Note: Maximum cordset lengths are intended to ensure that adequate power is available to the EZ-SCREEN LS Basic
when the supply is operating at +20 V dc. Values in the previous table are worse case. Contact banner Engineering if
there are any questions.

Note: The length of Emitter machine interface cordsets can be two times longer than those listed for the receiver in the
table above if a CSB Splitter cordset is not used. If a CSB Splitter cordset is used, connect one branch of the CSB
splitter to the receiver and other branch to the emitter via DEE2R double-ended cordset up to the same length listed in
the table above.

6.2 Initial Electrical Connections

WARNING: Proper Electrical Hookup

Electrical hookup must be made by Qualified Personnel and must comply with NEC (National Electrical

Code) and local standards. Make no more connections to the EZ-SCREEN LS Basic System than are

described in this manual. Connection of other wiring or equipment to the EZ-SCREEN LS Basic System

could result in serious injury or death.

Lockout/tagout procedures may be required (refer to OSHA1910.147, ANSI Z244-1, ISO 14118, or the appropriate standard

for controlling hazardous energy). Following relevant electrical standards and wiring codes, such as the NEC, NFPA79 or

IEC60204-1, always connect the earth ground (green/yellow wire). Do not operate the EZ-SCREEN LS Basic without an

earth ground connection.
Make the electrical connections in the order described in this section. Do not remove end-caps; no internal connections are

to be made. All connections are made through the RD or pigtail QD connections.

Emitter Cordset

EZ-SCREEN LS Basic emitters have either a 5-pin or 8-pin cordset, but not all conductors are used. The other
wires are in place to allow a parallel connection (color-for-color) to the receiver cable, providing sensor
interchangeability (or “swapability”); either sensor may be installed at either cordset connection. In addition to
providing similar cabling, this wiring scheme is advantageous during installation, wiring, and troubleshooting.

Receiver Cordset—5-pin

Do not connect any wires to the machine control circuits (OSSD outputs) at this time.

Receiver Cordset—8-pin

Do not connect any wires to the machine control circuits (OSSD outputs) at this time. For the initial power-up and
checkout, External Device Monitoring (EDM) must be configured/wired (see 

External Device Monitoring 

on page

41), the Scan Code must be selected (see 

Scan Code Select 

on page 42), and the Fault Output can be

connected (see 

Fault Output 

on page 13). Take precautions to prevent unused wires from shorting to ground or to

other sources of energy (for example, terminate with a wire-nut). Final OSSD wiring must be completed later.

6.3 Initial Checkout Procedure

The initial checkout procedure must be performed by a Qualified Person. It must be performed only after configuring the

System and after connecting the components.
Perform this procedure to:

• Ensure proper installation when the System is first installed
• Ensure proper System function whenever any maintenance or modification is performed on the System or on the

machinery that is guarded by the System.

6.3.1 Configuring the System for Initial Checkout

For the initial checkout, the EZ-SCREEN LS Basic System must be checked without power available to the guarded

machine. Final interface connections to the guarded machine cannot take place until the light screen system has been

checked out. This may require lockout/tagout procedures (refer to OSHA1910.147, ANSI Z244-1, ISO 14118, or the

appropriate standard for controlling hazardous energy). The OSSD connections will be made after the initial checkout

procedure has been successfully completed.
Verify that:

• Power has been removed from (or is not available to) the guarded machine and its controls or actuators
• The machine control circuit or the Safety/Interface Module is not connected to the OSSD outputs at this time

(permanent connections will be made later)

 

 

EZ-SCREEN

®

 LS Basic Safety Light Screen

 

www.bannerengineering.com - Tel: 763.544.3164

35

Содержание SLLVE23-350

Страница 1: ...EZ SCREEN LS Basic Safety Light Screen Instruction Manual Original Instructions 204120 Rev A 4 January 2018 Banner Engineering Corp All rights reserved 204120...

Страница 2: ...ation Considerations 20 5 1 1 Calculating the Safety Distance Minimum Distance 20 5 1 2 Reducing or Eliminating Pass Through Hazards 22 5 1 3 Supplemental Safeguarding 23 5 1 4 Reset Switch Location 2...

Страница 3: ...ecking for Sources of Electrical Noise 56 9 3 2 Check for Sources of Optical Noise 56 10 Maintenance 57 10 1 Cleaning 57 10 2 Warranty Service 57 10 3 Manufacturing Date 57 10 4 Disposal 57 11 Accesso...

Страница 4: ...dition that could result in serious injury or death 1 2 Use of Warnings and Cautions The precautions and statements used throughout this document are indicated by alert symbols and must be followed fo...

Страница 5: ...cations or update documentation at any time Specifications and product information in English supersede that which is provided in any other language For the most recent version of any documentation re...

Страница 6: ...er Engineering Japan Cent Urban Building 305 3 23 15 Nishi Nakajima Yodogawa Ku Osaka 532 0011 Japan Phone 81 0 6 6309 0411 Website www bannerengineering com Email mail bannerengineering co jp Taiwan...

Страница 7: ...NSI B11 15 Pipe Tube and Shape Bending Machines ANSI B11 16 Metal Powder Compacting Presses ANSI B11 17 Horizontal Extrusion Presses ANSI B11 18 Machinery and Machine Systems for the Processing of Coi...

Страница 8: ...t in Respect to Approach Speeds of Parts of the Human Body ISO 14119 EN 1088 Interlocking Devices Associated with Guards Principles for Design and Selection EN 60204 1 Electrical Equipment of Machines...

Страница 9: ...outputs turn Off These safety outputs are connected to the guarded machine s final switching devices FSDs that control the machine primary control elements MPCEs which immediately stop the motion of t...

Страница 10: ...g and checkout procedures are not followed properly the EZ SCREEN LS Basic cannot provide the protection for which it was designed CAUTION Install System Only on Appropriate Applications Banner EZ SCR...

Страница 11: ...cy The appropriate reset procedure The Diagnostic Display is used to diagnose causes of a Lockout condition See Troubleshooting on page 54 3 2 Components 3 2 1 Models An EZ SCREEN LS Basic System refe...

Страница 12: ...RDLS 8 D DELS 11 E DELSE 81D or DELSE 51D 5 See Accessories on page 58 for additional cordsets interfacing solutions and accessories Models Table Table 2 EZ SCREEN LS Basic23 mm Resolution Models Emi...

Страница 13: ...nitoring or no monitoring EDM is used when the EZ SCREEN LS Basic OSSD outputs directly control the MPCEs or other external devices This feature is only available with the 8 conductor models 3 3 3 Fau...

Страница 14: ...e color for color wiring allows the emitter and receiver positions to be interchanged swapped without rewiring Figure 3 300 mm Pigtail with M12 Euro style QD Figure 4 RD Connection with 8 wire Flying...

Страница 15: ...tor shows system status RUN mode ON or Lockout OFF 1 Digit Diagnostic Display indicates configuration or specific error conditions or the total number of blocked beams Bi color red green Alignment ind...

Страница 16: ...vibration and shock tests according to IEC 61496 1 This includes vibration 10 cycles of 10 55 Hz at 0 35 mm 0 014 in single amplitude 0 70 mm peak to peak and shock of 10 g for 16 milliseconds 6 000...

Страница 17: ...ht Immunity Totally immune to one Federal Signal Corp Fireball model FB2PST strobe 4 3 Emitter Specifications Emitter Elements Wavelength Infrared LEDs 850 nm at peak emission Fault Output Switching C...

Страница 18: ...to Hole Length with Brackets In L3 mm Defined Area 5 mm SLL 350 355 mm 14 0 in 397 1 339 1 350 SLL 420 425 mm 16 7 in 466 6 408 6 420 SLL 630 634 mm 25 0 in 676 1 618 1 630 SLL 910 914 mm 36 0 in 955...

Страница 19: ...Area 5 mm SLL 1190 1193 mm 47 0 in 1235 1 1177 1 1190 SLL 1260 1263 mm 49 7 in 1304 6 1246 6 1260 SLL 1330 1333 mm 52 5 in 1374 6 1316 6 1330 SLL 1540 1542 mm 60 7 in 1584 1 1526 1 1540 SLL 1820 1821...

Страница 20: ...n Components Carefully The emitter and receiver must be positioned such that the hazard cannot be accessed by reaching over under around or through the sensing field Additional and supplemental guardi...

Страница 21: ...ed distance due to the depth penetration factor as prescribed in OSHA 29CFR1910 217 and ANSI B11 19 for U S applications See Depth Penetration Factor Dpf table below or calculate using the formula in...

Страница 22: ...evant devices and controls in your calculations If required each of the two Machine Primary Control Elements MPCE1 and MPCE2 must be capable of immediately stopping the dangerous machine motion regard...

Страница 23: ...ht Curtain Screen Figure 9 An example of supplemental safeguarding Figure 9 on page 23 shows an example of supplemental safeguarding inside a robotic work cell The EZ SCREEN LS Basic in conjunction wi...

Страница 24: ...arnings of machine start up 5 1 5 Adjacent Reflective Surfaces WARNING Avoid Installation Near Reflective Surfaces Avoid locating the sensing field near a reflective surface it could reflect sensing b...

Страница 25: ...are On and the OSSDs are On Increasing the size of the test piece to block additional beams causes a blocked condition The size of the test piece required to do this determines the actual resolution U...

Страница 26: ...r Orientation The emitter and receiver must be mounted parallel to each other and aligned in a common plane with both machine interface cable ends pointing in the same direction Never mount the emitte...

Страница 27: ...er optical crosstalk may take place between the systems To minimize optical crosstalk alternate the positions of the emitters and receivers see Figure 14 on page 28 When three or more systems are inst...

Страница 28: ...y outputs to a single device could result in serious injury or death WARNING Scan Code In situations where multiple systems are mounted closely together or where a secondary emitter is in view within...

Страница 29: ...nuts supplied with the bracket kit or user supplied hardware Use the M5 hardware to mount the brackets to the light curtain use the M6 hardware to mount the brackets to the machine Brackets are desig...

Страница 30: ...Remove the channel nuts from the EZLSA MBK 12 clamp and slide them into the side mounting channel A small piece of adhesive tape can be use to temporarily location the nuts within the channel 4 Positi...

Страница 31: ...on page 65 for mounting bracket dimensions and the installation guide 5 2 5 Sensor Mounting and Mechanical Alignment Verify that The emitter and receiver are directly opposite each other Nothing is in...

Страница 32: ...t the emitter and receiver are equal Both sensors are level plumb check both the side and face Defined area is square Check diagonal measurements if possible Diagonal A Diagonal B 5 2 6 Mounting Dimen...

Страница 33: ...Center Mount Brackets Dimensions Figure 20 EZLSA MBK 12 Side Mount Brackets Dimensions Figure 21 EZLSA MBK 16 EZ SCREEN LS Basic Safety Light Screen www bannerengineering com Tel 763 544 3164 33...

Страница 34: ...conduit See Cordsets on page 58 for selection of Banner supplied cables EZ SCREEN LS Basic is designed and manufactured to be highly resistant to electrical noise and to operate reliably in industria...

Страница 35: ...tion In addition to providing similar cabling this wiring scheme is advantageous during installation wiring and troubleshooting Receiver Cordset 5 pin Do not connect any wires to the machine control c...

Страница 36: ...er Lockout Condition the emitter Status indicator is single flashing red the receiver Status indicator is solid red and the receiver s 7 segment display reads CH1 A Receiver Lockout Condition the rece...

Страница 37: ...ool can be used to assist or confirm alignment by providing a visible red dot along the sensor s optical axis Note If at any time the red Status indicator begins to flash steadily the System has enter...

Страница 38: ...ble 7 Appropriate Test Pieces for Trip Test 23 mm Resolution Models 23 mm 0 91 in diameter STP 19 2 Verify that the System is in Run mode the Green Status indicator is On all Alignment indicators are...

Страница 39: ...s on page 39 and FSD Interfacing Connections on page 40 as required by each individual application Lockout tagout procedures may be required refer to OSHA 1910 147 ANSI Z244 1 ISO 14118 or the appropr...

Страница 40: ...ts are either single channel which is a series connection of at least two normally open contacts or dual channel which is a separate connection of two normally open contacts In either method the safet...

Страница 41: ...status of the device This ensures that the normally open contacts used for controlling hazardous motion have a positive relationship with the normally closed monitoring contacts and can detect a failu...

Страница 42: ...are any questions concerning retrofit installations contact Banner Engineering 6 4 5 Fault Output The current sourcing PNP solid state output 70 mA maximum is used for control functions that are not...

Страница 43: ...Other interfacing modules and solutions are available see Accessories on page 58 and www bannerengineering com Note For interfacing modules or remotely located safety I O blocks where pin 5 of a 5 pin...

Страница 44: ...ew S34 A2 S21 UM FA A S22 S12 13 14 DIP Switch Configuration 1 2 ON MSC1 K1A K2A L2 23 24 MSC2 K1B K2B 33 34 MSC3 K1C K2C L1 Machine Control Outputs A1 Machine Master Stop Control Elements 6A max 6A m...

Страница 45: ...t split SO1a SO1b EDM IN2 24Vdc 0Vdc Dual Channel Safety Stop Circuit Single Channel Safety Stop Circuit 5 pin male Euro style face view Figure 32 Generic Wiring Diagram XS SC26 2 Safety Controller No...

Страница 46: ...rcuit Dual Channel Safety Stop Circuit 1 Brown 7 Green Yellow 6 Blue 5 Black 4 White 8 Violet 3 Orange 2 Orange Black Scan Code 1 Not connected or connected to 0V dc as shown Scan Code 2 Connect to 24...

Страница 47: ...EDM Fault Out FSD2 FSD1 Single Channel Safety Stop Circuit Dual Channel Safety Stop Circuit NOTE Do not exceed OSSD maximum load capacitance specification Figure 33 Generic Wiring Diagram 8 pin Recei...

Страница 48: ...her interfacing modules and solutions available See the Banner Engineering catalog or website for more information Note See the IM T A module datasheet p n 62822 for complete installation instructions...

Страница 49: ...er is in Lockout the display also momentarily indicates the scan code setting at power up or when changed Table 8 Emitter Status Indicator Operation Operating Status Status Indicator 7 Segment Diagnos...

Страница 50: ...s aligned and receives the proper sync pattern it enters Run mode and begins scanning to determine the blocked or clear status of each beam No manual reset operation is required 7 3 2 Run Mode If any...

Страница 51: ...gular basis as instructed in Checkout Procedures on page 52 Failure to correct such problems can result in an increased risk of harm Before the System is put back into service verify that the EZ SCREE...

Страница 52: ...the safety system that includes the Banner device and the guarded machine until the defect or problem has been corrected Attempts to use the guarded machine under such conditions could result in serio...

Страница 53: ...vidual to any hazard during the following checks WARNING Before Applying Power to the Machine Verify that the guarded area is clear of personnel and unwanted materials such as tools before applying po...

Страница 54: ...ilures and Lockout conditions are indication of a problem and must be investigated immediately by a Qualified Person9 Attempts to continue to operate machinery by bypassing the Banner device or other...

Страница 55: ...peration If the System fails the Daily Checkout procedure replace the receiver If the error continues check the ground connection pin 7 If the sensor has a good earth ground connection to pin 7 perfor...

Страница 56: ...m nuisance Trips occur check the following Poor connection between the sensor and earth ground Optical interference from adjacent light screens or other photoelectrics Sensor input or output wires rou...

Страница 57: ...ive by a Banner Applications Engineer they will advise you of Banner s RMA Return Merchandise Authorization procedure Important If instructed to return the device pack it with care Damage that occurs...

Страница 58: ...of cordsets and directly connects to other devices with a 5 pin M12 QD MQDEC 4 SS M12 QD to M12 QD female male is used for connecting to devices that do not have earth ground on pin 5 of a 5 pin QD I...

Страница 59: ...face view QDE 515D 4 5 m 15 ft Pin Color Emitter Function Receiver Function 1 Brown 24 V dc 24 V dc 2 White no connection OSSD2 3 Blue 0 V dc 0 V dc 4 Black no connection OSSD1 5 Gn Ye Gnd Chassis Gnd...

Страница 60: ...4 6 m 15 ft DEE2R 825D 7 6 m 25 ft DEE2R 830D 9 1 m 30 ft DEE2R 850D 15 2 m 50 ft DEE2R 875D 22 9 m 75 ft DEE2R 8100D 30 5 m 100 ft DEE2R 5 D 5 pin M12 Euro style QD to M12 Euro style QD female male...

Страница 61: ...LSE 1D cordsets to create or replace a 300 mm pigtail M12 Euro style quick disconnect models ending in P8 or P5 Model Length Banner Cordset Pinout Color Code DELSE 81D 0 3 m 1 ft Pin Color Emitter Fun...

Страница 62: ...0 Typ 1 58 18 0 0 71 4 5 0 18 35 1 38 M12 x 1 5 Pin Splitter Cordsets Allows easy interconnection between an 5 pin receiver and 5 pin emitter and provides a single trunk cable for the optional interch...

Страница 63: ...anically linked relay safety outputs for the EZ SCREEN LS Basic system with a 5 pin interconnect P5 or 8 pin interconnect P8 when a manual reset latch is required by the application See datasheet p n...

Страница 64: ...Interface Modules IM T A interface modules provide forced guided mechanically linked relay safety outputs for the EZ SCREEN LS Basic System with an 8 pin interconnect with EDM function The IM T A int...

Страница 65: ...n the back or the side of the sensor Includes one bracket and hardware Order two or three EZLSA MBK 16 brackets per sensor EZLSA MBK 20 Adapter brackets for mounting to engineered slotted aluminum fra...

Страница 66: ...JUSTMENT outer bracket bracket assembly EZ SCREEN light screen clamp screw max torque 15 in lbs rotation position screw max torque 20 in lbs front front 58 0 2 28 12 5 0 49 74 0 2 91 55 0 2 17 55 0 2...

Страница 67: ...hen they are protecting both the emitter and receiver Order one per sensor Sensor Model Lens Shield Model Sensor Model Lens Shield Model SLL 350 EZLS 350 SLL 1190 EZLS 1190 SLL 420 EZLS 420 SLL 1330 E...

Страница 68: ...EZLSA TE 910 SLL 1680 EZLSA TE 1680 SLL 1120 EZLSA TE 1120 SLL 1820 EZLSA TE 1820 11 12 EZ LIGHTS for EZ SCREEN Provides clear 360 indication of the of the EZ SCREEN receiver s output status and rece...

Страница 69: ...67 K50LRGX8PQ8 Polycarbonate housing 50 mm thermoplastic dome 30 mm base mount Fully encapsulated IP67 K80LRGX8PQ8 Polycarbonate housing 50 mm thermoplastic dome flat or DIN mount Encapsulated electro...

Страница 70: ...g bracket accessories list Brackets may be inverted from the positions shown decreasing dimension L1 by 58 mm 2 3 in Mirror Model13 Defined Area Length Reflective Area Y Mounting 1 Mounting L2 SSM 200...

Страница 71: ...Stand Height MSA S24 1 610 mm 24 in 483 mm 19 in 616 mm 24 25 in 4 M10 Bolt Pole 40 mm 1 58 Square Useable Stand Height Base 6 4 mm 0 25 MSA S42 1 1067 mm 42 in 940 mm 37 in 1073 mm 42 25 in MSA S66 1...

Страница 72: ...condition occurs OSSD1 and OSSD2 outputs simultaneously turn off within the system response time Brake A mechanism for stopping slowing or preventing motion C Cascade Series connection or daisy chain...

Страница 73: ...r no effect or a Lockout condition are permitted failures which cause an unsafe condition a failure to danger are not Banner safety products are extensively FMEA tested G Guarded Machine The machine w...

Страница 74: ...when the object is removed from the defined area To re energize the outputs perform a proper manual reset Minimum Object Sensitivity MOS The minimum diameter object that a safety light screen system c...

Страница 75: ...machine cycle runs to completion and the operator can then insert a new part and start another cycle The presence sensing device continually guards the machine Single break mode is used when the part...

Страница 76: ...ied Test Piece An opaque object of sufficient size used to block a light beam to test the operation of a safety light screen system When inserted into the defined area and placed in front of a beam th...