 1 Shire to Yanmar Extension Loom...
Страница 18: ...RDG603A62 Issue 2 Page 18 of 19 2 Standard Control Panel Wiring Diagram...