background image

A Crane Co. Company

BARNES

BARNES

®

INSTALLATION and OPERATION MANUAL

Submersible Dry Pit Sewage Ejector

IMPORTANT! 

Read all instructions in this manual before operating pump.

 

As a result of Crane Pumps & Systems, Inc., constant product improvement program,

 

product changes may occur. As such Crane Pumps & Systems reserves the right to 

 

change product without prior written notifi cation.

420 Third Street   

 

83 West Drive, Bramton

Piqua, Ohio 45356 

 

Ontario, Canada L6T 2J6

Phone: (937) 778-8947 

 

Phone: (905) 457-6223

Fax: (937) 773-7157 

 

Fax: (905) 457-2650

www.cranepumps.com

Form No. 103701-Rev. G

Series:  6DSE-L,  1150RPM

Series:  6DSE-L,  1750RPM

CAUTION ! Pumps build up heat and 
pressure during operation-allow time for 
pumps to cool before handling or servicing.

Manual Index

Содержание 6DSE-L Series

Страница 1: ...ccur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canada L6T 2J6 Phone 937 778 89...

Страница 2: ...EXPLODED VIEW Fig 8 9 15 16 PARTS LIST 17 19 RETURNED GOODS POLICY 16 WARRANT 20 START UP REPORT 21 22 WARRANTY REGISTRATION SPECIAL TOOLS AND EQUIPMENT INSULATION TESTER MEGGER DIELECTRIC TESTER SEA...

Страница 3: ...rt fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety dev...

Страница 4: ...equalized reservoir Material Rotating Faces Carbon Stationary Faces Ceramic Elastomer Buna N Hardware 300 series stainless steel CORD ENTRY 25 Ft 7 6m Cord Epoxy sealed housing with secondary pressur...

Страница 5: ...5 inches mm...

Страница 6: ...should be as short as possible Both a check valve and a shut off valve are recommended for each pump being used The check valve is used to prevent back flow into the sump Excessive backflow can cause...

Страница 7: ...urrent amps should be recorded on the start up report D 3 3 Pump Down Test After the pump has been properly wired and lowered into the basin sump or lift station it is advisable to check the system by...

Страница 8: ...pose of properly Refill with see parts list for amount new cooling oil as per Table 1 An air space must remain in the top of the motor housing to compensate for oil expansion see Fig 8 Set unit uprig...

Страница 9: ...remove bear ing 47 from motor shaft using a wheel puller Check rotor for wear If rotor or the stator windings are defective the complete motor must be replaced While disassembled check moisture sensor...

Страница 10: ...lign holes for socket head cap screws 39 Thread socket head cap screws 39 into bearing bracket 21 and tighten Fill seal chamber with oil as outlined in paragraph F 1 3 Reassemble impeller and volute p...

Страница 11: ...2 Yellow or 2 Green and 1 Yellow THREE PHASE 480 600 VOLT AC THREE PHASE 480 600 VOLT AC Power Cable Power Cable Motor Lead Number Motor Lead Number Green 3 Ground Green Black 1 Red 2 White 3 T4 T7 T...

Страница 12: ...e design configuration This number is used for ordering and obtaining information G 3 MODEL NUMBER This designation consists of numbers and letters which rep resent the discharge size series horsepowe...

Страница 13: ...ller for freedom of operation security and condition Clean impeller and inlet of any obstruction 9 Loosen union slightly to allow trapped air to escape Verify that turn off level of switch is set so t...

Страница 14: ...14 FIGURE 7 6DSE L Pump Series...

Страница 15: ...15 FIGURE 8 6DSE L Pump Series...

Страница 16: ...ent To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by...

Страница 17: ...ommet 8 10 12 16HP 1150RPM 10d 1 052262 Grommet 20Hp 1150RPM 60HP 1750RPM 10e 1 Control Cable Not Sold Separately 10f 1 051448 Gland Nut 10g 1 021531 Friction Ring 10h 1 066871 Grommet 10J 1 030169 Gr...

Страница 18: ...TD 060818 Pump End Tungsten Carbide Buna N 060818SC Both Ends Tungsten Carbide Buna N 47 1 051939 Ball Bearing 53 10 029710 Shrink Tube Use two shrink tubes per connector item 12 54 5 030149 Insulator...

Страница 19: ...88TX 11 88 084887TY 12 00 084888TY 11 75 084887TZ 11 88 084888TZ 11 62 084887UA 11 75 084888UA 11 50 8HP 1150 084887UB 11 62 084888UB 11 38 084887UC 11 50 60HP 1750 084888UC 11 25 084887UD 11 38 08488...

Страница 20: ...formance specifications must be in writing and such writing must be signed by our authorized representative Due to inaccuracies in field testing if a conflict arises between the results of field testi...

Страница 21: ...nt To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by t...

Страница 22: ...Notes...

Отзывы: