R5906897 /02
Prometheus III
161
Max
Min
1
2
Image 13-9: Cooling liquid refill
1
Max level
2
Min level
3.
Fill the reservoir with cooling liquid until the level is equal with the
Max
indication on the reservoir.
4.
Close the reservoir again. Turn the filler cap clockwise to close the reservoir.
5.
Reinstall the side cover.
CAUTION:
Never fill above
Max
level mark !
13.10 Authorization to clear security warning on
the projector
When is an authorization required to clear the security warning?
If a module has been removed or if the sealed compartment has been opened, an authorization will be
required to clear the security warning.
Required tools
•
Security key (Dallas iButton®).
•
Authorization pin code.
Authorization procedure to clear security warning
1.
Ensure that all modules are properly installed.
2.
Start up the projector (standby mode).
3.
Initiate authorization by holding the security key in the security socket D..
Содержание Prometheus III
Страница 1: ...ENABLING BRIGHT OUTCOMES Installation manual Prometheus III...
Страница 8: ...R5906897 02 Prometheus III 8...
Страница 32: ...R5906897 02 Prometheus III 32 Installation process...
Страница 62: ...R5906897 02 Prometheus III 62 Physical installation stand alone cooler...
Страница 80: ...R5906897 02 Prometheus III 80 Lenses lens holder...
Страница 98: ...R5906897 02 Prometheus III 98 Input communication...
Страница 100: ...R5906897 02 Prometheus III 100 Installing a HDD into the ICMP ICMP...
Страница 132: ...R5906897 02 Prometheus III 132 Communicator Touch Panel...
Страница 148: ...R5906897 02 Prometheus III 148 Removal and installation of the projector covers...
Страница 152: ...R5906897 02 Prometheus III 152 Preventative maintenance actions...
Страница 170: ...R5906897 02 Prometheus III 170 Convergence...
Страница 176: ...R5906897 02 Prometheus III 176 Color calibration...
Страница 199: ...R5906897 02 Prometheus III 199 Environmental Information...