manualshive.com logo in svg
background image

Содержание CritiCore 000002

Страница 1: ...Bard CritiCore Monitor Service Manual Model Number 000002 Issued June 1 1997 Pl 3336 BANA C R Bard Inc Covington GA 30014...

Страница 2: ...nction with the Bard CritiCore Monitor Operators Manual Be sure to read these Manuais and become familiar with their contents before attempting to disassemble or repair the Bard CritiCore Monitor Plea...

Страница 3: ...een Details of Electrical Operation Fluid Output Electronics Temperature Measurement Electronics Microcontroller Details Display Electronics Keyboard Electronics Power Management sie Electronic Testin...

Страница 4: ......

Страница 5: ...ade by either Bard or the CBET use the Functional Checkout procedure to verify correct operation before returning the Bard CritiCore Monitor for general use 5 Electronic Testing and Calibration Proced...

Страница 6: ...ported problem Was ihe Monitor used on a patient when the problem occurred Paiient status and type of intervention required if applicable If you are advised to return the Monitor to a Bard designated...

Страница 7: ...r at the fluid air interface The transducer also functions as receiver detecting the return of the transmitted burst The microcontroller within the CritiCore Monitor will measure the time the energy b...

Страница 8: ...in which the Bard Urotrack Model 210 Monitor communicates its data Flow rate and container volume are transmitted in this mode 220 Emulation mode Emulates the manner in which the Bard Urotrack Model...

Страница 9: ...Figure 3 CritiCore Monitor with CCM Installed Bard CritiCore Monitor Service Manual Page 6...

Страница 10: ......

Страница 11: ...er and the silicone rubber transducer cap located at the bottom of the cavity Note Use a soft non abrasive cloth dampened with warm water and mild detergent alcohol or a non staining disinfectant 4 Op...

Страница 12: ...emperature window displays and that the Check Probe status indicator is lit System Clock 1 Tur the SET VALUE rotary switch on the rear control panel to the HOUR position Verify that the hour segment P...

Страница 13: ...d the surface of the water is steady The Monitor should read approximately 100 ML in the Present Interval Output display 8 Press the Container Volume switch The display should read approximately 100 m...

Страница 14: ...rm stops beeping 5 Press the Container Volume switch and verify that the Container Volume displayed is less than 2000ml and is not flashing High Temperature Alarm Before performing this procedure remo...

Страница 15: ...on ihe membrane switch to set the alarm limit to 99 0 F 4 Tum the SET VALUE rotary switch to the NORMAL OPERATION position 5 insert a 98 6 F calibration plug Verify that the Low Alarm status indicato...

Страница 16: ...ing through a sequence of decimal and hexadecimal numbers letters Once in T mode the cycle will continue regardless of any toggle or rotary switch settings This allows the technician to verify that al...

Страница 17: ...CritiCore Monitor Short Battery Life Troubleshooting Flow Chart Monitor is draining the batteries prematurely Y Test current consumption page 47 Current consumption OK No Replace Main Circuit Board Y...

Страница 18: ...SENSPWR signal Tilt Sensor Troubleshooting Flow Chart page 47 Does SENSPWR signal check out OK No Replace Main Circuit Board Yes Test the Tilt Sensor page 55 Does Tilt Sensor Lightly tap on Tilt Sens...

Страница 19: ...the container is not vibrating Transducer cap is clean Phototransistor is clean Test the Display LCD page 29 Does LCD check out OK No Replace LCD page 47 Does SENSPWR signal check out OK No Yes Test...

Страница 20: ...ck out OK No Replace LCD Problem solved Yes connector page 27 Does Temperature Jack connector check out OK No Repiace Jack connector Yes Test temperature accuracy page 8 Re calibrate temperature on ma...

Страница 21: ...ator is not lit Check Container indicator is not lit Transducer cap is clean Does STRTXM signa check out OK N Replace Main Circuit o Board Yes y Test the Transducer signal page 50 _ Test the Display L...

Страница 22: ...3 0V r Test fuse on Main Circuit Board page 48 Does fuse check out OK No Replace fuse Yes y Test Power Modules page 46 Do Power Modules check out OK Yes Does problem persist No Problem solved No Repl...

Страница 23: ...9 Does LCD check out OK No Replace LCD Yes Test for Tilt Sensor failure page 10 Test for Container Sensor failure page 8 o Test for Temperature Measurement failure page 8 4 Test for Volume Measurement...

Страница 24: ......

Страница 25: ...the magnets are missing or damaged they must be replaced See the Attraction Plates and Magnets section on page 40 for magnet replacement procedure 1 Place a disposable container into the Monitor 2 _L...

Страница 26: ......

Страница 27: ...3 8 Phillips pan head screws as illustrated in Figures 9 and 10 arrows indicate screw locations Close the rear panel door 8 Pull straight up on the rear enclosure see Figure 11 to separate it from the...

Страница 28: ...ey were in when they were removed 8 Perform the Functional Checkout procedure see page 7 to ensure that alt display and general Monitor functions are working properly Bezel Top The bezel top is the ou...

Страница 29: ...ver Needle nose pliers Caution The Bard CritiCore Monitor main and display PCB s contain static sensitive electronic devices Do not attempt to repair any internal components without proper ESD Electro...

Страница 30: ...p procedure on page 22 2 Use an ohmmeter to check the resistance between each of the contact pins and the common pin per Figure 17 In Figure 17 the left most contact pin 1 is the common line with the...

Страница 31: ...ns the LCD which is easily scratched Be sure to handle this assembly with care 4 Remove and discard the 4 panel seal strips located on the underside of the membrane switch see Figure 20 5 Turn the bez...

Страница 32: ...connections with the LCD The display PCB also contains a temperature jack and a phototransistor The temperature jack provides an insertion site for a temperature probe utilizing a mono phone plug The...

Страница 33: ...ng the Temperature Equipment Required Jack Connector e No 1 Phillips screwdriver No 2 Phillips screwdriver Small standard screwdriver Needle nose pliers e Desoldering tools Caution The Bard CritiCore...

Страница 34: ...temperature jack as supplied by Bard Be sure to position the connector edge with the edge of the PCB and within the silk screen lines on the display PCB see Figure 26 2 Using a non abrasive cloth dam...

Страница 35: ...e replaced If it is suspected that a segment or status indicator is not being displayed properly it will be necessary to determine if the problem is the LCD or another component of the Monitor See the...

Страница 36: ...turn the Monitor to Bard for service Figure 30 Removing the Liquid Equipment Required 1 Crystal Display LCD No 2 Phillips head screwdriver i No 1 Phillips head screwdriver Small standard screwdriver N...

Страница 37: ...wdriver No 1 Phillips head screwdriver Needle nose pliers Caution The Bard CritiCore Monitor main and display PCB s contain static sensitive electronic devices Do not attempt to repair any internal co...

Страница 38: ...es and then the remaining five 5 holes excluding the hole directly under the display cable 12 Place the 2 nylon washer and 2 56 hex nut onto each screw and tighten Tighten to approximately 2 5 in lbs...

Страница 39: ...en the arm cap and the arm as illustrated in Figure 43 2 Remove the shoulder screw to separate the arm from the enclosure as in Figure 44 Note There are two shoulder screw configurations slotted head...

Страница 40: ...e arms hanging down the hook s openings should face towards the front of the Monitor see left Monitor in Figure 42 3 Reattach the hook to the arm by inserting the dowel pin through the hook and arm in...

Страница 41: ...lease it from the front enclosure Installing the Handle Equipment Required Standard screwdriver 3 8 socket and driver Procedure Note Before installing the handle ensure that the molded plastic steps a...

Страница 42: ...Assembly The front enclosure assembly contains the front enclosure handle arms and select hardware Attached to the front enclosure are the plastic retainers and attraction plates The plastic retainer...

Страница 43: ...ed in Figure 54 4 Remove the four 4 6 32x3 16 Phillips pan head screws which secure the main PCB to the front enclosure see Figure 55 Lift up and remove the main PCB Installing the Front Equipment Req...

Страница 44: ...ecess 2 Place a small amount of Loctite 454 into the attraction plate recess Immediately place the replacement attraction plate into place adhere to either side of the plate Be sure to wipe away exces...

Отзывы: