4. Physical installation
4.1
Installation of the support structure
C
AUTION
:
Follow the important Safety Guidelines.
What has to be done ?
The complete support structure has to be assembled and installed in its
fi
nal position.
Screen supporting/securing structures vary from system to system. Consult Barco for advise on professional
rigging organizations.
Calibration tools for the TF-10 mounting plates.
Barco provides mounting plates for the TF-10 tiles which has to be attached to the support structure. To align the mounting plates
correctly, the use of calibration tools is recommended. Barco provides this calibration tool to align the mounting plates in a vertical
direction and horizontal direction.
A
B
C
Image 4-1
A
Small mounting plate.
B
Big mounting plate.
28
R59770682 FIXED TF-10 DISPLAY 23/11/2011
Содержание TF-10
Страница 1: ...Fixed TF 10 display Installation Manual R59770682 02 23 11 2011 ...
Страница 4: ......
Страница 6: ...Table of contents 2 R59770682 FIXED TF 10 DISPLAY 23 11 2011 ...
Страница 12: ...1 Safety 8 R59770682 FIXED TF 10 DISPLAY 23 11 2011 ...
Страница 21: ...3 Components of a fixed TF 10 display Image 3 7 Image 3 8 R59770682 FIXED TF 10 DISPLAY 23 11 2011 17 ...
Страница 30: ...3 Components of a fixed TF 10 display 26 R59770682 FIXED TF 10 DISPLAY 23 11 2011 ...
Страница 40: ...4 Physical installation 36 R59770682 FIXED TF 10 DISPLAY 23 11 2011 ...
Страница 46: ...5 Cabling of an TF 10 display 42 R59770682 FIXED TF 10 DISPLAY 23 11 2011 ...
Страница 56: ...7 Specifications 52 R59770682 FIXED TF 10 DISPLAY 23 11 2011 ...