May 22, 2023
EZ-SCREEN SLS Safety Light Curtain Instruction Manual
67
Perform the procedure contained on the
Daily Checkout
card at every shift change, power-up, and machine set-up change.
During continuous machine run periods, this checkout should be performed at intervals not to exceed 24 hours.
A
Designated Person
or
Qualified Person
(as defined in the
"Glossary of Safety Terminology" on page 107
procedure. A copy of checkout results should be recorded and kept in the appropriate place (for example, near or on the ma-
chine, in the machine’s technical file).
Refer to the procedure detailed on the
Daily Checkout card (Banner p/n 113361 for SLS.. models, P/N 118173 for SLSC..
models), which can be downloaded from
.
Perform the procedure on the
Semi-Annual Checkout
card every six months following System installation, or whenever
changes are made to the System (either a new configuration of the EZ-SCREEN or changes to the machine).
A
Qualified Person
(as defined in the
"Glossary of Safety Terminology" on page 107
) must perform the procedure. A copy of
checkout results should be recorded and kept in the appropriate place (for example, near or on the machine, in the machine’s
technical file).
Download a copy of the Semi-Annual Checkout card (Banner p/n 113362) at
◦
◦
◦
WARNING:
Clear the guarded area before applying power or resetting the system
Failure to clear the guarded area before applying power could result in serious injury or
death.
Verify that the guarded area is clear of personnel and any unwanted materials before ap-
plying power to the guarded machine or before resetting the system.
Apply power to the guarded machine and verify that the machine does not start up.
12.
Interrupt (block) the defined area with the appropriate test piece (ordered separately) and verify that it is not possible
for the guarded machine to be put into motion while the beam(s) is blocked.
13.
Initiate machine motion of the guarded machine and, while it is moving, use the appropriate test piece (ordered sepa-
rately) to block the defined area. Do not attempt to insert the test piece into the dangerous parts of the machine. Upon
blocking any beam, the dangerous parts of the machine must come to a stop with no apparent delay.
14.
Remove the test piece from the beam; verify that the machine does not automatically restart, and that the initiation
devices must be engaged to restart the machine.
15.
Remove electrical power to the
EZ-SCREEN SLS. Both OSSD outputs should immediately turn Off, and the machine
must not be capable of starting until power is re-applied to the
EZ-SCREEN SLS
.
16.
Test the machine stopping response time, using an instrument designed for that purpose, to verify that it is the same
or less than the overall system response time specified by the machine manufacturer.
Do not continue operation until
the entire checkout procedure is complete and all problems are corrected.
17.
Shift/Daily Checkout
7.3
Semi-Annual (Six-Month) Checkout
7.4
© Banner Engineering Corp.
Содержание EZ-SCREEN SLS
Страница 16: ...May 22 2023 EZ SCREEN SLS Safety Light Curtain Instruction Manual 16 Banner Engineering Corp...
Страница 52: ...Blank page 52...
Страница 68: ...Blank page 68...
Страница 90: ...Blank page 90...
Страница 102: ...Blank page 102...
Страница 106: ...Blank page 106...
Страница 114: ...LinkedIn Twitter Facebook 2023 All rights reserved www bannerengineering com...