4. Additional fixation facilities of systems employed with earthquake protection
OverView D 50" – DOC-3303-5 – installation manual – Revision 10 – September 2006
September 2006
September 2006
September 2006 ________________________________
________________________________
________________________________
_________________________________________________________
_________________________
_________________________
_________________________ 12
4.1.2
Fixation of the screen frame
After the screen has been aligned, the screen frame is additionally fixed to the left and right vertical profile of
the dark box by means of a screw M6x55 DIN 912 with washer. Look at the big picture and the detailed view to
see where the additional screws are installed. Of course it is the same for the left vertical profile (seen from
behind).
screw
washer
Содержание OVERVIEW D 50"
Страница 1: ...Installation manual OVERVIEW D 50...