3. Physical installation
1
2
3
4
7
8
5
6
Image 3-10
1
Short power link cable (loop through).
2
Spare spacers with different length.
3
Thumbscrews.
4
Long spacers.
5
Fixation bracket for the female plug (OUTLET).
6
Fixation bracket for the male plug (INLET).
7
Male plug.
8
Female plug.
Necessary parts
Short power link cable with plug type C13/C14.
How to loop through the power to the projector electronics?
1. Make sure that a long spacer (reference 1) is mounted above and below each power socket (reference 2 &3).
2. Plug in the short power cable (reference 4) which was delivered with the projector.
Warning:
Always use the Barco short power cable which is delivered with the projector.
3. Secure both plugs of the short power cable with a
fi
xation plate. Use two thumbscrews (reference 5) per
fi
xation plate. Note
that the smallest
fi
xation plate (reference 7) has to be used upon the upper socket (INLET, reference 2). The large
fi
xation plate
(reference 6), which holds the spare spacers, has to be mounted upon the lower socket (OUTLET, reference 3).
1
2
3
5
4
7
6
Image 3-11
3.5
Connecting a UPS with the projector electronics
W
ARNING
:
Only use UPS units which are suitable for the DP2K C-series projector. See chapter
Installation
requirements
, for more information about the requirements of the UPS.
R5905050 DP2K C-SERIES 10/07/2012
19
Содержание DP2K-12C
Страница 1: ...DP2K C series Installation manual For DP2K 12C DP2K 15C DP2K 20C R5905050 04 10 07 2012...
Страница 6: ......
Страница 64: ...8 Starting up 58 R5905050 DP2K C SERIES 10 07 2012...
Страница 92: ...11 Maintenance 86 R5905050 DP2K C SERIES 10 07 2012...
Страница 104: ...13 Specifications 98 R5905050 DP2K C SERIES 10 07 2012...
Страница 108: ...A Pin configurations 102 R5905050 DP2K C SERIES 10 07 2012...