5. ICMP service procedure
Image 5-21
10.And
fi
nally, strike out the old insertion date on the cover and write the new one (MM/YY) on the empty
location.
Image 5-22
5.6
RAID controller replacement
W
ARNING
:
Power down the projector and let it cool down before starting the installation
procedure. You will
fi
nd in the installation manuals of each projector the way to switch
off your installation.
C
AUTION
:
Wear a wrist band which is connected to the ground while handling the elec-
trostatic discharge sensitive parts.
No content is lost, and no new certi
fi
cate (KDM) is needed during this procedure.
R5906594 ICMP 09/11/2016
79
Содержание ICMP
Страница 1: ...ICMP Service Manual DP Alchemy R5906594 05 09 11 2016 ...
Страница 4: ......
Страница 6: ...Table of contents 2 R5906594 ICMP 09 11 2016 ...
Страница 18: ...2 General 14 R5906594 ICMP 09 11 2016 ...
Страница 20: ...3 Preventative maintenance actions 16 R5906594 ICMP 09 11 2016 ...
Страница 70: ...4 Troubleshooting 66 R5906594 ICMP 09 11 2016 ...
Страница 88: ...5 ICMP service procedure 84 R5906594 ICMP 09 11 2016 ...