background image

21

Troubleshooting

General

M

AINTENANCE AND

S

ERVICING

Problem

Causes

Solution

Leaks.

The most common leak is one
occurring in the vinyl drain
tubing. Hot water causes
softening and pulling loose at
the plastic barbed connectors.

Runs of vinyl tubing should be
supported to reduce the pull
on the plastic connectors.
Small clamps may be used to
firmly hold the vinyl tubing.

Rough Boiling.

Rough boiling is the result of
alkali attack to the matte finish
on the heaters. The most
common cause is using water
pretreated with NaCI
regenerated water softeners.

Remove heater and lightly
roughen surface with 150 grit
sandpaper. 

Scale Build-up.

A brownish-white scale in the
boiler indicates that the boiler
requires cleaning.

Clean boiler per cleaning
instructions. Scale should not
be allowed to accumulate as
heaters may be damaged.

 

Heater Failure.

Heater failure due to scale
build-up or alkali attack will
not be replaced under
warranty.

Short life on Vycor®
immersion heaters can usually
be attributed to use of water
pretreated with NaCI
regenerated water softeners
or excessive scale buildup.

Softened water used as a
boiler feed causes a
concentration of sodium ions
and alkaline attack of the
Vycor®  glass. Rough boiling
will be the first indication of
alkaline attack. At failure, the
heaters will usually pinhole
and water entering will short
out the element. 

Scale build-up will occur when
boiler feed is not being
deionized. 

If softened water must be
used, heater life can be
prolonged somewhat by
draining boiler every day.

When using the still without a
deionizer, scale build-up must
be removed after every 15-20
hours of operation (see
"Cleaning Instructions").
Failure to do so will cause
heaters to build up heat
internally and fail or cause
glass envelope failure.

Содержание Mega-Pure Series 798

Страница 1: ...ne Liter Water Still OPERATION MANUAL AND PARTS LIST SERIES 798 LT798X1 9 8 05 Model Number Voltage Description A440266 120V Without Bottle A440267 120V With Bottle A7981 240V Without Bottle A7982 240V With Bottle ...

Страница 2: ...the use of this equipment Water purification technology employees one or more of the following chemicals electrical devices mer cury vapor lamps steam and heated vessels Care should be taken when installing operating or servicing Barnstead products The specific safety notes pertinent to this Barnstead product are listed on page 4 Figure 1 MEGA PURE One Liter Still ...

Страница 3: ...ted Boiler Feed 12 Demineralizer Treated Boiler Feed 13 In House Treated Boiler Feed 14 Still Output Connections 16 Storage Bottle Installation 16 Automatic Collection System Installation 17 Operation 18 High Temperature Cut off Switch 19 Maintenance and Servicing 20 Cleaning 20 Troubleshooting 21 General 21 Electrical 23 Still Troubleshooting 23 Automatic Collection System Troubleshooting 24 Part...

Страница 4: ...water spillage and subsequent electrical shock hazard if improperly located 4 Replace fuses with those of the same type and rat ing 5 Disconnect from power supply before servicing 6 Do not connect unit to electrical service until instructed to do so To avoid personal injury 1 Do not use in the presence of flammable or com bustible materials fire or explosion may result This device contains compone...

Страница 5: ...perating To avoid burns do not touch hot glass 9 Refer servicing to qualified personnel C To ensure safe mounting 1 Wall composition and construction as well as fas tener type must be considered when mounting this unit The mounting surface and fasteners selected must be capable of supporting a minimum of 60 lbs inadequate support and or fasteners may result in damage to mounting surface and or equ...

Страница 6: ...of the still Choice of a location for your MEGA PURE One Liter Water Still is primarily a matter of convenience This unit may be located on a bench or wall mounted Your MEGA PURE One Liter Water Still is rated at either 120 volts 50 60 Hz 1000 watts single phase or 240 volts 50 60 Hz 1000 watts single phase This unit requires approx imately 11 to 15 liters per hour of cooling water The cabinet and...

Страница 7: ...ge Check parts in the accessory box for damage Identify any broken or damaged parts and report them to your dealer immediately Refer to Figure 1 page 2 for the following step 3 Using diagonal cutting pliers cut and remove the five 5 plastic shipping ties The shipping tie locations are Two 2 on the condenser B two 2 on the boiler I and one 1 on the trap N Unpacking ...

Страница 8: ...A 250V breaker box See Figure 3 Water Supply Requirements Barnstead recommends one of the following options for sup plying water to operate your MEGA PURE One Liter Water Still OPTION 1 A single untreated cold water supply The supply must be capable of providing a minimum of 4 gallons 15 liters per hour at a pressure of 20 100 psi and be located within 4 feet 1 2 meters of the MEGA PURE One Liter ...

Страница 9: ...valve and reducer at each water supply see Figure 4 In addition you will require the optional double sole noid valve kit Catalog No RY798X2A 120V or 440236 240V With Option 2 approximately 4 gallons of untreated water will be used each hour for cooling The second treated water supply of 1 gallon per hour will be used as boiler feed Water connections are discussed on pages 11 15 Drain An open or at...

Страница 10: ...of boiler I as shown in Figure 1 5 Unpack the Vycor immersion heater M and check the voltage rating on the top cap It should agree with the voltage of your power supply If it does not contact your dealer and order the correct heater 6 Insert the immersion heater into the top opening of boiler I as shown in Figure 1 7 Thread the heater plug and cord through the large hole above the boiler I then ba...

Страница 11: ...p Water Boiler Feed See Figure 6 1 Install a customer supplied shutoff valve onto your tap water source Thread the solenoid valve onto your customer supplied shutoff with the side marked in toward the shutoff 2 Install the supplied fitting to the out side of the solenoid valve Connect the 5 16 I D tubing from the condenser to this fitting 3 Route 3 8 I D vinyl drain tubing to an atmospheri cally v...

Страница 12: ... cooling water outlet located on the top right of the con denser B where boiler fill tube O was attached Route the other end through the cabinet and down the back as shown in Figure 7 4 Cut the 3 8 I D vinyl drain tubing and install the barbed tee Connect the 3 8 I D vinyl tubing from condenser to the barbed tee Push the vinyl tubing all the way onto the tee to assure a leak free seal 5 Route the ...

Страница 13: ...g 3 Cut the 1 4 O D tubing from last step at a con venient point and install the tee from the still adapter kit Catalog No 440376 4 Connect a length of 1 4 O D tubing to the third arm of the tee Connect the 1 4 O D to 3 8 I D adapter to the free end of this length of 1 4 O D tubing Connect the 5 16 I D tubing from the condenser to this adapter 5 Locate boiler fill tube L Connect 7 16 I D vinyl tub...

Страница 14: ...Treated Boiler Feed See Figure 9 Must have optional double solenoid valves Catalog No 440236 240V RY798X2A 120V 1 Install customer supplied shutoff valves onto your tap water source and your in house treated water source Thread the solenoid valves onto your cus tomer supplied shutoffs with the sides marked in toward the shutoffs 2 Install the supplied 5 16 fitting to the out side of the solenoid v...

Страница 15: ...m treated water supply solenoid to the end of the boiler fill tube Route as shown and install clip S to support the tubing 5 Route the 3 8 I D vinyl drain tubing to an atmos pherically vented drain 6 Plug the solenoid valve power cord not shown into the receptacle in control box H See Figure 5 7 Go to the Still Output Connections section on page 16 to complete the setup of your still FEEDWATER CON...

Страница 16: ...the storage bottle parts box Product delivery tube F PTFE Connector E 20 length of 1 2 vinyl tubing Plastic tee 1 2 X 1 2 X 1 2 1 Place storage bottle with product delivery tube F installed inside still cabinet below condenser B Connect product delivery tube to condenser with PTFE connector E 2 Locate plastic tee 1 2 x 1 2 X 1 2 and 20 length of 1 2 vinyl tubing in parts box Connect to bottle over...

Страница 17: ...tem move the still to its final location 1 Locate ACS tube Q and PTFE connector E in the ACS parts box Locate distillate outlet tube TU798X1 in the still parts box Assemble to tub ing from collection system as shown in Figure 11 2 Plug input jack from ACS into ACS receptacle on bottom of still control box H See Figure 5 Figure 11 Complete System Layout Not to scale ...

Страница 18: ...till for 4 5 hours to cleanse itself before collecting water for use 8 To shut your water still off push the OFF switch This will shut the water supply and the heaters off If any difficulties are encountered in operating this water still check all operating and assembly steps to be sure the still was assembled and is being operated correctly If the difficulty still exists consult the Troubleshooti...

Страница 19: ... will have to be restarted by the operator When unit has cooled press the WATER switch and then the OPERATE switch to restore normal operation Check boiler occasionally for proper water level OPERATION Note If you are feeding an ACS with your still note that when the ACS is full it will signal the still to shut down During this shut down the heater and the water supply will both shut off and the f...

Страница 20: ...proximately 260 ml of 10 hydrochloric acid solution into top of constant level chamber K 6 Wait approximately 10 minutes or until residue dis appears If additional cleaning is required drain boiler down 1 inch and turn unit on for a few min utes until residue disappears Do not boil Turn the still off 7 Carefully drain the unit remove clamp from over flow tube and refill with fresh water Drain boil...

Страница 21: ...wed to accumulate as heaters may be damaged Heater Failure Heater failure due to scale build up or alkali attack will not be replaced under warranty Short life on Vycor immersion heaters can usually be attributed to use of water pretreated with NaCI regenerated water softeners or excessive scale buildup Softened water used as a boiler feed causes a concentration of sodium ions and alkaline attack ...

Страница 22: ...ng water flow rate Water Pressure Variations Pressure fluctuations in your tap water line will cause erratic flow in cooling water and may cause water level in boiler to drop Have a plumber install a pressure regulator in your tap water line and regulate to 20 25 psi Output Less Than 1 Liter Hr Heaters will produce in excess of 1 L hr of distilled water when run at the rated voltage At lower volta...

Страница 23: ...itch Heater not boiling heater light on Heater element burnt out Check heater 13 9 Ω for 120V or 55 9Ω for 240V and replace Heater not working Heater element burnt out Replace heater Water will not come on but light works Solenoid valve not working Check plug for connection Replace solenoid valve No lights in switches ACS full still off Indicator lights burnt out This is normal operation when the ...

Страница 24: ...se Solution Will not turn still on or off as it should Float stuck Switch not working Input jack not plugged in Jack board defective Remove level control cover and free up Replace switch Check and reconnect Replace jack board Warning Replace fuses with those of the same type and rating ...

Страница 25: ...Drain T 927326 16 Drain Tubing TU674X1 17 H Electrical Control Box 120V CN798X1A Electrical Control Box 240V CN798X2A F Distillate Outlet Tube Tubing Bottle TU798X2 J Water Operate Off Switches SW745X1A M Vycor Immersion Heater 120V 1000W 740880 M Vycor Immersion Heater 240V 1000W EL798X1B Q Distillate Outlet Tube ACS TU798X1 Not Shown Electrical Control Box PC Board PC798X1A Not Shown Solenoid Va...

Страница 26: ...26 Exploded View ...

Страница 27: ...27 Wiring Diagram ...

Страница 28: ...y When service or replace ment parts are needed we ask that you check first with your dealer If the dealer cannot handle your request then contact our Customer Service Department at 563 556 2241 or 800 553 0039 Prior to returning any materials to Barnstead International please contact our Customer Service Department for a Return Materials Authorization number RMA Material returned without an RMA n...

Страница 29: ...29 ...

Страница 30: ...30 ...

Страница 31: ...31 ...

Страница 32: ...luding use inconsistent with written operating instructions for the product mishandling conta mination overheating modification or alteration of the product by any customer or third party or iii use of replacement parts that are obtained from a party who is not an authorized dealer of BARNSTEAD Heating elements because of their susceptibility to overheating and contamination must be returned to th...

Отзывы: