Commissioning
Panel PC 2100 user's manual V1.17
213
3. Install the retaining clips on the device. This is done by inserting the clips into the openings on the sides of
the device (indicated by the orange circles). The number of retaining clips may vary depending on the panel.
For the exact number, see
Fig. X "AP9x3 panels - Installation diagrams" on page
.
Figure 113: Inserting the retaining clips (sample figure)
4. Fasten the retaining clips to the wall or control cabinet by alternately tightening the screws with a 2.5 hex key
screwdriver. The tightening torque should be max. 1 Nm to provide an optimal seal.
1 - 6 mm
Wall or
control cabinet plate
Figure 114: Fastening the retaining clips (sample figure)