The setup process below describes roughly the installation stages to follow to install the SP-20 sports perimeter. Several stages
refer to one or more detailed and illustrated procedures which are also described in this chapter.
W
ARNING
:
Safety
fi
rst. Fence off the installation area before starting to install the SP-20 tiles. Ensure you
read, understand and follow all safety instructions mentioned in the chapter "Safety", of this installation man-
ual. Furthermore, be sure that all installation requirements for the SP-20 display are ful
fi
lled, see "Installation
Setup process
1.
The
fi
rst stage in this process is the preparation of the SP-20 tiles. Note that the SP-20 tiles are stored 3 (three) or 1 (one) in a
package. So
fi
rst remove the SP-20 tiles from their package and roughly put then in place.
For more information about the available packages, see "SP-20 package", page 19.
2.
The second stage includes folding out the foot system into the desired tilt angle and positioning them next to the previous tile
inside the SP-20 sports perimeter.
For more information about this procedure, see "Proper and safe use of the foot system", page 25.
3.
The following stage describes how to connect one SP-20 tile to a neighboring tile.
For detailed information, see "Securing SP-20 tiles", page 34.
4.
If used, the next stage is to provide soft covers to the sides of the SP-20 tiles that are used in a gateway.
For detailed information, see "Installing soft covers on gateways", page 36.
5.
The next stage in this process is the power and data cabling of the SP-20 tiles.
For detailed cabling instructions, see "Cabling ", page 39.
6.
The following stage is the installation of the power box(es). Follow the installation guidelines in the manual of the used power
box.
7.
The next stage is the Installation of the digitizer and, if required, the
fi
ber link receiver or compact link and/or AEC. Follow the
installation guidelines in the manuals of these products.
8.
The
fi
nal stage is the Installation of the control software for the SP-20 display. See installation procedure described in the
manual of the control software.
Overview
•
•
Installing soft covers on gateways
R59770294 SP-20 11/02/2009
33
Содержание SP-20
Страница 1: ...SP 20 Installation manual R59770294 02 11 02 2009 ...
Страница 4: ......
Страница 6: ...Table of contents 2 R59770294 SP 20 11 02 2009 ...
Страница 33: ...4 Proper and safe use of the foot system 1 2 Image 4 5 R59770294 SP 20 11 02 2009 29 ...
Страница 35: ...4 Proper and safe use of the foot system 1 CLICK 2 Image 4 7 R59770294 SP 20 11 02 2009 31 ...
Страница 36: ...4 Proper and safe use of the foot system 32 R59770294 SP 20 11 02 2009 ...
Страница 39: ...5 Physical installation 1 2 3 4 Image 5 2 R59770294 SP 20 11 02 2009 35 ...
Страница 41: ...5 Physical installation Image 5 5 R59770294 SP 20 11 02 2009 37 ...
Страница 42: ...5 Physical installation 38 R59770294 SP 20 11 02 2009 ...
Страница 46: ...6 Cabling 42 R59770294 SP 20 11 02 2009 ...
Страница 47: ...7 Maintenance 7 MAINTENANCE Overview Cleaning SP 20 tiles R59770294 SP 20 11 02 2009 43 ...
Страница 49: ...8 Order info 8 ORDER INFO Overview Order info R59770294 SP 20 11 02 2009 45 ...
Страница 51: ...A Dimensions A DIMENSIONS Overview Dimensions of the SP 20 tile R59770294 SP 20 11 02 2009 47 ...