time.
A..
E
Operator manipulations.
1..8
Different process stages.
Stage description:
Stage 1 :
Projector is
switched off
. Local Keypad is not active. The projector status light (PS) and the laser
status light (LS) are off.
Stage 2 :
Cinema Controller of the projector is
booting
. This process starts as soon as the power switch is
switched on (reference A Image 6-1). This process takes several seconds and during this process the
backlight of the Standby button is blinking blue. The projector status light is blinking green (in normal
condition, no errors and no warnings). The laser status light remains off.
Stage 3 :
Projector is in
Standby
mode. The Cinema Controller is up and running. Only the Standby button
and Light button on the Local Keypad are active: The backlight of both buttons is white. The projector status
light is blinking green (in normal condition, no errors and no warnings). The laser status light remains off.
Stage 4 : Initialization
and
PRECONDITIONING
. These two processes start simultaneous as soon as the
Standby button is pressed for 3 seconds when the projector is in Standby mode (reference B Image 6-1).
The initialization of all electronic boards takes approximately two minutes and during this process the backlight
of the Standby button is blinking green. The projector status light remains blinking green (in normal condition,
no errors and no warnings). The laser status light remains off. Note that the projector always boots up in the
same mode (E.g. Standby or Operation) as it was switched off.
The PRECONDITIONING process verifies if it's safe to turn on the pump of the cooling circuit and to extract
humidity from the sealed compartments without having the risk of condensation. The temperature inside the
sealed compartments is kept on ambient level. Following sub-stages take place during PRECONDITIONING:
Stage 4.1 :
Checking ambient and internal conditions.
Stage 4.2 :
Turning pump on. Reaching liquid flow target.
Stage 4.3 :
Flow target reached. Conditioning humidity in the projector.
Stage 4.4 :
Cooling started.
Stage 4.5 :
Reaching liquid temperature target.
Depending on the environmental circumstances (temperature and humidity) the PRECONDITIONING process
will reach its target before (reference P Image 6-1) or after (reference P' Image 6-1) the initialization process is
completed. In optimal circumstances it will be before.
Stage 5 :
Projector is
Operational
and
PRECONDITIONED
. All electronic boards are up and running. All
buttons on the Local Keypad are active. The backlight of the Standby button is green while the backlight of the
Light button is white. The projector status light is continuous green (in normal condition, no errors and no
warnings). The laser status light remains off.
In PRECONDITIONED mode the chillers are operational and the heat dissipation of the DMDs is under
control. Heat dissipated by the active formatter boards is removed. Ingesting of content, creating playlist, etc.
is already possible on the ICMP. Also the creation of macros etc. is possible if that is feasible without
projecting an image (lasers are not active).
Stage 6 :
Projector is
Operational
and in
CONDITIONING
mode. This process starts as soon as the Light
button is pressed for 3 seconds (reference C Image 6-1). The laser status light on the top of the projector
flashes a few times and then lights up continuously white. The sealed compartments are cooling down from
ambient to operating temperature and humidity is extracted. The conditioning process takes approximately 3
to 15 minutes (depends on the environmental conditions). Following sub-stages take place during
CONDITIONING:
Stage 6.1 :
Checking ambient and internal conditions.
Stage 6.2 :
Turning pump on. Reaching liquid flow target.
Stage 6.3 :
Flow target reached. Conditioning humidity in the projector.
Stage 6.4 :
Cooling started.
Stage 6.5 :
Reaching liquid temperature target.
During CONDITIONING the backlight of the Light button is blinking green. The projector status light is
continuous green (in normal condition, no errors and no warnings).
Содержание Thor Series
Страница 1: ...ENABLING BRIGHT OUTCOMES User manual Thor series...
Страница 2: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com en support www barco com...
Страница 28: ...R5906787 04 Thor series 28 Lenses Lens selection...
Страница 38: ...R5906787 04 Thor series 38 ICMP X HDMI 2 0 specifications ICMP HDMI 1 4 specifications ICMP X reset ICMP X...
Страница 74: ...R5906787 04 Thor series 74 Starting up...
Страница 90: ...R5906787 04 Thor series 90 Environmental information...
Страница 94: ...Glossary R5906787 04 Thor series 94...
Страница 98: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com R5906787 04 2019 10 23...