4. Lamp & Lamp House
4.2
Removal of the lamp house
W
ARNING
:
This procedure may only be performed by quali
fi
ed technical service personnel.
C
AUTION
:
Lamp casing is very hot after operation. To avoid burns, let the projector cool down for at least 15
minutes before proceeding to the lamp unit replacement.
C
AUTION
:
Due to its high internal pressure, the lamp may explode in either hot or cold states if improperly
handled.
Necessary tools
7 mm
fl
at screw driver.
How to remove the lamp house of the projector ?
1. Switch off the projector.
2. Remove the lamp cover.
3. Release the three spring lock screws of the lamp house as illustrated.
Image 4-4
4. Hold fast the lamp house by the handles and pull the lamp house out of the projector.
Caution:
Beware of the weight of the lamp assembly. Take the necessary precautions to avoid personal injury.
Image 4-5
5. Place the lamp house on a stable support.
30
R59770242 DP-1200 06/01/2009
Содержание DP-1200
Страница 1: ...DP 1200 Installation manual R59770242 02 06 01 2009 ...
Страница 12: ...1 Safety 8 R59770242 DP 1200 06 01 2009 ...
Страница 20: ...2 General 16 R59770242 DP 1200 06 01 2009 ...
Страница 29: ...3 Physical Installation 1 2 3 5 4 7 6 Image 3 11 R59770242 DP 1200 06 01 2009 25 ...
Страница 60: ...5 Lenses lens holder 56 R59770242 DP 1200 06 01 2009 ...
Страница 78: ...8 Starting up 74 R59770242 DP 1200 06 01 2009 ...
Страница 86: ...9 Projector registration Image 9 9 Add new owner 82 R59770242 DP 1200 06 01 2009 ...
Страница 104: ...10 Removal and installation of projector covers 100 R59770242 DP 1200 06 01 2009 ...
Страница 124: ...A Specifications A 3 Centre of gravity Centre of gravity 240 377 241 5 Image A 2 120 R59770242 DP 1200 06 01 2009 ...
Страница 128: ...A Specifications 124 R59770242 DP 1200 06 01 2009 ...
Страница 129: ...B Order Info B ORDER INFO Overview Spare part order info R59770242 DP 1200 06 01 2009 125 ...
Страница 132: ...Glossary 128 R59770242 DP 1200 06 01 2009 ...