4. Physical installation
4.1
Installation of the support structure
C
AUTION
:
Follow the important Safety Guidelines.
What has to be done ?
The complete support structure has to be assembled and installed in its final position.
Screen supporting/securing structures vary from system to system. Consult Barco for advise on professional
rigging organizations.
Calibration tools for the SLite mounting plates.
BARCO provides mounting plates for the SLite tiles which has to be attached to the support structure. To align the mounting plates
correctly, the use of calibration tools is recommended. BARCO provides two different calibration tools. One to align the mounting
plates in a vertical direction and one to align in a horizontal direction.
A
B
C
Image 4-1
A
SLite mounting plate.
B
Calibration tool for vertical alignment of the SLite mounting plates.
C Calibration tool for horizontal alignment of the SLite mounting plates.
22
R5976575 FIXED SLITE DISPLAY 08/03/2006
Содержание SLite 10
Страница 1: ...Fixed SLite display Installation Manual R5976575 04 08 03 2006 ...
Страница 4: ......
Страница 6: ...Table of contents 2 R5976575 FIXED SLITE DISPLAY 08 03 2006 ...
Страница 16: ...2 Installation requirements 12 R5976575 FIXED SLITE DISPLAY 08 03 2006 ...
Страница 24: ...3 Components of a fixed SLite display 20 R5976575 FIXED SLITE DISPLAY 08 03 2006 ...
Страница 44: ...7 Servicing Image 7 5 40 R5976575 FIXED SLITE DISPLAY 08 03 2006 ...
Страница 48: ...7 Servicing 44 R5976575 FIXED SLITE DISPLAY 08 03 2006 ...
Страница 54: ...A Specifications 50 R5976575 FIXED SLITE DISPLAY 08 03 2006 ...
Страница 55: ...B Order info B ORDER INFO Overview Order info R5976575 FIXED SLITE DISPLAY 08 03 2006 51 ...