11
DIAGRAM OF CONNECTING MORE THAN ONE BURNER TO
THE GAS PIPE NETWORK AT AVERAGE PRESSURE
N° BT 8530/1
1 - Measuring and reducing unit
2 - Interception
3 - Filter
4 - Reducer
5 - Meter
6 - Emergency interception (installed outside)
7 - Ball cock
8 - Filter
9 - Final reducer or stabilizer
10- Anti-vibration joint
11- A couple of flane
D = Distance between pressure stabilizer and valve about 1,5 ÷ 2 m
DIAGRAM OF CONNECTING A BURNER TI THE
GAS PIPE NETWORK AT AVERAGE PRESSURE
N° BT 8531/1
1 - Measuring and reducing unit
2 - Interception
3 - Filter
4 - Reducer
5 - Meter
6 - Wire gauze flame trap
7 - Eventual automatic overflow valve (it should obviously
unload outside in a suitable place)
8 - Emergency interception installed outside
9 - Ball cock
10- Anti-vibration joint
11- A couple of flange
Содержание BGN 100 DSPGN
Страница 6: ...6 BGN 40 DSPGN 100 DSPGN N 7604 2 Rev 02 02 96 BGN 120 DSPGN 350 DSPGN N 7605 5 Rev 17 11 97...
Страница 19: ...19 AIR REGULATION PRINCIPLE DIAGRAM FOR GAS BURNERS BT 8769 1...
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......