Initial inspection
General
Before shipment, the E2 was inspected and found to be free of mechanical and electrical defects. As soon as the E2 is unpacked,
inspect for any damage that may have occurred in transit. Save all packing material until the inspection is completed. If damage is
found,
fi
le claim with carrier immediately. The Barco Sales and the Service of
fi
ce should be noti
fi
ed as soon as possible.
Unpacking
At delivery the E2 is packed in a shipping case. Place the shipping case on a stable (solid),
fl
at and insulated support during all
the unpacking. Open the case from the top. Remove the E2 that is packaged in an antistatic bag. Check the box content after
unpacking.
After unpacking let the E2 acclimate to the room temperature which must be higher than 0°C (32°F) and lower
than 40°C (104°F). Neglecting this may result in startup failure of the device.
Save the original shipping case and packing material, these will be necessary if you ever have to ship your
E2. For maximum protection, repack your E2 as it was originally packed at the factory.
Box content
After unpacking the E2 it is recommended to check if all of the following items were included:
Product
Contains
Accessories included
R9004698
•
4RU rack mount chassis
•
2x 14-9750004-90
•
2x B1959864
•
2x B1959865
•
2x B1959860
•
2x 09-0106032-91
•
8x 13-0081012-90
•
2x 09-0106031-90
•
B561132
•
R5905947
•
26–1205004–00
•
E2 assembly
•
European Power Cord CEE7 (not included with units shipped to China)
•
US Power Cord NEMA 5/15 (not included with units shipped to China)
•
China Power Cord GB 2099 (only included with units shipped to China)
•
CXP Expansion Link Cables
•
Rear Rack Mount Support Plates
•
8-32 x .38 Pan Head Screws for Rear Rack Mount Support Plates
•
Rear Rack Mount Brackets
•
USB Thumb Drive (Contains Users Guide, System Software and Control GUI)
•
Safety manual
•
Quick Start Guide
Mechanical check
This check should con
fi
rm that there are no broken parts and the unit is free of dents or scratches. Your Barco Sales representative
should be noti
fi
ed as soon as possible if this is not the case.
24
R5905948 E2 12/12/2014
Содержание Event Master E2
Страница 1: ...E2 User s guide R5905948 00 12 12 2014...
Страница 8: ...Table of contents 4 R5905948 E2 12 12 2014...
Страница 16: ...2 Safety 12 R5905948 E2 12 12 2014...
Страница 32: ...3 General 28 R5905948 E2 12 12 2014...
Страница 82: ...6 GUI orientation Image 6 8 78 R5905948 E2 12 12 2014...
Страница 94: ...6 GUI orientation Image 6 20 90 R5905948 E2 12 12 2014...
Страница 115: ...6 GUI orientation Image 6 37 Thumbnail view Image 6 38 R5905948 E2 12 12 2014 111...
Страница 186: ...7 System Setup 182 R5905948 E2 12 12 2014...
Страница 192: ...8 Updating firmware 188 R5905948 E2 12 12 2014...
Страница 196: ...9 General operation example Image 9 3 192 R5905948 E2 12 12 2014...
Страница 213: ...9 General operation example Image 9 25 R5905948 E2 12 12 2014 209...
Страница 216: ...9 General operation example 212 R5905948 E2 12 12 2014...
Страница 220: ...10 Maintenance 10 2 Process Overview Flow chart Image 10 2 216 R5905948 E2 12 12 2014...
Страница 226: ...10 Maintenance Image 10 11 2 Pull out the Front cover and lay it flat in front of the unit 222 R5905948 E2 12 12 2014...
Страница 281: ...10 Maintenance Disregard the heatsink from the spare kit R5905948 E2 12 12 2014 277...
Страница 282: ...10 Maintenance 278 R5905948 E2 12 12 2014...
Страница 286: ...11 Environmental information Republic of Turkey In conformity with the WEEE Regulation 282 R5905948 E2 12 12 2014...
Страница 288: ...11 Environmental information 284 R5905948 E2 12 12 2014...
Страница 298: ...B Remote Control Protocol 294 R5905948 E2 12 12 2014...
Страница 299: ...C Troubleshooting C TROUBLESHOOTING R5905948 E2 12 12 2014 295...
Страница 300: ...C Troubleshooting 296 R5905948 E2 12 12 2014...