R5912083 /01
ICP-D
10
1.2 Installation requirements
Environment conditions
The requirements for the physical environment in which the ICP-D may be safely operated or stored are the
same as these for the projector. See user and installation manual of the projector for details.
CAUTION:
Let the ICP-D acclimate to the ambient temperature after unpacking. Ensure that the
humidity is within the specification of the projector (between 5% and 85% RH Non-condensed)
Neglecting this may result in startup failure of the device.
CAUTION:
Wear a wrist band which is connected to the ground while handling the ICP-D.
Software requirement
The version of the software packages indicated in the following table are the minimum required version.
Always refer to the product release notes to be sure to install the correct version.
Software requirements
Series 4 projectors Series 2 projectors
Projector software package
1.3.1
Depending on the projector type:
•
version 2.10.x or higher
for B and C series
•
version 2.10.x or higher
for BLP and CLP series
•
version 1.16.x or higher
for S and E series
ICP-D software
1.2.0.3 (*)
1.2.0.3
ICMP clone package (**)
NA
2.8.1
Barco Communicator software
NA
5.15 or higher
(*) included in the projector software package.
(**) ICMP clone package are require during installation to replace DVI macros/input files by HDMI ones.
Ensure to use the appropriate clone package and corresponding projector software package.
License
On Series 4 projectors, a license based on the projector serial number and the brand of the IMB is needed.
This means a new license is required in case you change projector or IMB brand.
On Series 2 projectors, no license is needed in order to use ICP-D together with an third party IMB.
Supported IMBs from ICP-D software version 1.2.0.5 (included in the Series 4 software 1.4.0) onwards:
•
Dolby ShowVault/IMB: From software version 2.8.25 onward
•
Dolby IMS3000: From software version 3.3.26 onward
•
Dolby IMS2000: From software version 2.8.25 onward
•
GDC SX4000: From software version 10.00 (build 103) onward
•
GDC SR1000: From software version 17.20 (build 201) onward
•
QSC CMS-5000: From software version 1.1.01818+ onward
•
Qube Xi: From software version 3.0.1.40 onward
This list is subject to change. Please contact Barco service to obtain the updated list of supported
IMB brands (models, minimum software version, etc).
Contact the supplier of your IMB to acquire a valid license.
Grace period
Series 4 projectors equipped with an ICP-D are delivered from the factory with a grace period of 200 hours.
This means that the projector can be used (in
“
On
”
mode) with a third party IMB for 200hrs. During this period
the projector trigger a
Warning
(orange notification) with the time remaining in the description. The projector
will go into
Error
status (red notification) if no valid license is installed within the specified timeframe. In this
case the media server can no longer be selected.
Содержание ICP-D
Страница 1: ...ENABLING BRIGHT OUTCOMES Installation manual ICP D...
Страница 6: ...R5912083 01 ICP D 6...
Страница 18: ...R5912083 01 ICP D 18 ICP D functionality...
Страница 38: ...R5912083 01 ICP D 38 ICP D installation...
Страница 39: ...39 R5912083 01 ICP D A 1 ICP D HDMI 2 0 specifications 40 Technical specifications A...
Страница 44: ...R5912083 01 ICP D 44 Technical specifications...
Страница 48: ...R5912083 01 ICP D 48 Republic of Turkey In conformity with the WEEE Regulation Environmental information...
Страница 50: ...R5912083 01 ICP D 50 Environmental information...
Страница 52: ...R5912083 01 ICP D 52 Glossary...
Страница 53: ......
Страница 54: ...www barco com R5912083 01 2021 01 26...