4. Components of a X8 Rental Tile
4.1
X8 Rental Frame
Introduction X8 Rental Frame
The X8 rental frame is made out of aluminium pro
fi
les and stainless steel to reduce weight without losing strength. This strong frame
allows you to build X8 LED-walls up to 3 frames high stacked or 13 tiles high trussed. The front of the X8 rental frame has a grid
where X8 modules
fi
t in forming 3 rows of 3 modules in a chain.
The top and the left side, seen form the rear of the X8 rental frame, is equipped with two solid locking mechanisms operated with a
fi
xed rugged handle, no tools required. These locking mechanisms ensure a fast and secure attachment between the neighboring
tiles. Next to this primary locking mechanism a second locking mechanism is installed for security reasons. Also no tools required
to operate the security clamps.
All sides of the X8 rental frame are provided with small positioning cones and planes to ensure a precise positioning between the
tiles. It’s important to keep those cones and planes clean, otherwise seams will be visible after installation of the rental frame into
the LED-wall.
Parts location of the X8 rental frame
2
2
7
7
5
7
2
1
8
6
3
4
Image 4-2
X8 Rental Frame.
1
Vertical locking pins.
2
Security clamps (second locking) two vertical and one horizontal.
3
Retractable side locking pins.
4
Handle to retract the side locking pin.
5
Removable mounting plate for the X8 Connection Box.
6
Rugged handle for operating vertical primary locking mechanism.
7
Hooks for security clamps.
8
Rugged handle for operating side primary locking mechanism.
18
R5905160 X8 RENTAL DISPLAY 25/02/2013
Содержание X8
Страница 1: ...X8 Rental Display Installation manual R5905160 03 25 02 2013 ...
Страница 14: ...1 Safety 10 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Страница 42: ...6 Setup process of a X8 rental display 38 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Страница 56: ...7 Basic setup procedures 52 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Страница 62: ...8 Cabling of the X8 display 58 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Страница 63: ...9 Maintenance 9 MAINTENANCE Overview Cleaning the X8 display R5905160 X8 RENTAL DISPLAY 25 02 2013 59 ...
Страница 82: ...A Dimensions 78 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Страница 86: ...B Specifications 82 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Страница 87: ...C Order info C ORDER INFO Overview Spare part order info R5905160 X8 RENTAL DISPLAY 25 02 2013 83 ...
Страница 94: ...D Product Green Compliance 90 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...