13
7B
Apply thread sealant to the threads of the NPT to SLIP fi tting that is on the direct burial cable.
Thread and tighten the fi tting into the adapter.
STEP 7: ADAPTER / CONDUIT LAYOUT
7A
Cut drain tile to proper elevation at bottom
of corrugation
• Optional Methods - Miter Saw or Sawzall®
IF EXTENSION IS REQUIRED
TO BRING DRAIN TILE ABOVE
GRADE LEVEL, USE CRANE
PUMPS & SYSTEMS’ DRAIN TILE
EXTENSION KIT P/N: 123510
Step 1.
On riser, trim top side edge at cut zone. The cut
zone is just above the corregation as shown in Fig 1 and
Fig 2.
Step 2.
Measure down from trimmed edge to locate direct
burial cable depth. Depth varies per local codes. Go to the
next corregation valley to achieve depth.
Step 3.
Drill a tap diameter hole using the 59/64“ drill bit
between the corregation valley as shown in Fig. 4.
Fig. 2
Fig. 1
Fig. 3
Содержание EcoTRAN
Страница 10: ...10 STEP 4 SETTING THE BASIN Location Overview...
Страница 11: ...11 STEP 5 RISER TANK PARTS ASSEMBLY...
Страница 30: ...30 11 23 13 12 29 4 15 16 18 17 6 5 7 26 25 32 9 8 2 1 31 17...
Страница 36: ...Notes...