R5900102 /02
CX-20
40
4.16 First setup of the Base Unit
After the physical installation is done, start with the first setup procedure to activate and configure
your device.
Preferred workflow
1.
Plug in the power supply and HDMI cable.
The Base Unit starts up.
Image 4
–
11
2.
Plug in a network cable.
The system checks for updates.
Image 4
–
12
If an update is available, the base unit will download, update and reboot
if no update is available, the unit will continue to the next step
3.
Start registration to XMS cloud.
Содержание CX-20
Страница 1: ...ENABLING BRIGHT OUTCOMES Installation manual CX 20...
Страница 18: ......
Страница 19: ...19 R5900102 02 CX 20 1 1 Documentation 20 1 2 Symbols and fonts 20 Introduction to the Installation Guide 1...
Страница 21: ...21 R5900102 02 CX 20 CX 20 Specifications 2...
Страница 27: ...27 R5900102 02 CX 20 3 1 Environmental Condition Check 28 3 2 Basic Workflow 28 Getting started 3...
Страница 54: ...R5900102 02 CX 20 54 Preparing the Buttons...
Страница 95: ...95 R5900102 02 CX 20 Firmware updates 7...
Страница 97: ...97 R5900102 02 CX 20 Troubleshooting 8...
Страница 101: ......