3. Display installation
4
1
2
3
Image 3-6
3.5
Nexxis OR
Overview
Connecting your MDSC-2326 to Barco’s Nexxis OR system allows you to distribute video, graphics, audio
and computer data over the IP network, in raw uncompressed format, inside the operating room and even
between surgical suites.
To connect your MDSC-2326 to Barco’s Nexxis OR system, connect the 10Gb Ethernet interface to your
Nexxis switch. More info about Nexxis OR and how to con
fi
gure the MDSC-2326 in your network is avail-
able in the dedicated user guides. Please visit
www.barco.com
to obtain these user guides.
Nexxis OR is only available on the MDSC-2326 MNAH version.
3.6
Power supply connection
To connect the power supply
1. Connect the supplied external DC power supply unit to the +24 VDC power input of your display.
2. Plug the other end of the external DC power supply into a
grounded
power outlet by means of the
proper power cord delivered in the packaging.
Image 3-7
C
AUTION
:
To avoid risk of electric shock, the external DC power supply must be con-
nected to a mains with protective earth. The ground connection on the display’s DC
power input connector has no protective earth function. The MDSC-2326 display pro-
tective earth connection is provided via a dedicate pin (see next steps).
K5902135 (451920612562) MDSC-2326 01/12/2017
19
Содержание High Bright MDSC-2326 DDIH
Страница 1: ...MDSC 2326 User Guide MDSC 2326 DDIH MDSC 2326 MNAH K5902135 451920612562 01 01 12 2017...
Страница 16: ...2 Product overview 14 K5902135 451920612562 MDSC 2326 01 12 2017...
Страница 24: ...3 Display installation 22 K5902135 451920612562 MDSC 2326 01 12 2017...
Страница 34: ...4 Daily operation 32 K5902135 451920612562 MDSC 2326 01 12 2017...
Страница 52: ...5 Advanced operation 50 K5902135 451920612562 MDSC 2326 01 12 2017...