background image

 

 
 
 

 

 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 
 

 

MAIN CHARACTERISTICS 

 

Motor 

AK-224 (incorporated control unit) 

 

Tension for commands 

24Vdc 400mA max 

Kind of limit switch 

encoder on both motors 

 

Flashing light 

25W 24Vdc 

Tension of operation 

24Vdc 

 

Working time 

0-120s 

Absorbed current  

5A max 

 

Automatic closing time 

0-120s 

Absorbed power  

120W max 

 

Forewarn 

1.5s 

Force 

1200N 

 

Temperature of exercise 

-20°C - +70°C 

Opening time  

11.5s 

 

Protection grade 

IP56 

Opening of the leaf 

90° - 100° 

 

 

 

Max length of the leaf 

2m 

 

 

 

Temporary service 

80% 

 

 

 

 

Содержание AK-224

Страница 1: ...th motors Flashing light 25W 24Vdc Tension of operation 24Vdc Working time 0 120s Absorbed current 5A max Automatic closing time 0 120s Absorbed power 120W max Forewarn 1 5s Force 1200N Temperature of exercise 20 C 70 C Opening time 11 5s Protection grade IP56 Opening of the leaf 90 100 Max length of the leaf 2m Temporary service 80 ...

Страница 2: ... a maximum length of 2m The motor can be installed even at the right then at the left side of the gate The device must be destined exclusively to the usage it was con ceived for Any other usage is to be considered improper and therefore dangerous Control pushbuttons have to be installed at an height between 1 5m and 1 8m in a position not accessible by children or under age in direct view of the g...

Страница 3: ...ning as during closing If stopped in any position it has no to move During movement it must not skid WARNING It is forbidden to put in service the automation before the machine in which it will be incorporate has been de clared complying to dispositions of the directive CEE 22 06 98 ASSEMBLING Open the package and verify that all the elements which compose the automation are in good status UNLOCKI...

Страница 4: ...CABAT 30 12 Pin RESET short circuit in case of total cancellation of memorized run VISIBLE CONTROL ON THE STATE OF THE UNIT The control unit is designed with the aim to complete the installation in the shortest time possible and therefore to immediately see if the connections are correct through the switching on of corresponding LEDs A Red Led signal the presence of feeding DL1 POWER it indicates ...

Страница 5: ...ll contacts N A dress to the same input must be connected in parallel Preview disconnecting devices on the feeding line in an accessible place For the feeding of the control unit set an appropriate external discon necting device not included with equipment Hold the cables of feeding separated from those of the encoder with a distance between motor and control unit of maximum 10m Don t use multi po...

Страница 6: ...een ClampN 14 and Clamp N 19 Contact N A Normally open It s a command for opening that in case we set the functioning with 2 motors will make motor M1 open completely If we selected to function with only one motor will do a partial opening of the 40 of the run Functioning Step Step P P Connect between ClampN 15 and Clamp N 19 Contact N A Normally open It s a commando for opening that works in two ...

Страница 7: ...ly closed it will open first motor M1 and then motor M2 to reach the mechanical stop in maximum opening all the learning procedure of mechanical stops is execute in slowing down The first manoeuvre that execute the control unit is a closing one this is done in order to make the installer understand if the two wires of the motors are connected in the right way If a closing doesn t take place do a r...

Страница 8: ...ispose in the environment Find out about the method for recycling or disposing of the product in compliance with current local laws NOTES PROGET srl Via Europa 3 31047 Ponte di Piave TV ITALY tel 39 0 422 857377 fax 39 0 422 857367 web http www proget beb com email proget proget beb com rev 1 0 3 04 2009 ...

Отзывы: