COMPREHENSIVE MAINTENANCE

About comprehensive maintenance

In order to ensure maximum efficiency and minimum downtime of your evaporative cooling system, it is

recommended to establish and execute a programme of preventive maintenance.
Your local BAC Balticare representative will assist you in establishing and implementing such programme. The

preventive maintenance programme must not only avoid that excessive downtime occurs under unforeseen and

unwanted conditions, it also ensures that factory authorized replacement parts are used, which are designed to fit

and for their purpose carry the full factory warranty. To order factory authorized parts, contact your local BAC

Balticare representative. Make sure you include the unit serial number when ordering any parts.
To facilitate servicing of the equipment, it is suggested that the following parts be carried on hand:

Make-up float ball (if applicable)

Water make-up valve

Fan shaft bearings

Spray nozzles and grommets

Spray distribution branch grommets

Set of belts

Baltiplus/Baltibond

®

repair (touch-up) kits

Insist on factory authorised parts to avoid loss of efficiency or an operational risk, which may occur when non

authorised parts are used.

Prolonged outdoor stay

Should the unit(s) be stored outside prior to installation and/or start-up for approximately one month (shelf life) or

longer, or stored in severe climates, it is imperative that certain actions be performed by the installing contractor in

order to maintain the unit in "as shipped" condition. These actions include but are not limited to:

Rotate the fan(s) once per month, at least 10 revolutions.

Rotate the motor shaft of all motors installed on the unit(s) once per month, at least 10 revolutions. This

includes the pump motor.

Add desiccants to control panel interiors.

Wrap motor in non-plastic protective material.

Keep drains open on the cold water basins.

Ensure unit(s) is stored on level ground surface.

Remove and store fan belts and access door gaskets.

Hot dip galvanized and stainless steel coils of BAC closed circuit cooling towers are filled with a low pressure

inert gas at the factory before shipping, to ensure an optimal internal corrosion protection. It is recommended to

check the overpressure every six months (connect a manometer to the valve).

Purge old bearing grease by new grease at start of storage period and repeat before start-up.

Protect all black steel components with RUST VETO or equivalent corrosion protective material.

For complete instructions, please contact your local BAC Balticare Representative.

32

VFL

6

6 Comprehensive Maintenance

6 Comprehensive Maintenance

Содержание VFL 241-H

Страница 1: ...VFL Closed Circuit Cooling Towers OPERATING AND MAINTENANCE INSTRUCTIONS MVFLv19EN...

Страница 2: ...nized Codes of Practice such as EUROVENT 9 5 6 ACOP HSC L8 Guide des bonnes pratiques Legionella et tours a ror frig rantes etc Water sampling test results and corrective actions should be recorded in...

Страница 3: ...epends on applied code of practice Notes 1 Water treatment and auxiliary equipment integrated in the cooling system may require additions to the table above Contact suppliers for recommended actions a...

Страница 4: ...14 Passivation 14 Overflow connection 15 4 Cold Weather Operations 16 About cold weather operation 16 Protection against sump water freezing 16 Capacity control 16 Protection against coil freezing 17...

Страница 5: ...W B A L T I M O R E A I R C O I L E U 5 CONSTRUCTION DETAILS 1 Casing 2 Water distribution section 3 High efficiency drift eliminators 4 Forward curved centrifugal fan 5 Fan shaft and bearing 6 Fan mo...

Страница 6: ...for an ambient temperature range from 25 C to 40 C Design pressure max 10 bar Fluid inlet temperature max 82 C Fluid outlet temperature min 10 C Fluids circulated through the inside of the coils must...

Страница 7: ...stem volume per year If the annual make up of the closed system is greater than 15 yearly or if highly corrosive water such as water with very low hardness or alkalinity is used it is recommended to c...

Страница 8: ...ith extra care to prevent accidents CAUTION Do not cover units with PVC eliminators with a plastic tarpaulin Temperature increase due to sun radiation could deform the eliminators AUTHORIZED PERSONNEL...

Страница 9: ...ent of refrigerants if applicable oil and other parts must be done with respect to the environment whilst protecting workers from potential risks related to exposure to harmful substances National and...

Страница 10: ...event of any such defect BAC will repair or provide a replacement For more details please refer to the Limitation of Warranties applicable to and in effect at the time of the sale purchase of these p...

Страница 11: ...thereafter Moreover there must be an ongoing programme of monitoring in place to ensure the water treatment system is maintaining the water quality within the control guidelines Check and adjustments...

Страница 12: ...owed provided the sum of chlorides sulfates parameters does not exceed 650 mg l for Baltibond SST304L Baltiplus protection pH 6 5 to 9 0 pH during initial passivation Below 8 2 Total hardness as CaCO3...

Страница 13: ...ation of sulphates is allowed provided the sum of chlorides sulphates parameters does not exceed 650 mg l for SST304L and 1500 mg l for SST316L For Ozone water treatment application Stainless steel 31...

Страница 14: ...which may cause corrosion Preferably the water treatment chemicals should be fed into the cooling system at the discharge of the recirculation pump The chemicals should not be fed in concentrated for...

Страница 15: ...secondary approach is to conduct a chemical passivation using inorganic phosphate or film forming passivation agents Consult your water treatment specialist for specific recommendation Overflow connec...

Страница 16: ...from wet to dry operation as the sump water is protected at all times For dry operation applications ensure that make up water line is shut off and make up valve completely drained Thermostats for el...

Страница 17: ...ct the pump from running dry in case of make up failure or extreme water loss The status of the alarm can be checked prior to pump start up but should not be considered during the first minute after s...

Страница 18: ...If the process load is extremely light or shut off it may be necessary to apply an auxiliary heat load during freezing conditions Consult your local BAC Balticare representative for advice if these c...

Страница 19: ...M VFL 484 M 23 0 27 2 30 5 30 5 33 8 13 8 14 5 15 2 15 2 15 9 VFL 721 L VFL 721 M VFL 721 O VFL 722 N VFL 722 O VFL 723 L VFL 723 O VFL 724 O 7 9 40 1 40 1 40 1 46 4 46 4 51 5 51 5 56 6 17 8 17 8 17 8...

Страница 20: ...r the basin has been flushed the strainers should be removed cleaned and replaced before refilling the basin with fresh water CAUTION Do not use acid to clean the strainers Remote Basin The water leve...

Страница 21: ...height from sump bottom to water level and compare with face value from table 4 Check valve for leakage and replace valve if necessary 5 Check that float arm can move freely and that float ball floats...

Страница 22: ...ine ensure that the valve is unobstructed and that blow down water can drain freely Measure the blow down flow rate by recording the time needed to fill a given volume For automatic blow down using co...

Страница 23: ...ing 3 Check belt tension by verifying both following conditions The deflection amounts 10 mm m free belt length see figure below The deflection force required is between the minimum and maximum values...

Страница 24: ...nsioned re tighten the locking nuts on the motor base adjusting screws There should be no chirp or squeal when the fan motor is started DRIVE ALIGNMENT Proper drive alignment ensures maximum belt life...

Страница 25: ...nd pumps must rotate in the correct direction which is indicated by arrows on the equipment Check proper functioning as follows 1 Stop fan s and pump s 2 Turn the fan by hand to ensure rotation withou...

Страница 26: ...of mechanical components or operational problems e g unwanted ice formation If this occurs a thorough inspection of the entire unit followed by immediate corrective action is needed If required consul...

Страница 27: ...ly in parallel to it Selecting a coil cleaner is important since the cleaner must neutralise and remove deposits on the surface of the coil BAC does not recommend the use of alkaline and acidic coil c...

Страница 28: ...art fan s and pump s Nozzle spray distribution type FAN SHAFT The exposed areas of the fan shaft are coated with a soft seal for added corrosion protection It is recommended that the coating be inspec...

Страница 29: ...correctly Lubrication FAN SHAFT BEARINGS The fan shaft is supported by ball bearings see figure below Under normal operating conditions the bearings should be greased every 2000 operating hours or at...

Страница 30: ...C Total Fina Elf Multis 3 20 C to 120 C Grease products ADJUSTABLE MOTOR BASE The motor base adjusting screw see figure below should be coated every six months using a good quality corrosion inhibiti...

Страница 31: ...ocal or national guidance also recommends disinfection prior to initial start up after a prolonged shut down after routine cleaning operations or when significant alterations have been made to the coo...

Страница 32: ...parts are used Prolonged outdoor stay Should the unit s be stored outside prior to installation and or start up for approximately one month shelf life or longer or stored in severe climates it is imp...

Страница 33: ...ecomaf 2002 30p Guide des Bonnes Pratiques Legionella et Tours A ror frig rantes Minist res de l Emploi et de la Solidarit Minist re de l Economie des Finances et de l Industrie Minist re de l Environ...

Страница 34: ...W W W B A L T I M O R E A I R C O I L E U 34...

Страница 35: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 36: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 37: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 38: ...AGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS EQUIPMENTS SERVICES www BaltimoreAircoil eu info BaltimoreAircoil eu Please refer to our website for local contact details Industriepark Zone A B 2220...

Отзывы: