background image

 

 

 

BAND-IT-IDEX, Inc. 
A Unit of IDEX Corporation 
4799 Dahlia Street 
Denver, CO 80216-3070 USA 
P: 1-800-525-0758 
F: 1-800-624-3925

 

Document # P36187 Rev. G 

© Copyright 

BAND-IT-IDEX, Inc. 2007 

All rights reserved 

www.BAND-IT-IDEX.com 

 

Page 1 of 3 

G40269 Giant II

Hand Tool

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Operating 
Instructions 

1. Band may be used from bulk roll as this

 

completely eliminates waste of band

. Slide 

buckle on band as shown, bringing end of 
band around object to be clamped and 
again through buckle. 

 

2. Continue band around object once 
more and again through buckle. 

Double banding develops a great deal 
more radial compression than single 
banding.

 Bend end of band under 

buckle. 

3. Place band in open of tool nose and 
gripper block. Move into slot as far as 
possible, to avoid buckle sliding into tool 
nose. Apply tension by turning handle of 
tool.  

4. Place finger on BAND-IT Band at buckle 
bridge while tensioning with tool handle. 
When you feel BAND-IT Band stop moving 
through buckle as you are turning handle, 

maximum pressure is being exerted by the 
BAND-IT Band

 around object being 

clamped. 

Stop turning handle. 

5. 

Roll tool over buckle, backing off with 

tension handle1- 1½ turns throughout entire 
rolling operation

. Failure to back off tension 

with tension handle throughout entire course 
of roll-over may result in breaking of band. 
There is no loss of tension as band released 
is used up in the bend. 

6. Pull cutting handle to cut the band. 
When applying Giant Band clamps, prior 
to cutting off clamp, release band gripper 
and push tool nose away from buckle 
approx. ¼”. 

7. Remove tool, 
holding stub of band 
down with thumb. 

8. Hammer 
down buckle 
ears to complete 
BAND-IT clamp. 

Отзывы: