background image

Manual

2100-549G

Page

47 of 59

CONFIGURING BARD PART #8403-067
CO

2

 CONTROL for ERV MODULATING

CONTROL (Continued)

MOUNTING

1. Push tab on bottom of cover and lift cover from

back plate.

2. Select the mounting location, away from diffusers,

lights or any external influences.

3. Mount transmitter on a vertical surface to a standard

electrical box using the two #6 M2C type screws
provided.

4. Pull wires through sub base hole and make

necessary connections.

5. Reattach cover to base plate.

WIRING

Use maximum 18 AWG wire for wiring to terminals.
Refer to Figures 13-19 for wiring information.

SELECTION OF VOLTAGE OUTPUTS

Prior to wiring, verify the voltage selector jumpers on
jumpers PJ1 and PJ2 are set to voltage (See Figure
below).

Next, move jumper PJ5 to the 0-10V range (See Figure
below).

EDITING MENU PARAMETERS

Before any adjustment can be made to the transmitter,
the Menu Lockout Jumper (PJ4) must be set to the “On”
position (See Figure below).

Finish installing/wiring the control.  Then, refer to
Figure 20 and the building ventilation specifications to
decide what the maximum ventilation rate desired is and
what the minimum/maximum voltage signal is required
for those levels.
Next, enter the control programming stage listed below
once the system is powered-up to configure the control.

VOLTAGE

OUTPUT

C V

0

 

to

 

10

 

V

0

 

to

 

20

 

mA

ENABLED

D

I

SABLED

OFF

MENU

MENU

PJ4

PJ4

OFF

ON

ON

ACCESSING MENU PARAMETERS

Step 1:

To enter the menu structure, press

and

simultaneously for 5 seconds (display

will show RON parameter).

Step 2:

Press             or

to cycle between

menu items.

Step 3:

Press            to edit the value for the
displayed menu item (SET will appear on
display).

Step 4:

Press            or             to adjust the value of
the menu item.

Step 5:

Press            to save the changes (SET will
disappear).

Step 6:

Repeat Steps 2 through 5 for each of the
parameters.

Step 7:

To exit the menu at any time, press and hold

 and

     simultaneously for 5

seconds or wait 10 seconds without pushing
any buttons.

U

V

U

V

U

V

U

V

CURRENT/VOLTAGE OUTPUT

SELECTION JUMPER (PJ1 & PJ2)

OUTPUT RANGE SELECTION JUMPER PJ5

MENU LOCKOUT JUMPER

Содержание I30H1

Страница 1: ...1 I30H1D I36H1D I42H1D I48H1D I60H1D I TEC SERIES PACKAGED HEAT PUMP INSTALLATION INSTRUCTIONS Bard Manufacturing Company Inc Bryan Ohio 43506 Since 1914 Moving ahead just as planned Manual 2100 549G...

Страница 2: ...Unit Side 8 Wall Mounting Bracket Location 9 Bracket Wall Sect View Wood Framed Install 10 Figure 3 Center of Gravity 11 Figure 4 Req Clearances Rec Access 12 Figure 5 Compressor Shipping Bolts 13 Fi...

Страница 3: ...mer Manual N Air Conditioning Low Pressure Low Velocity ACCA Manual D or Duct System Design Manual Q Winter and Summer Air Conditioning FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Condition...

Страница 4: ...ation made according to methods of Air Conditioning Contractors of America ACCA The air duct should be installed in accordance with the Standards of the National Fire Protection Systems of Other Than...

Страница 5: ...ic Coated ID OD Coil CONTROLS X 24V Terminal Block Only w o CompleteStat 1 CompleteStat THO Temp Humidity Occupancy 2 CompleteStat THO w CO2 3 CompleteStat THO w Ethernet 4 CompleteStat THO w CO2 Ethe...

Страница 6: ...A 1 5 1 A 1 0 2 A 1 8 0 2 0 3 2 1 1 2 r o 1 2 r o 1 2 r o 1 2 r o 1 4 3 4 5 9 5 5 8 5 8 0 1 1 0 5 0 6 0 7 0 9 0 9 0 1 1 8 6 6 3 3 2 0 1 0 1 8 8 8 6 5 3 5 3 5 3 9 5 6 2 2 5 2 5 2 5 5 4 5 4 5 4 0 6 0 3...

Страница 7: ...1 5 47 3 46 1 8 With Sides Removed Vent Intake Disconnect Electrical Air Filters Vent Exhaust Door Latch Locking Filters Return Air 2 12 x 20 Door Latch Locking Air Filters 2 Washable Hinges 4 Lift Of...

Страница 8: ...ttempt to do this manually Failure to do so could result in the unit tipping over causing bodily injury and or damage to the unit 7 The top section can be forked from either the RH or LH side See Figu...

Страница 9: ...nches Figure 7C Several construction options are available for unit installation of the IZ Series Serviceability and filter access must be considered before installing See Figure 5D for required clear...

Страница 10: ...l Top Centered on Higher Sill Heights Acheivable With Base Kit Wall Opening Sleeve Mounting Hole Locations FLOOR MOUNTING HOLE CENTERLINES 17 8 56 8 20 6 7 20 2 8 8 29 32 7 1 20 7 8 43 7 42 3 4 Min 94...

Страница 11: ...O O L F T N E V O N n o i s n e m i D X n o i s n e m i D Y n o i s n e m i D Z n o i s n e m i D Z B A 1 H 0 3 I 4 1 4 2 3 4 7 4 C 1 H 0 3 I 4 1 4 2 3 4 7 4 B A 1 H 6 3 I 4 1 4 2 3 4 7 4 C 1 H 6 3 I...

Страница 12: ...FOR LEFT SIDE ACCESS 12 MIN 12 MIN 12 MIN 12 MIN 0 REQUIRED 12 RECOMENDED 0 REQUIRED 12 RECOMENDED CLOSET CONSTRUCTION TOP VIEW LEFT CORNER CONSTRUCTION TOP VIEW RIGHT CORNER CONSTRUCTION TOP VIEW FI...

Страница 13: ...Manual 2100 549G Page 13 of 59 FIGURE 5 COMPRESSOR SHIPPING BOLTS FIGURE 6 REMOVAL OF AIR DUCT COMPRESSOR SHIPPING BOLT COMPRESSOR SHIPPING BOLT CRV ERV AIR DUCT...

Страница 14: ...NDED TO BOTTOM OF ROOF 9 7 MINIMUM OR FIXED CEILING FLOOR OR FIXED CEILING BOTTOM OF ROOF SUSPENDED CEILING 20 MINIMUM 7 9 3 4 UNIT HEIGHT FIELD SUPPLIED DUCT TURNING VANES RECOMMENDED MINIMUM 12 4 MI...

Страница 15: ...ENDED TO BOTTOM OF ROOF 9 10 MINIMUM OR FIXED CEILING 3 RISER FIELD SUPPLIED DUCT TURNING VANES RECOMMENDED 12 MINIMUM 4 MINIMUM FROM TOP OF UNIT TO DUCT BOTTOM MIS 2989 B FLOOR OR FIXED CEILING BOTTO...

Страница 16: ...IXED CEILING 6 RISER 9 8 MINIMUM REQUIRED INSTALLATION HEIGHT BOTTOM OF ROOF FLOOR OR FIXED CEILING SUSPENDED CEILING MINIMUM 20 7 9 3 4 UNIT HEIGHT FIELD SUPPLIED DUCT MIS 2988 B TURNING VANES RECOMM...

Страница 17: ...or a duct supply air system The IPBDF Plenum Box mounts on top of the unit and has both vertically and horizontally adjustable louvers on the front discharge grille When used with a ducted supply an I...

Страница 18: ...it about 12 inches in from the front on both the left and right side are drain holes in the bottom of the base These holes are covered with insulation and are not visible They are located very close t...

Страница 19: ...k bead to Apply liberal amount of caulk to back of flange before installing Use 4 1 1 2 Long Screws to Sleeve Attach Louver Grille to Outer Unit Fan Shroud to Outer Sleeve to Unit Back to Attach Inner...

Страница 20: ...9 INTERIOR FLOOR INSIDE WALL SLEEVE AREA BETWEEN INSULATED WALL AND SLEEVE OUTSIDE WALL SIZE VARIES OUTDOOR GRILLE FILL INSULATION I TEC UNIT INSULATED DRAIN AREA INSULATED WITH 6 BATT MATERIAL MIS 29...

Страница 21: ...information and maximum fuse or HACR Type circuit breaker size Each unit is marked with a Minimum Circuit Ampacity This means that the field wiring used must be sized to carry that amount of current D...

Страница 22: ...e g a t s 3 c i n o r t c e l E e l b a m m a r g o r P n o N e l b a m m a r g o r P l a n o i t n e v n o C r o P H r e v o e g n a h c l a u n a M r o o t u A 7 6 0 3 0 4 8 Y L R D C L 0 4 W 2 T D...

Страница 23: ...Term Strip R 3 SC W1 E A D L O B Y2 Y1 24V G COM W2 Completestat Model CS9B THO or Model CS9BE THO SC SC Thermostat W1 E A YO D L O B Y2 Y1 R G C W2 Bard 8403 060 MIS 3016 1 Additional wire required f...

Страница 24: ...O B Y2 Y1 R G C W2 Bard 8403 060 5 MIS 3017 CRV Wiring Harness 1 Additional wire required for dehumidification models 2 Not needed below 15KW 3 to N C fire alarm circuit if emergency shutdown require...

Страница 25: ...actory installed jumper Remove jumper and connect 4 Connect to G terminal when thermostat has Occupancy Signal Voltage without Occupance Signal is used Install a jumper between G and A only when therm...

Страница 26: ...ed for dehumidification models 2 Not needed below 15KW BROWN WHITE 3 to N C fire alarm circuit if emergency shutdown required Factory installed jumper Remove jumper and connect without Occupance Signa...

Страница 27: ...jumper Remove jumper and connect 4 Connect to G terminal when thermostat has Occupancy Signal without Occupance Signal is used Install a jumper between G and A only when thermostat 1 5 4 5 ERV Wiring...

Страница 28: ...n thermostat has Occupancy Signal C 2 2 ERV Wiring Harness Voltage 1 W2 2 Additional wire required for dehumidification models Bard 8403 067 4 3 MIS 3021 A 4 5 1 to N C fire alarm circuit if emergency...

Страница 29: ...humidification models 4 PURPLE WHITE C G Model CS9B THOC or Term Strip 6 YELLOW BLACK 2 MIS 3270 O B Y1 4 PURPLE 7 2 YELLOW Not needed below 15KW Y0 ORANGE BLACK WHITE RED WHITE L Completestat W1 E G...

Страница 30: ...ing multiple leaks and recharges R 410A refrigerant is close to being an azeotropic blend it behaves like a pure compound or single component refrigerant The remaining refrigerant charge in the system...

Страница 31: ...ng power in such a way as to cause rotation in the reverse direction verification of proper rotation must be made Verification of proper rotation direction is made by observing that suction pressure d...

Страница 32: ...1 heat completes R Y1 circuit pulling in compressor contactor starting compressor and outdoor motor R G also make starting indoor blower motor HEATING STAGE 2 Circuit R Y1 Y2 makes at the thermostat e...

Страница 33: ...P terminals to accelerate the HPC timer and initiate defrost Be careful not to touch any other terminals with the instrument used to short the SPEEDUP terminals It may take up to 15 seconds with the S...

Страница 34: ...electronic thermostat with auxiliary terminal to control the CRV based on daily programmed occupance periods Bard markets and recommends Bard Part 8403 060 programmable electronic thermostat 2 Use Bar...

Страница 35: ...OPTION INTAKE EXHAUST SPEEDS BROWN WHITE BLACK BLUE ORANGE NOM CFM BLACK BLUE WIRE COLOR SPEED RED WIRE WITH WHITE TRACE 300 375 450 525 LO MED LO MED HI HI RED Move brown white wire to corresponding...

Страница 36: ...CRV SPEED CHANGE TERMINAL ACCESS REMOVE 5 SCREWS FROM CRV DOOR TO ACCESS CRV COMPONENTS MIS 3023 CRV INTAKE BLOWER NOTE CRV EXHAUST BLOWER IS BEHIND INTAKE BLOWER BLOWER SPEED CONTROL LOCATION BLOWER...

Страница 37: ...re set levels of ventilation CFM available These are 300 375 450 and 525 CFM of ventilation air This ventilation package is shipped from the factory set on the 375 CFM ventilation level while the Econ...

Страница 38: ...of relay R2 High Ambient Relay FIGURE 23 ECONOMIZER CONTROL CIRCUIT If outdoor temperature is above outdoor thermostat setpoint On call from CompleteStat for first stage cooling YO thermostat signal p...

Страница 39: ...CFM MIS 3271 HEATING MODE OPERATION CompleteStat should never energize YO terminals in conjunction with B so relay R2 will never energize and neither will Economizer Ventilation Speed Y1 and Y2 signal...

Страница 40: ...re freezing of moisture in the heat transfer wheel can occur Consult the factory if this possibility exists The I TEC ERV can be controlled in different ways It can be turned ON OFF with an occupancy...

Страница 41: ...Then perform the following steps 1 Open front swinging doors of main unit by popping front door latches 2 Throw main power disconnect to the OFF position to eliminate risk of injury or death due to el...

Страница 42: ...0 5 9 0 8 0 9 5 1 3 0 2 7 9 0 7 8 1 2 3 3 5 0 2 8 1 3 6 5 1 2 4 1 5 2 3 6 2 0 0 1 8 5 2 2 8 1 4 7 3 7 1 5 4 3 5 8 2 0 2 1 0 6 0 1 2 0 8 4 6 0 8 5 4 1 0 1 1 4 1 1 4 3 4 8 6 7 9 5 7 5 6 4 1 2 0 2 7 9 4...

Страница 43: ...ng blinks for the TEN COUNT of the FLOW RATE INDEX which then is immediately followed by fast blinks which indicate the second digit For example a Flow Index of 23 would be two long blinks followed by...

Страница 44: ...Manual 2100 549G Page 44 of 59 FIGURE 26 VENTILATION AIRFLOW DIAGRAM EXHAUST Return Air Indoor Air VENT Outdoor Air BLOWER BLOWER INTAKE Supply Air VENT SUPPLY BLOWER MIS 3024...

Страница 45: ...Page 45 of 59 FIGURE 27 ERV ACCESS ERV DOOR TO ACCESS ERV COMPONENTS ASSEMBLIES REMOVE 5 SCREWS FROM PANEL LOCATION MIS 3025 ERV CONTROL ERV CASSETTE NOTE ERV EXHAUST BLOWER IS BEHIND INTAKE BLOWER E...

Страница 46: ...equipment damage Make sure all connections are in accordance with the job wiring diagram and in accordance with national and local electrical codes Use copper conductors only Use electrostatic dischar...

Страница 47: ...gure below Finish installing wiring the control Then refer to Figure 20 and the building ventilation specifications to decide what the maximum ventilation rate desired is and what the minimum maximum...

Страница 48: ...2 low output range Sets the CO2 concentration for the lowest output 4 mA or 0 VDC Low limit 0 PPM Factory setting 0 PPM High limit 2000 5000 PPM depending on model COH CO2 high output range Sets the C...

Страница 49: ...to remove oils grease tars and dirt that can impede performance or generate odors Washing of the desiccant surfaces is required to remove contaminate buildups that can reduce adsorption of water mole...

Страница 50: ...based cleaners aromatic solvents temperatures in excess of 170 F or steam Damage to the wheel may result Do not disassemble and immerse the entire heat wheel in a soaking solution as bearing and othe...

Страница 51: ...n a r t e h t e g a t l o v t i n u e v a h t o n s e o d r e h t i e t i n u e h T l a n g i s t u p t u o r o s s e r p m o C r o f k c e h C 0 1 C C C n e e w t e b C A s t l o v 4 2 e r e h t s I...

Страница 52: ...5 5 0 4 6 3 5 1 5 0 2 5 4 1 5 0 5 8 2 0 9 4 0 9 5 4 1 0 0 2 6 4 5 5 8 4 4 4 5 5 3 4 5 9 2 2 4 7 7 0 1 4 8 9 8 9 3 7 5 7 8 3 2 5 6 7 3 3 8 5 6 3 8 4 5 5 3 5 4 5 4 3 4 7 5 3 3 4 3 6 2 3 3 2 7 1 3 0 4 8...

Страница 53: ...it is tight on the motor shaft Also ensure the motor is secure in its mounting system and the mounting system is secure to the unit c The Bard I TEC is equipped with a low ambient control pressure swi...

Страница 54: ...RODUCT WARRANTIES AND MAY PRODUCE UNEXPECTED RESULTS Always mount the replacement motor and control according to the manufacturers specifications using all required hardware to reduce vibration Make s...

Страница 55: ...ne if it s air noise cabinet duct or motor noise interview customer if necessary Air noise High static creating high blower speed Is airflow set properly Does removing filter cause blower to slow down...

Страница 56: ...er to the manufacturer s authorized replacement list USING THE WRONG CONTROL WILL RESULT IN IMPROPER OR NO BLOWER OPERATION Orient the control module so that the 3 wire motor plug can be inserted into...

Страница 57: ...CTOR MOTOR HALF R O T C E N N O C R E W O P R E D A E H B W P 0 5 4 9 0 5 3 1 P M A N I P n o i t p i r c s e D 1 r o f 2 n i P o t 1 n i P r e p m u J t u p n I e n i L C A V 0 2 1 y l n O 2 3 d n u...

Страница 58: ...i H 5 2 1 3 0 2 6 2 1 5 2 2 7 2 1 8 4 2 8 2 1 1 7 2 9 2 1 3 9 2 9 2 1 6 1 3 0 3 1 9 3 3 1 3 1 1 6 3 2 3 1 4 8 3 4 3 1 1 1 4 5 3 1 7 3 4 6 3 1 4 6 4 8 3 1 1 9 4 9 3 1 7 1 5 0 4 1 4 4 5 B D 0 8 B W 7 6...

Страница 59: ...2 1 3 8 1 0 3 1 5 0 2 1 3 1 6 2 2 2 3 1 8 4 2 3 3 1 9 6 2 3 3 1 1 9 2 4 3 1 3 1 3 5 3 1 4 3 3 6 3 1 6 5 3 7 3 1 1 8 3 9 3 1 7 0 4 0 4 1 2 3 4 2 4 1 8 5 4 3 4 1 4 8 4 4 4 1 9 0 5 B D 0 8 B W 7 6 e d i...

Отзывы: